1LESSONS LEARNED FROM AGING MANAGEMENT
ACTIVITIESMODERNISATION OF THE WWER 440 UNITS
CONSIDERING ASPECTS OF THE LTOJ.ZDAREK,
P.KADECKA
2SUMMARY
- Existing NPPs are secure source of energy. Their
Long Term Operation is strategic goal for any
utility. The US License Renewal process is
closely followed by the IAEA activity and WWER
operating countries. Recent lessons learned from
several Aging Management Programmes (US, IAEA,
WWER) will be summarized.
3 INTEGRATED PLANT REVIEW
Scope
Screen
Aging Mgmt. Review
Passive or Active?
- Systems, components,
- and structures within
- the scope of
- 10CFR54
- Safety-Related
- Non-Safety Related
- that could prevent
- safety function
- Regulated Events
- SBO, EQ, Fire,
- PTS, ATWS
- SCOPE
Passive
Periodically Replaced?
No
Active
Managed by existing activities?
Aging Management Review
No
Yes
Modify existing or add new programs
Yes
Structures Components not subject to Additional
Aging Management Review
Demonstration that the effects of aging are
adequately managed
412 DETAILED AGING ANALYSIS
5THE LTO DATABASE
- Together 6000 SSCs divided to 60 LTO groups
- It is not possible to provide assessment for all
selected 6000 SSCs - Based on engineering judgement and operation
experience 215 type groups defined - For the type groups detailed assessment and
conclusions prepared
6KEY RECOMMENDATIONS FROM THE NPP
- For the type groups where replacement of the SSCs
is standard practice without large cost is
proposed to cancel them from the LTO database.
About 25 out of 215 type groups. - In the assessment to account for existing changes
of material, including all means to prevent
different damage mechanisms e.g. corrosion
7FIRST SET OF REQUIREMENTS FROM THE NPP
- To assure enough spare parts or new components in
case that regular replacement is possible - In all high damage exposed places to accomplish
material replacement with higher damage
resistance - On all components with higher degradation
occurrence to increase maintenance and testing
requirements
8LIST OF PROGRAMMESWITH INPUT TO MODERNISATION
- DB Collation
- Equipment Qualification
- PTS/WPS
- P/T curves
- Civil structures
- SG monitoring
- Sealing Programme
- UT/EC Qualification
- RI ISI
- Cable monitoring
9DB COLLATION
- Detail knowledge of the DB Requirements and DB
Parameters will assure correct modernization
programme - The configuration management programme requires
to have DB data - The License Renewal for the LTO also requires the
DB Collation
10EQ
- Qualification status for about 2200 equipment
per unit within EQ list is established - All equipment from the EQ list is classified in
following categories - Qualified
- Qualified if specified conditions are fulfilled
- Non qualified
- Modernization Programme has to assure qualified
categories within EQ list as principle
requirement for the LTO
11PRIMARY SIDE FAILURES DOMINATE PTS RISK We need
PTS conclusion for WWER. Presented conclusion is
for US PWRs.
- Primary side failures dominate
- Low embrittlement
- stuck open valves that
- later re-close
- Higher embrittlement
- medium large diameter
- pipe breaks
- Secondary
- main steam line breaks
- stuck open valves
- of much smaller consequence,
- only at extremely high embrittlement levels
12P-T CURVES
- 2 types of p-T curves created for NPP Dukovany
- for constant temperature (serving for protection
against low-temperature-over- pressurisation) - for step cool down (serving for protection
against PTS) - Westinghouse methodology applied
- New set of p-T curves generated in 2005 for
underclad cracks with depth 15 mm
13CIVIL STRUCTURES
- Ageing management programme and monitoring shall
be applied on the following components of NPP
structures - soil structure interaction
- design, construction and performance of
- basemat
- vertical concrete constructions (shrinkage,
creep) - ceilings
- roofs
- ways
- operation mode of NPP
- preventive and corrective maintenance
- influence of components modernization
14SG MONITORING
- On-line / periodical
- Chemistry of feed water, blow down
- During shut down
- HOR (Hide out return) MULTEQ pH in crevices
- Outage
- NDT (Visual control, Eddy current.)
- Analyses of removed deposits, withdrawn tubes
- Statistical evaluation of new damage indications
- Database of chemical regimes and tube damage
Electrochemical Evaluation System
on-line information on crevice status ?
on-line solution sampling from crevice ?
15SEALING PROGRAMME
- complex approach to seal assessment
- serrated profile gaskets with pure-graphite
facing MITesHT - applications main circulation pump, steam
generator - replace of nickel seals
- low level of stress for leakage rate class
- low torque
- verification of seal parameters
- great numbers of seal renovation
16UT/EC QUALIFICATION
- NDT Qualification focused on UT/ET qualification
of equipment, inspection procedures (IP) and
additional personnel qualification - UT/ET qualification has to be completed for
majority of inspection areas in 2006 (incl. PHARE
ISI 2002) - In all above aspects Qualified inspections of
Safety Significant and Safety Related inspection
areas required - for extended inspection intervals
- as principle requirement for the LTO
- Missing
- additional personnel qualification (especially by
blind tests) - verification and evidence by computer modelling
(CIVA simulations) for early completed UT/ET
qualifications - verification on realistic type defects for some
qualifications
17RI ISI
- Current Status Verification of selected RI ISI
approach/EPRI methodology for WWER type plants
based on the following pilot studies - LP ECCS at Temelin NPP (ETE)
- Primary piping including pressuriser piping for
Dukovany NPP - Steam and feed water piping (as High Energy
piping) at ETE - Participation in a worldwide benchmark of RI ISI
methodologies and verification on at least 4
selected systems at Ringhals NPP in 2006-2007
(RISMET) - Transition to commercial RI ISI applications
after completion of RISMET project and in case of
approval by SUJB as a requirement for the LTO - Verification of other risk/RI-ISI approaches BER
RI ISI, Streamlined RI ISI, RI Repair/Replacement
18CABLE MONITORING
- Systematic cable ageing management programme is
needed at all NPPs based on cable deposits,
environmental monitoring, cable ageing monitoring
and software system for cable life assessment. - Replacement of degraded cables.
- Relocation of cables to avoid hot spots.
- Modify environment to reduce severe conditions.