29th Operational-MIRS Meeting - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

29th Operational-MIRS Meeting

Description:

Experimental retrieval of wind speed over ocean from emissivity catalogs ... Package, New features of Web site. MiRS 6th Release to OSDPD. MiRS DAP package to be ... – PowerPoint PPT presentation

Number of Views:12
Avg rating:3.0/5.0
Slides: 17
Provided by: Ali1122
Category:

less

Transcript and Presenter's Notes

Title: 29th Operational-MIRS Meeting


1
29th Operational-MIRS Meeting
  • June 12th 2009
  • K. Garrett, F. Iturbide-Sanchez, C. Grassotti,
    and W. Chen

2
Agenda
  • Status Overview of the 6th release of MiRS
    Kevin
  • MiRS Operational Status OSDPD
  • Review of N19 MiRS performances
    Kevin
  • Review of F16 MiRS rainfall rate performances
    Flavio
  • Review of MiRS Package/System/Web-site
    Wanchun
  • Discussions All

3
MiRS Status (1/3)
  • Extension of MiRS to ATMS (NDE integration)
  • Received updated ATMS sample data from IPO, as
    well as resampling code from MIT Lincoln Lab
    (Matlab)
  • Resampled SDRs will be helpful (development,
    daily processing)
  • The usual steps for extension of MIRS to a new
    sensor (bias correction, emissivity covariance
    matrix)

4
MiRS Status (2/3)
NPP Sample ATMS TDRs (from IPO)
Resampled Metop-A AMSU/MHS to ATMS
frequency/geometry (code from MIT LL)
5
MiRS Status (3/3)
  • In the works (but not for the 6th release)
  • Improvements to sounding (investigating Sfc P
    impact both in retrieval and bias correction
    computation)
  • Improvements to the rainfall rate. Training on
    multiple data sources (TRMM, MM5 etc)
  • Experimental retrieval of wind speed over ocean
    from emissivity catalogs

6
Review Aspects
  • We will review performances of products that are
    part of this release
  • Package, New features of Web site

7
MiRS 6th Release to OSDPD
  • MiRS DAP package to be delivered to OSDPD on June
    15th.
  • Package tested daily on all sensors on the STAR
    machines (Linux).
  • Package tested on OSDPD IBM machines as well
    (orbital mode).
  • First official delivery with NOAA-19 processing
    capability.
  • F16 SSMI/S hydrometeor profiles/rainfall rate
    retrieval.
  • Further validation/assessments of the rainfall
    rate.

8
  • Review of NOAA-19

9
Review of NOAA-19
  • NOAA-19 processing capability part of delta-DAP
    delivered on March 23, 2009.
  • Same product set as for NOAA-18.
  • Similar performance relative to NWP, RAOB, TRMM,
    etc. as NOAA-18 for all products.
  • No changes to MIRS components specific to NOAA-19
    since delta-DAP release.

10
Sounding N18/N19 vs GDAS
11
TPW N18/N19 vs GDAS
N19 TPW over Land
N19 TPW over Ocean
N19 Bias 0.376 Stdv 2.159
N18 Bias 0.611 Stdv 2.17
N18 Bias 1.702 Stdv 4.703
N19 Bias 0.648 Stdv 5.153
12
Integrated CLW
N18 vs CloudSat
CloudSat collocation record 02/13/2009-05/27/2009
Stat N18 N19 Corr 0.574 0.599 Stdv 0.123 0.122
Pts 23122 24318
N19 vs CloudSat
Intersensor Comparison distribution by latitude
13
Rain Rate N18/N19 vs TRMM (Ocean)
N18 RR over Ocean
N19 RR over Ocean
N19 Corr 0.519 Stdv 0.465
N18 Corr 0.507 Stdv 0.456
Collocation Record 02/13/2009-06/09/2009
14
Rain Rate N18/N19 vs TRMM (Land)
N18 RR over Land
N19 RR over Land
N19 Corr 0.725 Stdv 0.733
N18 Corr 0.522 Stdv 0.387
Collocation Record 02/13/2009-06/09/2009
15
  • Review of F16 Rainfall Rate

16
F16 Hydrometeor Profiles
F16 Rainfall Rate
Vertical slice of rain ice profiles along
latitude 17ยบ in the Gulf of Mexico 2009-05-22
Write a Comment
User Comments (0)
About PowerShow.com