Kaizen (What is it ?) - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Kaizen (What is it ?)

Description:

Working to Takt Time. Developing a Pull System. freeleansite.com. KAIZEN. WHAT IS IT ... Increase or decrease production based on new takt time. Change the process ... – PowerPoint PPT presentation

Number of Views:497
Avg rating:3.0/5.0
Slides: 13
Provided by: robertb168
Category:
Tags: kaizen | takt

less

Transcript and Presenter's Notes

Title: Kaizen (What is it ?)


1
Kaizen (What is it ?)
  • Lean Foundations
  • Continuous Improvement Training

2
Continuous Improvement Process
Six Sigma Project
Kaizen event
VARIATION
WASTE
5S event
Workplace organization
Rapid Implementation of Known Solution
Problem solving
3
KAIZEN
  • WHAT IS IT
  • Kaizen is a tool originally used by Toyota to
    foster continued improvement within its Toyota
    Production System.
  • It began as "Quality Circles," a means of factory
    shop floor employees solving quality issues
    within a structured team framework, using
    specific new tools.
  • It is now used around the world by many companies
    and has been adapted to suit their individual
    needs and customs.

4
KAIZEN
  • WHAT IS IT
  • Kaizen in the United States usually refers to an
    event of from three to five days of intense
    improvement activities directed at a specific
    area of a business.
  • It is a process based on improving Safety,
    Quality, and Delivery, by the elimination of
    waste (muda) in its many forms.
  • Its main tools are the implementation of
  • One Piece Flow
  • Working to Takt Time
  • Developing a Pull System

5
KAIZEN
  • WHAT IS IT
  • Kaizen events are a way of accelerating
    improvements
  • to improve worker productivity,
  • helping management to find new ways to gain
    substantial savings in time, space and labor
    output.
  • to collapse lead times,
  • reduce work-in-process dramatically,
  • reducing scrap and defects while minimizing the
    need for capital expenditures.

6
KAIZEN
  • A typical 3-5 day Kaizen events consists of
  • Team training (1/2 day)
  • Lean overview
  • Structure of Kaizen event
  • Team conducts Kaizen on the factory floor / area
  • (2-1/2 to 3-1/2 days)
  • Identifying problems
  • Defining current process
  • Observing, sketching process and collecting data
  • Brainstorming suggestions for improvement
  • Implementing solutions (Rearrange equipment,
    Modify machines, change methods, etc)

7
KAIZEN
  • Team measures improvements and verifies solutions
    (1/2 day)
  • Team presents results to management, co-workers
    and shop floor personnel (1/4 day)

8
KAIZEN
  • Kaizen is a way of unlocking the talents and
    abilities of workers and allow decisions to be
    made
  • at the operating level in the organization,
  • in the quickest time,
  • by the people that know the situation the best.

9
KAIZEN Event
  • Type of Projects
  • Eliminate long conveyor assembly lines with cells
  • Combine operations
  • Reduce setup times - SMED
  • Reduce lot sizes, reduce WIP
  • Determine proper tooling needed and organize
  • Visual factory
  • 5S only
  • Establish new metrics
  • Load level schedule
  • Implement new product

10
KAIZEN Event
  • Type of Projects
  • Increase or decrease production based on new takt
    time
  • Change the process
  • Change from automated process to manual
  • Move from one location to another
  • Safety Improvements
  • Maintenance Programs or machine overhaul
  • Process improvement

11
KAIZEN Event
  • Type of Projects?
  • What type of problem or issue might you utilize a
    Kaizen event for ?

12
Kaizen (What is it ?)
  • Lean Foundations
  • Continuous Improvement Training
Write a Comment
User Comments (0)
About PowerShow.com