Continuation of XP442 Scoping Study of Ohmic Hmodes: An Opportunity - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Continuation of XP442 Scoping Study of Ohmic Hmodes: An Opportunity

Description:

OH H-modes obtained for 1st time ever on NSTX last run ... The 1/2 day last run allowed only LSN operation. Need data for double null (DND) ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 10
Provided by: michae641
Category:

less

Transcript and Presenter's Notes

Title: Continuation of XP442 Scoping Study of Ohmic Hmodes: An Opportunity


1
Continuation of XP442 - Scoping Study of Ohmic
H-modes An Opportunity
Columbia U Comp-X General Atomics INEL Johns
Hopkins U LANL LLNL Lodestar MIT Nova
Photonics NYU ORNL PPPL PSI SNL UC Davis UC
Irvine UCLA UCSD U Maryland U New Mexico U
Rochester U Washington U Wisconsin Culham Sci
Ctr Hiroshima U HIST Kyushu Tokai U Niigata
U Tsukuba U U Tokyo JAERI Ioffe
Inst TRINITI KBSI KAIST ENEA, Frascati CEA,
Cadarache IPP, Jülich IPP, Garching U Quebec
C.E. Bush, et al. Oak Ridge National Laboratory
NSTX Research Forum Sept. 22-24, 2004 Princeton,
NJ
2
Results for Ohmic H-mode Scoping Study
  • One-half run day mini-scans in Bt and Ip
  • Some OH-H-modes randomly on other days
  • H-modes at 600 to 900 kA, 3.0 to 4.5 kG TF
  • Short H-mode at Ip 600 kA, Bt 3 kG
  • OH H-modes obtained for 1st time ever on NSTX
    last run
  • Most readily obtained after hot boronization
  • Alternating helium conditioning shots seem to
    help
  • Obtained both double null (DN) and lower single
    null (LSN) divertor
  • Most short duration, some with ELMs and some
    ELM-free
  • Peaked Central ne
  • ELMy Small high frequency ELMs (?) keep ears
    from developing
  • ELM-free have ears, but edge peak lower than
    central ne
  • No turbulence measurements made in core of OH
    H-mode
  • Some edge reflectometer fluctuation data Some
    GPI, no L-H

3
PLOSS for NBI and OH Hmodes
4
Edge measurements (ERD) in Ohmic H-modes show Er
and Vp change prior to L-H transition
Shot 113350
Ip (MA)
H-mode
  • Er and Vp begin to change 10 to 20 ms before L-H
    transition (here at t 0.220 sec)

Er (kV/m)
VT (km/s)
Vp (km/s)
Time (s)
5
Main Work to be Done
  • Obtain longer duration Ohmic H-modes
  • Procedure established last run
  • Make core and edge turbulence measurements
  • Use full set of key diagnostics
  • Determine effect of divertor configuration
  • The 1/2 day last run allowed only LSN operation
  • Need data for double null (DND)
  • Determine applications of OH H-modes
  • Early injection
  • Target for creating ITB/ETB plasma
  • L-H physics the same for OH H-mode as for NBI?

6
EXTRAS
7
OHH-mode with Dithers (DND)
8
ELM-Free OHH-mode (LSN)
9
Concerns
  • Obtaining OHH-mode at desired time
  • Optimize time of transition for application (DND)
    -
  • Parameter Scans (DND)
  • Ip scan 600 kA, 900 kA
  • Bt scan 0.30 T, 0.45 T
  • Repeat B. and C. above for LSN -
  • Application (Need NBI at this point could be
    another day)
  • Early injection using best results above
    (determine NBI) 5 shots
  • Combined Edge and Core Barriers - use best
    results above 6 shots
  • Need available - 100 kV (heat core), 60 kV (other
    heat)
  • Different from early injection shots
Write a Comment
User Comments (0)
About PowerShow.com