Developing a Flexible Capital Improvements Plan That Serves as a Long-term Funding Stream - PowerPoint PPT Presentation

1 / 39
About This Presentation
Title:

Developing a Flexible Capital Improvements Plan That Serves as a Long-term Funding Stream

Description:

Separation of bus, car, and pedestrian traffic was reviewed for both ... Plus sale of land and equipment. Can be used for A&E to get CIP projects planned ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0

less

Transcript and Presenter's Notes

Title: Developing a Flexible Capital Improvements Plan That Serves as a Long-term Funding Stream


1
Developing a Flexible Capital Improvements Plan
That Serves as a Long-term Funding Stream
NSBA Conference Chicago, Illinois April 10, 2006
2
INTRODUCTION Mr. Drew Barrineau, School Board
Member Roanoke County Public Schools Roanoke,
Virginia Mr. Joe McNamara, Board of Supervisors
Member Roanoke County Roanoke,
Virginia DEVELOPING A FACILITIES IMPROVEMENT
PLAN Mr. Richard Flora, Retired Director of
Facilities Roanoke County Public Schools
Roanoke, Virginia DEVELOPING A CAPITAL
FINANCING PLAN Mrs. Penny Hodge, Assistant
Superintendent of Finance Roanoke County Public
Schools Roanoke, Virginia CLOSING Mr. Drew
Barrineau, School Board Member Roanoke County
Public Schools Roanoke, Virginia
3
Introduction
Mr. Drew Barrineau, School Board MemberRoanoke
County Public Schools - Virginia Mr. Joe
McNamara, Board of Supervisors MemberRoanoke
County - Virginia
4
Introduction
  • Relationship between school boards and elected
    governmental bodies in Virginia
  • History of the relationship between
  • Roanoke County School Board vs. Roanoke County
    Board of Supervisors
  • Value of a good working relationship

5
Developing a Facilities Improvement Plan
Mr. Richard Flora, Retired Director of
FacilitiesRoanoke County Public Schools -
Virginia
6
Components of a Facilities Improvement Plan
  • Facility Study
  • Evaluation of Needs
  • Recommendations for Improvements

7
Goals of a Facility Study
  • Inventories school facilities for the
    following
  • - Capacity, enrollments and average class
    sizes
  • - Program provisions and functional issues
  • - Building sizes, ages and construction
    types
  • - Site conditions, including circulation
  • - Exterior and interior building components
  • - Mechanical, plumbing and fire protection
  • - Electrical and lighting systems
  • Identifies deficiencies in each school
  • Provides an estimate of the costs to remedy
    the
    deficiencies
  • Makes recommendations to the School Board

8
  • Factors in Determining Deficiencies
  • Projected Enrollments
  • Pupil/Teacher Ratio
  • Site Circulation
  • Safety and Security
  • Heating, Ventilation, Air Conditioning
    Electrical
  • Pre-K Special Ed. Programs

9
Determining Deficiencies
  • Projected Enrollments
  • Rationale for determining the projected
    enrollments
  • Elementary school enrollments were derived from
    utilizing the schools current enrollment
    figures, historical enrollment data and the
    current growth pattern.
  • Middle school enrollments were calculated by
    utilizing the current enrollment figures from
    each elementary school feeder for the 3rd, 4th,
    and 5th grades.
  • High school enrollments were calculated by
    utilizing the current enrollment figures from
    each middle school feeder for the 6th, 7th, 8th,
    and 9th grades.

10
Determining Deficiencies
  • Pupil/Teacher Ratio
  • All facilities were sized to accommodate students
    with a pupil/teacher ratio of 20/1 for grades
    K-5 and 16/1 for
  • Pre-K.
  • For Grades 6-12, a pupil/teacher ratio of 25/1
    was
    calculated.
  • A 20/1 ratio is currently being used through the
    second

    grade. This ratio will effect the
    operating capacity of
  • each school facility by approximately 20 percent.

11
Determining Deficiencies
  • Site Circulation
  • Separation of bus, car, and pedestrian traffic
    was reviewed for both safety and convenience.
  • Bus loading and unloading should occur in an area
    where cars are prohibited.
  • The area should be large enough to accept all
    buses without interfering with car or pedestrian
    traffic.
  • Identification and location of the schools main
    entrance and proximity to parking areas was
    reviewed.
  • Visitors and staff should not have to cross car
    or bus traffic to enter the building.

12
Determining Deficiencies
  • Safety and Security
  • Administrative offices should be able to closely
    monitor the main entrance and control entry.
  • All exterior doors should be able to be locked,
    utilizing an acceptable hardware, from the
    outside without the use of an interior
    restraining device.
  • Acceptable lighting levels, spacial definition of
    areas, and surveillance systems should be
    included in any major renovation or addition.

13
Determining Deficiencies
  • HVAC and Electrical
  • Heating, Ventilation, Air Conditioning and
    Electrical systems were evaluated by the
    schools maintenance department.
  • The criteria used to determine the HVAC and
    electrical components condition was based on the
    age of the particular component and compared to
    typical life cycle expectancies.
  • Those components which have exceeded their
    functional life and are, therefore, prone to
    failure were identified..

14
Determining Deficiencies
  • Pre-K and Special Ed.
  • Pre-K and self-contained Special Ed. programs
    were included in the prototypical space
    programs.
  • Pre-K classrooms were evaluated at every
    elementary school to determine if classroom
    space will exist based on the projected
    enrollments.
  • Pre-K classrooms are larger and have different
    amenities than a typical classroom.
  • Each elementary school may require an addition or
    renovation in order to accommodate the
    additional Pre-K classrooms.
  • The number and locations of existing or proposed
    self-contained special ed. programs was provided
    by the Special Ed. Department.

15
Components of a Facilities Improvement Plan
  • Facility Study
  • Evaluation of Needs
  • Recommendations for Improvements

16
Prototype Space Programs
  • Elementary School
  • Small
  • Medium
  • Large
  • Middle School
  • High School

17
  • MOUNTAIN VIEW ELEMENTARY NEEDS OVERVIEW
  • HVAC improvements or replacements
  • Widen or replace existing narrow corridors
  • Add corridors to classrooms where none
    currently exist
  • Expand administrative area to include
    guidance and nurse
  • Additional classrooms
  • Upgrade of kitchen equipment
  • Additional general storage
  • Expand media center to include office and
    storage
  • Address ADA concerns

18
Priority Criteria for Evaluation of Needs for
Facilities Improvements
  • SCENARIO ONE
  • Reflects a score based on a criteria applying
    a 20/1 pupil teacher ratio through all grades.
  • Uses the prototype school at the elementary,
    middle and high school levels.
  • The needs were given weight based on the
    current value placed on each instructional
    area.

19
Priority Criteria for Evaluation of Needs for
Facilities Improvements
  • SCENARIO TWO
  • Reflects a score based on the criteria
    applying a 20/1 pupil teacher ratio in
    elementary schools and a 25/1 pupil teacher
    ratio in middle and high schools.
  • The prototype for all schools was also used
    in this scenario.
  • The needs were given weight based on the
    current value placed on each instructional
    area.

20
Priority Criteria for Evaluation of Needs for
Facilities Improvements
  • SCENARIO THREE
  • Reflects a score based on the criteria
    applying a 20/1 pupil teacher ratio in
    elementary schools and a 25/1 pupil teacher
    ratio in middle and high schools.
  • The prototype for all schools was not used in
    this scenario.
  • The needs were given weight based on the
    current value placed on each instructional
    area.

21
Components of a Facilities Improvement Plan
  • Facility Study
  • Evaluation of Needs
  • Recommendations for Improvements

22
Recommendations for Facilities Improvements
SCENARIO-THREE was used to determine the
priority for facilities improvements. This
scenario best reflects the immediate needs using
the most realistic criteria. A pupil teacher
ratio of 20/1 in elementary schools is already
becoming a reality. It is expected that the
progress made to date will be sustained in the
future. Because of current funding challenges,
moving to a 20/1 pupil teacher ratio in the
secondary schools will, most likely, not become a
reality until some future date. Although using
prototype schools is desirable, it makes more
sense to apply the prototype concept to the
renovation process and not as a part of the
evaluation process. Conceptual designs and the
cost estimates were provided with this study
integrated the prototypical school as a factor
in the elements of this report.
23
Developing a Capital Financing Plan
Mrs. Penny Hodge, Assistant Superintendent of
FinanceRoanoke County Public Schools - Virginia
24
Background
Phase 1 - 48 million (began in 1997) New high school New elem school Renovate 3 schools
Phase 2 - 23 million (began in 2002) Renovate 3 schools Stadium renovations
Phase 3 - 65 million Debt capacity exhausted
25
What we were facing in 2005..
  • 30 schools in Roanoke County
  • 8 built/renovated in Phase 1 or 2
  • 22 schools remaining with capital needs
  • Vast majority of schools gt 30 years old (Approx.
    75)
  • County government needs growing
  • 28M Public Safety Facility planned

26
Our concept hinges upon..
  • Complimentary school and county financial
    policies
  • Use of year end balances
  • Annual commitment of set amount of
  • new money

27
Past practices that helped
  • In budgeting .revenue sharing
    allocation
  • In year end rollover of year end
    surplus

28
Policies Needed
  • Establish School Capital Reserves
  • Use of School YE Balances
  • Establish County Capital Reserves
  • Use of County Unspent YE Expenditures
  • Use of County Revenues in Excess of Budget

29
Reserves Created
  • Combined Debt Payment Reserve
  • School Major Capital Reserve
  • School Minor Capital Reserve
  • County Major Capital Reserve
  • County Minor Capital Reserve

30
Combined Debt Payment Reserve
  • Began with 2M annual contribution in 1996 (to
    build new high school)
  • Add new 600,000 from county schools each year
    (beginning in 2005-06)
  • Plus debt drop-off over time
  • Plus economic development incentive drop-off over
    time
  • Results in incrementally growing reserve

31
This is how it grows.
2004-05 2,000,000
2005-06 2,600,000
2006-07 projected 3,200,000
2007-08 projected 3,800,000
32
School Major Capital Reserve
  • Use for projects on annually adopted CIP
  • Land as it becomes available
  • Fund with 2/3 of YE balance
  • Plus state construction grants
  • Pay cash for smaller projects
  • Supplement borrowing for larger projects

33
School Minor Capital Reserve
  • Use for smaller capital projects (lt500,000) and
    one-time needs
  • Fund with 1/3 of YE balance (up to 1M)
  • Plus sale of land and equipment
  • Can be used for AE to get CIP projects planned
  • Can also be used for CIP projects

34
County Major Capital Reserve
  • Use for major projects on County CIP
  • Fund with YE revenues in excess of budget after
    meeting Unappropriated Balance Policy limits

35
County Minor Capital Reserve
  • Use for minor county capital projects
  • Fund with YE expenditure savings

36
What can we fund now?
2006-07 10M Schools 20M County
2007-08 10M Schools 10M County
2008-09 10M Schools
2009-10 10M Schools
2010-11 10M County
Future funding pattern of 2 years schools and 1 year county projects. Future funding pattern of 2 years schools and 1 year county projects. Future funding pattern of 2 years schools and 1 year county projects.
37
Debt Projection Plan
  • F\NSBA handout 2.xls

38
Success is based upon
  • Properly timed bond issues
  • Available cash accumulated in
  • Major/Minor reserves
  • No tax increases needed
  • Funds 40M for schools and 40M for
  • county over next 5 years
  • Ensures funding for future School Boards

39
Closing
Mr. Drew Barrineau, School Board MemberRoanoke
County Public Schoolswww.rcs.k12.va.us