H8 Beam Test in 2003 - Preparation status

Description:

To do list for beam test at H8. Validate the design of Muon Endcap ... TTCrx and fanout. DCS to TTCrx setup. CF 16/Feb/2003. 6. HS Crate (Hi-pT, SSW, HSC) H-pT ... – PowerPoint PPT presentation

Number of Views:11
Avg rating:3.0/5.0
Slides: 11
Provided by: chikaraf
Learn more at: http://www.comp.tmu.ac.jp
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: H8 Beam Test in 2003 - Preparation status


1
H8 Beam Test in 2003- Preparation status
  • TGC-Japan electronics group

2
To do list for beam test at H8
  • Validate the design of Muon Endcap Trigger
    Electronics
  • With electronics and software, which have been
    used in the present slice test (s) of end-to-end
    full chain LV HV DCS others
  • With TGC 7 layers using 3 T8 units
  • Take data from TGCs together with ones from MDTs
  • Integrate the system with MuCTPI and CTP

3
Trigger Electronics
4
Slice test results and status
  • Level 1 Trigger electronics
  • Comparison of trigger I/O patterns with
    Simulation
  • 1-track hit 10000 patterns checked
  • 2-tracks hits 10000 patterns checked
  • 2 tracks hits check undergoing
  • Latency (from pp collision to MuCTPI input)
  • measured and estimated as 1205ns (TDR 1250ns)
  • Read-out chain with SSW and Test-ROD
  • FPGA version SSW ready, firmware not yet coded
  • SSW must be installed in Slice test setup till
    1st week of March
  • Test ROD functionality confirmed, performance
    measured with PT4 module (general purpose G-link
    test VME module)

5
PS-Pack (PS board, SPP)Some newer components for
beam test
  • PS board
  • New PS boards (ready) for
  • New PP ASICs
  • 32 channel inputs
  • PRR passed
  • New JRC ASICs
  • PRR passed
  • Present SLB ASICs
  • Known bug
  • (OK for the beam test)
  • DCS (eLMB)
  • Chamber Charge Monitor
  • Low Voltage
  • Vth
  • JTAG
  • Service Patch Panel (ready)
  • TTCrx and fanout
  • DCS to TTCrx setup

6
HS Crate (Hi-pT, SSW, HSC)
put on outside of H8
  • H-pT
  • 2 H-pT ASICs (W/S)
  • Full spec., PRR passed
  • G-link ? SL
  • SSW (2 boards for W/S)
  • FPGA version
  • Firmware is being coded
  • HSC (? CCI)
  • JTAG Configuration
  • Completed but not full tested (needs SSW)
  • eLMB (DCS)

7
ROD crates
  • Test ROD crate
  • Test ROD
  • Performance tested with slice test
  • CCI
  • Performance tested with slice test
  • TTCvi
  • TTCrx fan-out
  • VME I/F via Bit3 and PC
  • ROD crate
  • ROD
  • VME with RCP

Put in H8 hut
8
DAQ
  • Data from both RODs must be fed to ROB
  • Two different S/Ws for two different ROD crates
  • Run controller integration and database merging
    have been discussed in Roma in Jan. 2003
  • Common development environment/framework
  • ATLAS Online Software 00.17.01
  • Common Database

9
Software components
PCDAQ
Root controller
Online S/W servers
Sync. controller
TGC Root
Conf D.B
J controller
I controller
10
Schedule
  • Slice test in KEK ( Now ? 3 7 Mar.)
  • SLB chip revision, bug fix and submit on Feb.,15
  • SSW firmware code completion and readout test
    with SSW and T-ROD till 7 Mar.
  • Test setup with TGC in Kobe (3 ? 19 Mar.)
  • 3-10-15 Mar. Chamber Electronics DCS
    Integration
  • Japanese TGC members Nachman Israeli
    Students
  • 15-19 Mar. SSW-ROD DAQ integration
  • Japanese TGC members Lorne Daniel
  • Beam Time at H8 (24 May ? 3 June)
  • Chamber Installation (15 Apr. ? )
  • DAQ integration, Commissioning (15 May ? )