Title: Linac Test Area Instrumentation Update


1
Linac Test AreaInstrumentation Update
  • M. Haney, D. Errede,Z. Conway
  • University of Illinois at Urbana-Champaign
  • 14 June 2002

2
Instrumentation
  • Need safe solution for instrumenting the LH2
    absorber in the LTA
  • Prudent to accommodate MICEand European safety
    considerations
  • i.e. do it right the first time

3
Primary Objective - Safety
  • Intrinsic safety, if possible
  • Less than 1 watt (per channel?)
  • Good idea for Fermi required for Europe
  • Gas-purged enclosure, if necessary
  • 19 rack, 40U tall

4
Signals inside (the cryostat)
  • 12 (cryo) temperatures
  • readout via GPIB LabView (PC)
  • 25(ish) 4-wire bolometry strips
  • Multiple fibers
  • FISO strain gages
  • Laser occlusion?
  • Simple spark detectors
  • (light pipe to photodiode)

5
(more) Signals inside
  • USB (4 wires, and shield) for CCD camera
  • via PC
  • Piezo vibration sensor
  • via (16 chan/12 bit) ADC and LabView (PC)
  • Local (64 chan/16 bit) IRM channels
  • via LabView (see last slide)
  • MICE channels (?)
  • placeholder for the future

6
Signals outside
  • Many voltages, currents, temperatures, pressures
  • magnets, beam position monitors, etc.
  • Most available from ACNET or local IRM
  • via LabView (see last slide)
  • or Cyro-PLC
  • and Intellution

7
Two Possibilities (1)
  • Intrinsically safe

Hazard Safe
Sealed Conduit(s)
Barrier(s)
ACNET
IRM
Cryo(temp)
FISO
PC w/32 chan ADC
network
power
Intrinsically safe signal conditioners and
transmitters
UPS
8
Two Possibilities (2)
  • Gas-purged box

Hazard Safe
Barrier(s)
Sealed Conduit(s)
ACNET
IRM
Cryo(temp)
FISO
PC w/32 chan ADC
network
power
UPS
9
(basic) Barrier
fuse
Power Signal
safe circuit
Return
Ground
10
This Summer Z. Conway
  • LabView interface
  • GPIB
  • ADC
  • IRM

11
Open Issues
  • Local signal condition vs Purged box
  • Common mode concerns (noise from magnets)
  • Especially surge currents on start/stop
  • Long wires!
  • 2-wire vs 4-wire solutions
  • Shielding and noise sensitivity in general
  • Cable plant size concern
  • (already 200 wires, not including shielding)

12
Open Issues (2)
  • LabView vs C
  • to read ACNET data (mostly, IRMs outside of the
    experiment)
  • Remote control of PC
  • Citrix ICA, PCAnyWhere, etc.
  • LabView web-remote instrumentation
  • KVM?