Title: Modern HMI Concepts And Engineering Documentation Tools For Nuclear Power Plants
1Modern HMI Concepts And Engineering /
Documentation Tools For Nuclear Power Plants
- Peter Papajewski
- IAEA Technical Meeting Chatou, France
- September 2005
2Contents
- Single Window To The Process
- Sophisticated Power Plant Engineering and Online
Documentation Tool
3Single Window To The Process
- Actual Situation
- Analogue, hard wired I C technologies
- Rudimentary proprietary digital control systems
- Hybrid control rooms
- Existing systems are obsolete and expensive to
maintain - Limited expandability
4Single Window To The Process
- Advanced Control Room Approach
- One type of VDU for the whole plant
- Full access to all plant data and controllers
- Based on an open system architecture, total
integration of specific, diverse subsystems - More effective training process oriented
- Interoperability between HSI, DCS and specific
subsystems - Plant life-time support philosophy
5Single Window To The Process
- Basics
- COTS (Commercial Off The Shelf) Product
- Truely open system architecture
- 3rd party subsystems easy to interface and
integrate - HSI/DCS based on Hardware, Software
Communication Standards - Solaris and/or MS-Windows XP OS
- Sun Workstations and/or Standard PCs
- Ethernet 100 MBit / 1 GBit MESH network
6Internet / Intranet Client
- Personal Computer-
- W95/98,2000,NT,XP
- X-Terminal
- Terminal Server Client
- Web-Server
- Office-Client
- Data analyser
Server/ Computer Unix / VMS etc.
Historian Server/Client
2nd Ethernet - TCP/IP, Novell, DECnet, NFS, SNA,
X.25, OSI
Office Network
Mobile Workstation
optional
Applikation - Workstation
Workstation
Applikation-Workstation Server
Workstation
(redundant)
Systembus / MESH Ethernet 100 MBit/1Gbit Fibre
Control Processor (redundant)
Triconex TMR FS-PLC (TÜV AK6 / NRC SER)
(redundant)
Alarm Management
(redundant)
(redundant)
7Single Window To The Process
- Advantages Benefits
- Easy integration of existing subsystems by a wide
set of standard interfaces (library of more than
100 different interfaces available) - Single point of plant information
- Whole DCS application suite available for all
subsystems - reporting, alarming, historical data archiving,
- Unique and plantwide data validation
- Monitoring of safety and safety-related
subsystems - One common database distributed over the system
- Plant Focused Operator Training
- Plant lifetime support strategy
8Single Window To The Process
- Reference
-
- Lungmen project - GE ABWR
- 30 diverse subsystems are integrated by standard
interfaces into one HMI System - Reactor Protection
- Other Safety Systems
- Neutron Flux Monitoring System
- Turbine Protection and Turbine Controller
- Many other systems
9Lungmen Advanced Control Room
Single Window To The Process
10Engineering / Documentation Tool For Plant Life
Cycle Information Management
Sophisticated Power Plant Engineering and
Online Documentation Tool for Life Cycle Asset
Information Management
11Engineering / Documentation Tool For Plant Life
Cycle Management
- LCAIM (n. abbr.)
- Life Cycle Asset Information Management
- Ensuring that the documents and plant
information of all physical assets professional
managed during the life cycle of the capital
facilities, from the Front End Engineering Design
to the de-commissioning.
12Structured Data The Information Format
neededfor Life Cycle Asset Information Management
ISO 15926 XML
Structured Data Model
Structured Data
Word Excel AutoCAD
As Built 3D
Native File
Life Cycle Asset Information Management
Increasing sophistication of Information Forms
and cost of conversion from hard copy
TIFF PDF
Electronic Image
Hard Copy
Workflow for Creation
Content Management
Filing Retrieval
Tracking Monitoring
Increasing sophistication in Information
Management and business benefit
Requirement Consistent structured plant data
13Engineering / Documentation Tool For Plant Life
Cycle Management
Information driven
Quality and quantity of engineering information
Intelligent standards
EPC
Data erosion
Document driven
Data erosion
Operation and maintenance 25-40 years
Handover from EPC to OM
commisioning 6 month
sales
EPC 2-4 years
14Life Cycle Management-Where you are ?
Simulation
Process Data Sheets
PFD
Ressourcen-management
Functions Plans
Circuit Diagrams
Electric Docum.
??
Loops
3D Floorplans
Hook-Ups
P ID
Maintenance
2D Floorplans
3D Piping
Techn. Data Sheets
Piping CLasses
15Engineering / Documentation Tool for Plant Life
Cycle Management
- Reality
- EPC and Owner Information and Knowledge
Management Approach is still document driven - The EPC documents and drawings handed over from
the EPC to Owner and OM does not reflect the
actual plant. - More then 60 of the information in data sheets,
drawings and other documents are inaccurate or
incomplete or not consistent! - OM Engineers spend more then 50 of their time
looking for documentation and information a
very costly misuse of resources!
16Engineering / Documentation Tool For Plant Life
Cycle Management
17Unified object oriented Database
Engineering / Documentation Tool For Plant Life
Cycle Management
Object Database
VGB 170C Function Plan
Field
Hook-Ups
Cabinets
18Concurrent Engineering
Engineering / Documentation Tool For Plant Life
Cycle Management
Detail Engineering
Basic Engineering
- Improved Accuracy
- Improved Productivity
- Reduced Engineering Costs
- Simplified Maintenance
DCS System Configuration
19Comos PT - I/A Series Concept
PID
Engineering
20Comos PT - I/A Series Concept
PID
Engineering
Control Engineering
21Comos PT - I/A Series Concept
PID
Process Engineering
I/A-I/O Cabinet
DCS Cabinet- Layout
Control Engineering
22Comos PT - I/A Series Concept
I/A FoxCAE TAG- List
PID
Process Engineering
I/A-I/O-Cabinet
DCS Cabinet Layout
Control Engineering
23Comos PT - I/A Series Concept
Import
Comos PT
Export
Toolkit
FoxCAE
I/A System
24Comos PT - I/A SeriesConcept
Generate Databasewith FoxCAE
Objects are known in the whole System
25Valve module
26Valve module
27COMOS PT - I/A Series Interface
click FUP
Get the related FUP detail
28Dynamic
29Engineering / Documentation Tool For Plant Life
Cycle Management
LCAIM world class O/O
LCAIM world class EPC
LCAIM Integration with DCS, ERP, Simulator, etc.
Option 1 LCAIM Requirements Before signing
EPC Contract
Quality, Quantity of Plant Asset
Information Business Benefit
Plant Information for O/O without LCAIM Approach
Option 2 LCAIM Start during EPC
Option 3 LCAIM Start after Handover during OM
Plant Information for EPC without LCAIM Approach
Tender
Operation Maintenance
E
Refurbishment
Commission
P
C
OM
LCAIM Requirements defined before signing the EPC
Contract
30COMOS PT Virtual Project Room
Viewing Web-Navigation (Virtual Project Room)
Integration Navigation
Web-enabled document checking-in
3rd Party Interfaces
Engineering Functionalities
Data Import Export (Excel)
3rd Party Application Integration
Centralized COMOS Database
Integrated Document Management System and
Project Quality Control
COMOS PT Integration Platform for the EPC and
O/O a real Virtual Project Room for global
Project Execution
31I/A Series Interface - Benefits
- Data consistency
- Data transparency (process eng.,meas. control
strategy, PCS) - Complete electronic documentation
(basic-eng.,detail-eng.,startup, commissioning
and maintenance) - Complete plant and site documentation
- Open and flexible interfaces (API, VisualBasic,
etc.) - Concurrent engineering concept
- Multi-user capability
- Customer specific documentation
- reduced engineering time
- Graphical configuration
- Re-useable engineering (prototyping, typicals,
ToolKit) - Complete documentation is available on every DCS
WS - User can manoeuvre within the complete
documentation
32Internet / Intranet Client
- Personal Computer-
- W95/98,2000,NT,XP
- X-Terminal
- Terminal Server Client
- Web-Server
- Office-Client
- Data analyser
Server/ Computer Unix / VMS etc.
Historian Server/Client
2nd Ethernet - TCP/IP, Novell, DECnet, NFS, SNA,
X.25, OSI
Office Network
Mobile Workstation
optional
Applikation-Workstation Server
Applikation - Workstation
Workstation
Workstation
COMOS Server
(redundant)
Systembus / MESH Ethernet 100 MBit/1Gbit Fibre
Control Processor (redundant)
Triconex TMR FS-PLC (TÜV AK6 / NRC SER)
(redundant)
Alarm Management
(redundant)
(redundant)
33- Questions ? ?
- Thank You
- For Your
- Attention
- Contact