Title: Lessons Learned US Highway 20: Pioneer MountainEddyville Project


1
Lessons LearnedUS Highway 20Pioneer
Mountain-Eddyville Project
DEE JONES State Right of Way Manager Oregon
Department of Transportation
2
US 20 PME
  • US 20 is a major route connecting the Willamette
    Valley with the central Oregon coast. It is an
    important travel corridor and provides local
    access for Lincoln County. This is the last
    significant unimproved section of US 20 between
    Newport and the Willamette Valley.

3
(No Transcript)
4
US 20 PME
  • First Design-Build project in Oregon for New
    Alignment
  • Hired Program Management Consultant (20 million)
    for
  • Design-build procurement
  • Contract administration
  • EIS completion
  • Right of Way acquisition (Phase 2)
  • 2005 Design Build Contract 130 million

5
US 20 PME
Major Elements
  • 3 Multiplate Culverts
  • 1.5 miles haul roads plus 7 mile of temp road
    improvements
  • 67,000 tons Asphaltic Pavement
  • 610,000 yards Blasted rock
  • 13,000 linear feet new drainage
  • 110,000 tons aggregate base
  • Labor peak with subs 150 employees
  • 90 of labor is local
  • 100 of subconsultants have Oregon presence
    beyond PME
  • 4,000,000 yards of earth movement
  • (enough to fill OSU Reiser Stadium about 3 times)
  • 10 Bridges 29 spans, 4,140 total feet
  • 8 temporary bridges load rated for heavy haul
    trucks, spanning approximately 900 feet

6
Looking Westward across the Coast Range
7
US 20 PME
  • Project Shutdown in 2007
  • Discovered ancient landslide areas
  • Contractor had clear cut construction areas
  • Led to erosion issues, impacted streams and fish
  • Renegotiated DB contract added 47 million
  • Construction restarted in 2008
  • ODOT took over construction inspection and
    environmental compliance

8
US 20 Pioneer Mountain to Eddyville
Landslide Complexity of PME Area
North
Yaquina River
Cougar Creek
Crystal Creek
Eddy Creek
New alignment
Algorithm of 10m DEM From University of Oregon
Red is not good
9
US 20 PME
10
(No Transcript)
11
East view
12
September 2007
December 2006
Crystal Creek
13
US 20 PME
  • Right of Way Issues
  • ODOT acquired 1st phase before DB contract (13
    files)
  • EIS 354 acres of right of way from 23 properties
  • After shutdown and redesign another 110 acres
    from 10 properties
  • Acquired multiple takings from same properties
  • 4 takings from one timber company

14
US 20 PME
  • Right of Way Issues
  • Right of Way input to EIS and Design could have
    been better coordinated
  • Private logging roads and fire suppression ponds
    designed for reestablishment within state highway
    right of way
  • Hand-shake deals by contractor for driveway and
    road reconnections
  • Some highway features drainage detention ponds
    not able to access from right of way
  • Access for maintenance to these features was
    assumed over private logging roads

15
US 20 PME
  • Right of Way Issues
  • Lack of right of way input to EIS and DB contract
  • Commitment to restore spring-fed water source to
    occupied home
  • No offer made for owners real property, no
    appraisal of damages
  • ODOT took over negotiations, made formal offer
  • Need possession, but cure not yet designed
  • Drilling well owner still has to accept and sign

? Bottom Line DOT must stay connectedto
oversight of project.
16
US 20 PME
17
(No Transcript)
18
(No Transcript)