Title: Simple winddiesel concept with high wind penetration in Cape Verde


1
Simple wind-diesel conceptwith high wind
penetrationin Cape Verde
  • Per Nørgård, Risø DTU, Denmark, pern_at_risoe.dtu.dk
  • João Fonseca, Electra, Cabo Verde,
    j.fonseca_at_electra.cv

2
Cabo Verde
  • Independent (from Portugal) in 1955
  • Population 500 000 at 10 islands
  • Islands in study
  • Santiago
  • São Vicente
  • Sal
  • (Boa Vista)

3
Cabo Verde
  • Risø DTU as Technical Consultant
  • for InfraCo (international project developer)
  • in collaboration with Electra (local power
    utility company)
  • Power generation based on diesel generation
  • Excellent wind conditions
  • High average wind speeds most of the year
  • Very constant wind
  • Low extreme wind speed

4
Growing demand
5
IPSYSan energy system simulation tool
  • Characteristics
  • Semi-static time series simulation (minutes time
    steps)
  • Includes storage and memory functionalities
  • Designed for mixed energy systems
  • Performs energy balances and load flow analysis
    (power systems)
  • Handles advanced and distributed control
  • Developed by Risø DTU

6
Simplified single line diagrams
7
Operation strategy
  • Minimum continuous diesel load
  • Minimum instantaneous diesel load
  • Minimum spinning reserve diesel capacity
  • Minimum diesel capacity
  • Minimum number of diesel generator units
  • Minimum diesel operation time
  • Minimum continuous load of the diesel engines
    30 (optional 50).
  • To prevent the diesel engines from sooting up at
    low load.
  • The wind power generation may be limited to
    fulfil this condition.

8
Operation strategy
  • Minimum continuous diesel load
  • Minimum instantaneous diesel load
  • Minimum spinning reserve diesel capacity
  • Minimum diesel capacity
  • Minimum number of diesel generator units
  • Minimum diesel operation time
  • Minimum instantaneous load of the diesel engines
    10.
  • To prevent for negative load of the diesel
    generators.

9
Operation strategy
  • Minimum continuous diesel load
  • Minimum instantaneous diesel load
  • Minimum spinning reserve diesel capacity
  • Minimum diesel capacity
  • Minimum number of diesel generator units
  • Minimum diesel operation time
  • Minimum spinning reserve diesel capacity
    connected to the grid
  • 200 of the observed fluctuation of the diesel
    load within the last hour and
  • minimum 50 of the actual diesel load (if
    possible).
  • To be prepared for the fluctuations in the wind
    power and in the load.

10
Operation strategy
  • Minimum continuous diesel load
  • Minimum instantaneous diesel load
  • Minimum spinning reserve diesel capacity
  • Minimum diesel capacity
  • Minimum number of diesel generator units
  • Minimum diesel operation time
  • Minimum diesel capacity connected to the grid
  • 2 times the wind capacity connected to the grid.
  • To ensure dynamic stability of the system.
  • _at_ low load high wind
  • wind turbines are shut down
  • -gt diesel generators shut down

11
Operation strategy
  • Minimum continuous diesel load
  • Minimum instantaneous diesel load
  • Minimum spinning reserve diesel capacity
  • Minimum diesel capacity
  • Minimum number of diesel generator units
  • Minimum diesel operation time
  • Minimum number of diesel generator units
    connected to the grid
  • 2
  • Not to rely on a single diesel generator unit.

12
Operation strategy
  • Minimum continuous diesel load
  • Minimum instantaneous diesel load
  • Minimum spinning reserve diesel capacity
  • Minimum diesel capacity
  • Minimum number of diesel generator units
  • Minimum diesel operation time
  • Minimum operation time of a diesel engine
  • 4 hours.
  • To limit the number of start / stop of the diesel
    engines.

13
Load profiles(3x3 days)
14
Seasonal variation of wind
15
IPSYS results (Sao Vicente)
16
Summary of results
17
Not utilised wind energy
1 p.u. 20 wind energy penetration
18
Avoided diesel fuel
1 p.u. 20 wind energy penetration
19
Minimum diesel load (2012)
20
PPA Power Purchase Agreement
  • Minimum wind energy leveltake pay _at_ high
    tariff
  • Motivates wind power operatorto maximise
    production
  • Additional wind energy_at_ low tariff
  • Motivates diesel operatorto optimise operation

21
Conclusions
  • The most critical operation parameter is the
    minimum diesel load.
  • Even at 40 wind energy penetration, the not
    utilised wind energy is only 10.
  • 20 overinvestment in wind power capacity is
    proposed
  • 22 MW -gt 28 MW -gt 0..10 not utilised wind
    energy.
  • This seems economically feasible at 5 reduced
    generation cost (/kWh), with the expected demand
    growth.

22