PRESENTATION TO MARINE FISHERY COMMISSION HABITAT AND WATER QUALITY COMMITTEE Washington, NC March 1

Description:

Carolina Beach, NC. November 12-13, 2007. John Sutherland, Division of Water Resources ... NORTH CAROLINA BEACH AND INLET MANAGEMENT PLAN ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 28
Provided by: johns286
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: PRESENTATION TO MARINE FISHERY COMMISSION HABITAT AND WATER QUALITY COMMITTEE Washington, NC March 1


1
(No Transcript)
2
2007 NCBIWA ANNUAL CONFERENCE Carolina Beach,
NC November 12-13, 2007 John Sutherland,
Division of Water Resources NORTH CAROLINA WATER
RESOURCES DEVELOPMENT PROGRAM
3
  • OUTLINE
  • Introduction
  • Some Examples
  • Background
  • Grant Categories
  • Application Process
  • NC Beach and Inlet Management Plan

4
Introduction
  • Original Purposes Non-federal cost-share of
    state-sponsored projects and non-federal
    cost-share of locally-sponsored projects
  • Other purposes state local grants and
    state-sponsored projects, such as dam removal
    projects

5
EXAMPLES
  • Navigation channels for major ports
  • Shore protection projects
  • Multi-purpose reservoirs
  • Small navigation, flood control environmental
    restoration projects

6
OTHER EXAMPLES
  • State-local projects
  • State-sponsored projects
  • Water resources projects funded by the North
    Carolina General Assembly

7
(No Transcript)
8
(No Transcript)
9
EXAMPLE FESTIVAL PARK SHORELINE RESTORATION AND
PROTECTION PROJECT (BEFORE CONSTRUCTION)
10
EXAMPLE FESTIVAL PARK SHORELINE RESTORATION AND
PROTECTION PROJECT (AFTER CONSTRUCTION)
11
Water Based Recreation
12
Shoreline Protection and Access
13
Aquatic Weed Control Alligatorweed
14
BACKGROUND
  • Prior to 1979, each project approved separately
  • After the passage of G.S. 143-215.70-.73 in 1979,
    projects grouped together
  • Rules for grant program found in
  • 15A NCAC 02G.0102 - .0107

15
BACKGROUND
  • Annual Funding Amounts
  • Early years 500,000 to 2,000,000
  • Recent years 12,000,000 to 32,000,000

16
GRANT CATEGORIES
  • Project Categories and Cost-Sharing Percentages
  • General navigation, 80
  • Recreational navigation, 25
  • Water management, flood control and drainage, 66
    2/3

17
Project Categories Continued
  • Stream Restoration, 66 2/3
  • Beach Protection, where public access is
    provided, 75
  • Water-based recreation, 50
  • Aquatic weed control, 50

18
APPLICATION PROCESS
  • FEDERAL PROJECTS
  • Division of Water Resources semi-annual meeting
    with Wilmington District
  • Division of Water Resources coordination with
    local sponsors

19
APPLICATION PROCESS
  • STATE-LOCAL PROJECTS
  • Two cycles per year July 1 and Jan. 1
  • Review and approval
  • Application package can be found online at
    www.ncwater.org under Financial Assistance.

20
NORTH CAROLINA BEACH AND INLET MANAGEMENT PLAN
  • PURPOSE Comprehensive management plan for the
    States 328 miles of oceanfront beaches and 19
    active tidal inlets
  • BACKGROUND Management of the States inlets and
    beaches currently achieved through multiple
    programs and projects

21
NORTH CAROLINA BIMP
  • BACKGROUND CONTINUED
  • Three major legislative initiatives
  • 1. Beach Management and Restoration
  • Strategy Section 13.9c of HB 1840
    (Approp. Act of 2000) requires a multiyear
    beach management and restoration strategy and
    plan

22
NORTH CAROLINA BIMP
  • BACKGROUND CONTINUED
  • 2. Recommendation 3.2 of the Coastal
    Habitat Protection PLAN(CHPP) requires a
    comprehensive beach and inlet
    management plan

23
NORTH CAROLINA BIMP
  • BACKGROUND CONTINUED
  • 3. NC General Assemblys 2005 study of
    shallow draft navigation provides
    alternative maintenance strategies

24
NORTH CAROLINA BIMP
  • CURRENT STATUS
  • 1. Contract with Moffatt Nichol
    Engineers to complete a NC
  • BIMP by December 31, 2008

25
NORTH CAROLINA BIMP
  • Work Outline
  • a. Data identification and acquisition
  • b. Define beach-inlet manage. regions
  • c. Dev. draft management strategies
  • d. Hold stakeholder meetings
  • e. Prepare final BIMP report

26
NORTH CAROLINA BEACH AND INLET MANAGEMENT PLAN
  • CURRENT STATUS CONTINUED
  • 2. Established a BIMP Advisory Committee
  • 3. Established an internal technical
    advisory panel
  • 4. M N currently in data gathering

27
QUESTIONS?