PASSER II SOFTWARE - PowerPoint PPT Presentation

1 / 50
About This Presentation
Title:

PASSER II SOFTWARE

Description:

Provides easy access to PASSER II and TRANSYT 7F. Using one data input scheme ... If the lengths in the reverse direction are the same as the forward, press F9 ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 51
Provided by: tapan2
Category:

less

Transcript and Presenter's Notes

Title: PASSER II SOFTWARE


1
PASSER II SOFTWARE
2
PASSER II
  • Progression Analysis and Signal System Evaluation
    Routine
  • Traffic Signal Optimization model
  • Texas Transportation Institute (TTI)
  • Widely used model for arterial routes
  • Component program of AAP
  • Arterial Analysis Package
  • Pre-Processor

3
AAP
  • Provides easy access to PASSER II and TRANSYT 7F
  • Using one data input scheme

4
PASSER II
  • A macroscopic, deterministic optimization model
    designed to develop maximal bandwidth timing
    plans on an arterial highway
  • Objective function of maximizing bandwidth
    efficiency
  • Ensures good perceived progression timing plans

5
  • Bandwidth efficiency
  • Ratio of thru bandwidth (in both directions)
    divided by twice the cycle length

6
Inputs
  • Traffic volumes, laneage
  • Saturation flow rates
  • Minimum phase times
  • Permitted phase sequences
  • Analysis methods
  • To evaluate existing conditions
  • Enter offsets and splits
  • To optimize
  • No information is entered

7
Outputs
  • Three basic types
  • Input data report
  • Gives all input data in a structured format
  • Design recommendations
  • Including phase sequences, cycle length, offsets
    and splits
  • measures of effectiveness (MOE) values for
  • Bandwidth efficiency
  • Bandwidth attainability
  • Degree of saturation
  • Delay
  • Probability of queue clearance and fuel
    consumption
  • Time Space Diagrams

8
Using AAP
4
A STREET
9
Artery Setup
10
Help Options
  • F1 for individual help options
  • F2 for extended information about the class of
    data
  • F3 for the functional key list

11
F1 Help option for Artery Stop Factor
12
F2 Help Option for Artery Setup
13
F3 Functional Key List
14
Artery Data
  • Speeds are automatically entered as the values
    input in Artery setup
  • They can be changed individually, if desired

15
  • Mode can be
  • P- pretimed control
  • F - actuated control
  • S- semi-actuated control
  • artery is assumed to be the non-actuated phase
  • I no signal control

16
Length
From adjacent upstream intersection to the
current intersection
Forward Direction, Eastbound
Second Street
B Street
First Street
Third Street
A Street
1500
1950
1425
If the lengths in the reverse direction are the
same as the forward, press F9 and the lengths
will be automatically input
17
Artery Data
  • Traffic Volume
  • Lanegae
  • Right turns are assumed to be shared
  • Only enter the number of lanes under the the
    right turns if there is an exclusive right turn
    lane
  • Peak Hour Factor
  • Saturation Flow
  • Minimum Green Times
  • Speed

18
Traffic Volumes
19
Diagram of Network
20
(No Transcript)
21
Approach Data
  • Press F9 to calculate the volume adjustments
  • Press escape to accept these values
  • Press page down key to enter info for other
    intersections

22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
Timing Plan
26
Timing Plan
OR
OR
OR
G
L
T
W
E
N
S
27
Timing Plan
OR
F
OR
R
28
LT
  • Column Subsequence
  • 1 leading lefts
  • 2 leading thrus
  • 3 forward direction leading
  • reverse lagging
  • 4 reverse direction leading, forward lagging

No. Meaning 0 phase combination not
allowed 1 phase combination allowed, no
overlap 2 phase combination allowed, with overlap
29
(No Transcript)
30
Example
31
Run Instructions
32
Run PASSER II
33
View PASSER II Output
Then select your file name
34
Output Menu
35
Best Solution
36
A Street and First Street
37
(No Transcript)
38
Artery Summary
39
(No Transcript)
40
Time Space Diagram
41
Reading PASSER II Output
2 6
4 8
2 6
1 5
3 7
4 8
42
Reading PASSER II Output
Draw the phasing diagram assuming EB as the
forward direction for 26, 16, 15, 48, 38,
37
43
Example
44
(No Transcript)
45
First Street and A street
46
A Street and B Street
47
Length
From adjacent upstream intersection to the
current intersection
Forward Direction, Eastbound
0
800
900
1320
1650
Main Street
1650
1320
900
800
A Street
D Street
C Street
B Street
E Street
If the lengths in the reverse direction are the
same as the forward, press F9 and the lengths
will be automatically input
48
Approach Data
49
Laneage
Laneage at all intersections NB and SB 1
exclusive left turn lane 1 through and right
turn lane EB and WB 1 exclusive left turn
lane 1 through lane 1 through and right
turn lane
50
Phasing
Write a Comment
User Comments (0)
About PowerShow.com