SiDUK Introductory Meeting - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

SiDUK Introductory Meeting

Description:

Philip Burrows SiD-UK Meeting, Oxford 7/09/07. SiD-UK ... Beam pulse length. MV/m. 31.5. Average accelerating gradient. Hz. 5. Repetition rate. mA. 9.0 ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 26
Provided by: PhilipB51
Category:

less

Transcript and Presenter's Notes

Title: SiDUK Introductory Meeting


1
SiD-UK Introductory Meeting
Philip Burrows John Adams Institute Oxford
University
2
Outline
  • ILC project status
  • International planning for detectors
  • UK strategy for involvement in ILC detectors
  • SiD UK

3
GDE RDR / RD Organization
FALC
ICFA
FALC Resource Board
ILCSC
GDE Directorate
GDE Executive Committee
GDE R D Board
GDE Change Control Board
GDE Design Cost Board
Global RD Program
RDR Design Matrix
RDR Management Group
4
  • ILC Global Design Phase

2005 2006 2007 2008
2009 2010
Global Design Effort
Baseline configuration
Reference Design
5
Official release of RDR, August 2007
6
ILC Reference Design
  • 11km SC linacs operating at 31.5 MV/m for 500 GeV
  • Centralized injector
  • Circular damping rings for electrons and
    positrons
  • Undulator-based positron source
  • Single IR with 14 mrad crossing angle
  • Dual tunnel configuration for safety and
    availability

Reference Design Feb 2007
Documented in Reference Design Report
7
RDR Design Parameters
8
  • ILC Global Design Phase

2005 2006 2007 2008
2009 2010
Global Design Effort
Baseline configuration
Reference Design
Engineering Design
9
EDR definition
  • Goal The primary goal of GDE activities will be
    to advance
  • the technology,
  • the design and
  • the construction plans
  • so that approval for construction can be sought
    in 2010.
  • EDR will
  • explain the capabilities of the technology at
    that time,
  • detail the design of the machine and the
    construction plans, and
  • will present an updated value estimate.

10
  • ILC Global Design Phase

2005 2006 2007 2008
2009 2010
Global Design Effort
Baseline configuration
Reference Design
Engineering Design
11
  • ILC Global Design Phase

2005 2006 2007 2008
2009 2010
Global Design Effort
LHC Physics
Baseline configuration
Reference Design
Engineering Design
12
  • ILC Global Design Phase

2005 2006 2007 2008
2009 2010
Global Design Effort
Project
LHC Physics
Baseline configuration
Reference Design
Engineering Design
ILC RD Program
Expression of Interest to Host
International Mgmt
13
Nice, but what about Orbach?
Completing the RD and engineering design,
negotiating an international structure, selecting
a site, obtaining firm financial commitments, and
building a machine could take us well into the
mid-2020s, if not later,
  • Our technically driven time-scale is
  • Construction proposal in 2010
  • Construction start in 2012
  • Construction complete in 2019

(Barry Barish)
14
Detector Concepts
15
Detector Concepts Report (DCR)
  • Editors Behnke, Damerell, Jaros, Miyamoto
  • Make the case that detectors can do the ILC
    physics
  • Show detector designs are within our reach
  • Show where we are in detector developments and
    where we are going
  • NOT a complete description of any detector
  • NOT a comparison of ILC Detector Concepts

16
Contents of DCR
  • Challenges for Detector Design and Technology
  • Detector Concepts
  • Machine Detector Interface
  • Subsystem Design and Technologies
  • Sub Detector Performance
  • Integrated Physics Performance
  • The Case for two Detectors
  • Costs
  • Options
  • http//www.linearcollider.org/cms/

17
ILC Detector Strategy
  • The interaction region (IR) should allow for two
    experiments .. the two experiments could share
    a common IR, provided that the detector
    changeover can be accomplished in approximately 1
    week. (ILCSC Parameters Group)
  • Calls for Letters of Intent expected soon
  • - to be submitted September (?) 2008
  • Two concepts expected to be selected to be
    carried forward for EDR on similar timescale as
    machine 2010
  • Research Director for physics/detectors TBA

18
Ch. 8 The case for two Detectors
  • Competing, cross checking of results, scientific
    redundancy for precision measurements. gt1
    analysis teams for 1 detector does not create the
    needed level of competition and redundancy.
  • The collider luminosity is split, but the
    scientific productivity would be significantly
    increased
  • Maximal participation of the global particle
    physics community. One detector will not satisfy
    the interest
  • Ensures the backup if one detector need
    significant down time
  • Numerous historical examples where complementary
    experiments were critical
  • a lots more reasons are listed and emphasized

19
UK Strategy (1)
  • UK has made strategic investments in detector
    RD
  • LCFI
  • CALICE-UK
  • Internationally recognised
  • Put UK in strong position
  • Need to optimise alignment with international
    situation
  • expected call from WWS for detector concept
    LoIs
  • (Autumn 2008)

20
UK Strategy (2)
  • LCUK collaboration meeting RHUL 13/4/07
  • UK should aim to take leading positions in TWO
    of the
  • current detector concepts
  • (GLD LDC agreed to merge!)
  • Contact persons Mark Thomson (GLDC)
  • Philip Burrows (SiD)
  • explore opportunities coordinate UK
    involvement
  • (UK leadership of key systems based on technical
    strengths)

21
SiD-UK organisational task force
  • Philip Burrows
  • Paul Dauncey
  • Joel Goldstein
  • Andrei Nomerotski
  • Marcel Stanitzki
  • Mike Tyndel
  • Steve Worm
  • http//hepwww.rl.ac.uk/SiD/
  • SID-UK_at_JISCMAIL.AC.UK
  • SID-UK-PHYSICS_at_JISCMAIL.AC.UK

22
Agenda
  • 13.30 P. Burrows Welcome and introduction
  • 13.45 M. Stanitzki Overview of SiD concept
  • 14.15 S. Worm, J. Goldstein VXD tracking
    system opportunities
  • 14.45 P. Dauncey Calorimetry and UK
    opportunities
  • 15.15 A. Nichols Mechanical integration
    issues
  • 15.45 Tea/coffee
  • 16.15 D. Urner Machine/detector interface
  • 16.45 A. Nomerotski, T. Lastovicka Physics
    benchmarking studies
  • 17.25 All Discussion
  • 18.00 Adjourn

23
Discussion Points
  • Status of interests/involvements
  • Additional groups areas of interest
  • (GLDC meeting Cambridge September 19th)
  • LCUK Meeting Liverpool September 25th
  • Announcement on Research Director LoI process
  • signing up for LoIs

24
IR Engineering Workshop
ILC Interaction Region Engineering Design
Workshop September 17-21, 2007Stanford Linear
Accelerator CenterMenlo Park, California
25
Next International Physics/Detector Meeting
Write a Comment
User Comments (0)
About PowerShow.com