During these last 3 days - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

During these last 3 days

Description:

because you were not sure about your previous conclusions (lost ? ... Helena Pereira (ISA-PT) Igor Rapp (U. HUELVA-SP) Jo o Bento (UTAD-PT) Juan Domingo (U.HUELVA-SP) ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 19
Provided by: Ana1306
Category:
Tags: days | during | helena | last

less

Transcript and Presenter's Notes

Title: During these last 3 days


1
During these last 3 days
  • M2 meeting FAIR5-CT97-3856
  • Évora 20-23 January 1999

2
In the beginning
  • We had lists of indicators
  • from the TA annex
  • from M1 meeting discussions
  • from some brainstorms between M1 M2
  • and individual interesting contributions
  • besides your own ideas on the subject

3
During the discussion groups
  • Re-discussed the M1 matters (WG 1, 4, 6)
  • because you werent there
  • because you were not sure about your previous
    conclusions (lost ?)
  • because it is a DIFFICULT issue
  • Selected some indicators (WG 1, 2, 3, 5)

4
What PICL level of measurement indicators ?
  • Plot
  • MAI (criteria 1, 3)
  • total standing volume (criteria 3)
  • length of rotation (criteria 4)
  • P, K contents (criteria 2, 5)
  • vermiculite content (criteria 2)
  • organic matter content (criteria 2)
  • of shrubs cover (criteria 4, 5)

5
What PICL level of measurement indicators ?
  • FMU
  • Planted area (criteria 1)
  • (Annual) Burned area (criteria 1,2)
  • of trees affected by diseases (criteria 2)
  • N. of age classes (criteria 4)
  • eucalyptus stands / management plans (criteria
    3)
  • surface with non wood use (criteria 3)

6
What PICL level of measurement indicators ?
  • National
  • VLSC (criteria 1)
  • Total volume purchased by industries (criteria 3)
  • perception of eucalyptus plantations by society
    (criteria 6)

7
An approach to the methodologies was done !
  • The PICL ? one observation
  • How to measure
  • How often (some)
  • Representativity ? how large must my sample be in
    order to be significant ? What is the minimum
    AREA that I have to consider so that the level of
    the indicator makes sense ?

FMU
8
About the interception...
Total volume purchased by industries
National indicators
Management tool indicators
So that the society can see indicators
Plot/FMU indicators
Vermiculite content
9
About the interception...
Total volume purchased by industries
National indicators
Planted area (Annual) Burned area of trees
affected by diseases N. of age classes MAI
total standing volume length of rotation P, K
contents and so on and so on.
Management tool indicators
So that the society can see indicators
Plot/FMU indicators
Vermiculite content
10
What is the FMU ?Examples ?
  • It is, still, an abstraction

Critical dimension ?
11
Outline of future work
  • M2 meeting FAIR5-CT97-3856
  • Évora 20-23 January 1999

12
You will send us your WRITTEN proposalsprobably/h
opefully a little biased after the discussion
  • CONTENTS
  • Indicators
  • Methodologies
  • Method (e.g. national inventory, sampling)
  • PICL (the level at which data is being issued)
  • Aggregation (e.g. FMU, Homogeneous Region or
    National)
  • Cost estimates (qualitative / quantitative)

13
Organizing committee TASK
  • Receive the written proposals
  • DEADLINE February, 8
  • Merge your 6 proposals
  • Send to each of the scientific/technical
    committee members for M2
  • the preliminary merged document
  • the individual manuscript contributions
  • OUR DEADLINE February, 20
  • Receive from each the REVISION
  • YOUR DEADLINE March, 20

14
M2 Scientific Technical committee
  • Carlos Arruda Pacheco (ISA-PT)
  • Helena Pereira (ISA-PT)
  • Igor Rapp (U. HUELVA-SP)
  • João Bento (UTAD-PT)
  • Juan Domingo (U.HUELVA-SP)
  • Luis Leal (MAP-PT)
  • Manuel Lopez Arias (INIA-SP)
  • Martien Hellinga (CEASA-SP)
  • Michel Kammerer (ENSAT-FR)
  • Rosa Calvo (U.SANTIAGO-SP)
  • Thierry Gauquelin (U. TOULOUSE-FR)

15
Those results
  • Will be published
  • June
  • Will also mean commitment
  • What tasks will we have to accomplish afterwards ?

16
Until M4 at Pontevedra
  • Fill the GAPS
  • experts
  • WG 2
  • WG 6
  • be more sure about what you are stating TODAY
  • electronic communication

17
M4 at Pontevedra
  • 2 days meeting in July (19-20)
  • Redundancy analysis
  • DEFINE the methodologies for the indicators
    monitoring using, as a reference, the EMEU
  • each country should, by then, have selected 2 / 3
    good case studies
  • assess COST using the EMEU as a reference

18
Although energy consuming, specially when those
DIALOGS occurred, Ive been learning a lot with
you all THANKS
Write a Comment
User Comments (0)
About PowerShow.com