Title: PRESENTATION OF DRAFT PLANS FOR RENOVATIONS TO HOLY ROSARY CHURCH
1PRESENTATION OF DRAFT PLANS FOR RENOVATIONS TO
HOLY ROSARY CHURCH
- Steps taken to develop plan
- Sketches of possible plan
- Budget costs
- Fund raising
2HOLY ROSARY PARISH UPDATE
STEPS TAKEN SO FAR
2002 Planning for the Future Our Hopes
and Dreams
3HOPES AND DREAMS 2002
- Bring the altar closer to the people
- Seek an architectural study to facilitate
structural improvements - Improve lighting / A cloak room
- A vesting room for presider in main vestibule
- Review the location of the tabernacle
- Improve interior decoration of church including
crucifix and statues - Develop a schedule for building maintenance and
improvements - Use the hall as a meeting room or for alternate
social gatherings - Renovate conference and community rooms
- Establish an endowment fund for future needs
-
4HOLY ROSARY PARISH UPDATE
STEPS TAKEN SO FAR
2002 Planning for the Future Our Hopes
and Dreams 2005 Planning for the Future
Visioning Update
5VISIONING UPDATE 2005
- Spiritual Architecture
- The group agreed that the key issue was that our
church needed to be brought more in line with
vision of Vatican II. The vision was - Office Space / Storage Space / Meeting Rooms
- Church Community Gathering Space
- Church Renovations
- Parish Hall Renovations
- Blessed Sacrament Chapel
6HOLY ROSARY PARISH UPDATE
STEPS TAKEN SO FAR
2002 Planning for the Future Our Hopes
and Dreams 2005 Planning for the Future
Visioning Update 2006 Survey of Parish 2006
Town Hall Meeting
7PARISH SURVEY 2006
Church Renovations Entrance Area Office
Facilities Meeting Rooms Storage Space Blessed
Sacrament Chapel Parish Hall Renovation
8HOLY ROSARY PARISH UPDATE
STEPS TAKEN SO FAR
November 2006 Church and office tour May 2007
Completed alteration criteria report for
architect June 2007 Selected architect
9HOLY ROSARY PARISH UPDATE
CRITERIA FOR ARCHITECT
- A need to bring the presider closer to the
assembly. - A need for larger space for gathering - be it for
before and after masses, funerals, weddings, etc. - A need for more meeting space to support
children, youth and other activities. - A need for better office space to support
pastoral and ministry needs. - A need for more storage space.
-
10HOLY ROSARY PARISH UPDATE
We Will Present A Draft Floor Plan That Meets
All The Criteria
11FIVE STEPS IN THE PROJECT
1 - Schematic Design (currently in this process)
2 - Design Development 3 - Contract Documents
Production (working drawings and
specification) 4 - Bidding 5 - Construction
Award and Construction
12 STEPS IN SCHEMATIC DESIGN1. Survey a cross
section of the parish2. Estimate if fund
raising will meet current draft design
costs3. Revise design based on survey4.
Produce a final design5. Start fund raising
13SKETCH 1Altar on North Wall, 90 Degree Turn
14Sketch 1
15PROBLEMS
- How to reduce the effect of the east / west
orientation (ie the long roof line)? - To increase seating capacity, balconies are used
- Line of sight obscured by roof support columns
16SKETCH 2 and 3Altar At Current Main
Entrance,180 Degree Turn
17Sketch 2
18Layout Like St. Joseph Church, Guelph
Sketch 3
19PROBLEM
To keep seating capacity at 600, the maximum
distance from the altar is not significantly
improved
20SKETCH 4180 Degree Turn With Side Seating
21Sketch 4
22- Half The Pews Have Low Ceiling
(Under The Overhang)?
PROBLEMS
- Half the pews have low ceiling (under the
overhang)? - Site line issues cause awkward pew
arrangement - No center aisle
23SKETCH 5Improved 90 Degree Turn
Remove Choir Balcony Remove Current Altar Steps
24Sketch 5
25PROBLEMS
- Crowded area around the altar due to existing
middle support pillars - No focus at altar area
- Looks like church turned sideways
26SKETCH 6Cruciform Design
Remove Two Centre Columns On North And South
Sides And Replace With New Roof
27Sketch 6
28PROBLEMS
- Too expensive
- Cost similar to complete demolition and
reconstruction
29SKETCH 7PREFERRED DESIGN
- Remove two columns on north wall
- Support roof with beam across two outer
columns - Build extension on north wall
307th SketchPreferred Design
31New Support Beam
Lighting Screens
North Wall Extension
Entrance Area (Narthex)?
CROSS SECTION THROUGH CENTRE
32FINAL DESIGN CONCEPT
33ESTIMATED COSTS
34 THE NEXT STEPS1. Survey a cross
section of the parish2. Estimate if fund raising
will meet current draft design costs3.
Revise design based on survey4. Produce a final
design5. Start fund raising
35FUND RAISING
Assumes 620 families out of 1,200 contribute
36CONTRIBUTIONSOVER A FIVE YEAR PERIOD