Update on Bump Bonding - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Update on Bump Bonding

Description:

Pictures from AIT. Plans for preFPIX2s. preFPIX2I: export license issue (AIT ruled out) ... using ATLAS 'moderated' p-spray wafer and SINTEF wafer (oxygenated and std) ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 8
Provided by: ppd4
Category:
Tags: bonding | bump | pictures | std | update

less

Transcript and Presenter's Notes

Title: Update on Bump Bonding


1
Update on Bump Bonding
  • Existing contract
  • AIT shipment delivered this morning
  • ( 6 FPIX0, 5FPIX1, 1 5-chip
    module)
  • 3 more MCM under contract(Late spring) a few
    FPIX1 detectors (thin wafer??)
  • MCNC 8 FPIX1 detectors, 2 5-chip module (see
    fig.) delivery expected early Spring
  • Plan for these detectors
  • Priority will be on MCM
  • New inner boards for FPIX0 (minor mods)
  • Quick check on FPIX1 detector on test board new
    PCB will be designed that can be readout by PCI
    based test-stand will be used to build new pixel
    telescope

2
Pictures from AIT
3
(No Transcript)
4
(No Transcript)
5
Plans for preFPIX2s
  • preFPIX2I
  • export license issue (AIT ruled out)
  • single chip devices so far (MCNC ruled out)
    negotiation with CERN to have 1-2 complete wafer
    received dummy wafer (see fig) will establish
    contract as proof of principle to CERN (8 wafer,
    fine pitch, yield etc)
  • UCD (see paper copy) SINTEF wafer
  • preFPIX2Tb
  • New contract with AIT
  • 8 detectors using ATLAS moderated p-spray wafer
    and SINTEF wafer (oxygenated and std)
  • Irradiation studies using these detectors

6
Alice1LHCb
Fermilab
Transistor testchip
7
Real pixel vs dummy(pixel)
Write a Comment
User Comments (0)
About PowerShow.com