About This Presentation
Title:

WRIA 7 Inland Geographic Response Plan GRP for Oil Spill Response

Description:

Incident Command System (ICS) Priorities and where Geographic Response Plans (GRPs) fit ... Private dirt boat ramp available at priate residentce. ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 34
Provided by: boba57
Category:

less

Transcript and Presenter's Notes

Title: WRIA 7 Inland Geographic Response Plan GRP for Oil Spill Response


1
WRIA 7 Inland Geographic Response Plan (GRP)
for Oil Spill Response
First Workshop August 18, 2006
2
  • Oil Spill Planning in Washington
  • Incident Command System (ICS) Priorities and
    where Geographic Response Plans (GRPs) fit
  • Examples of Response Strategies

3
Planning Components Under the NRS
Level
Plans
Managing Organization
LEPCs
Local
Local Plans
State Plans
SERCs
State
ACPs
Area
Area Committees
GRPs
RCPs
RRTs
Regional
NCP
NRT
National
4
http//www.rrt10nwac.com/
5
Initial ICS Objectives
  • Ensure the safety of citizens and response
    personnel
  • Control the source of the spill
  • Manage a coordinated response effort
  • Maximize protection of environmentally sensitive
    areas
  • Contain and recover spilled material

6
Safety is always 1
  • Major function of local first responders Fire
    and Law Enforcement
  • Dont make a bad situation worse by getting
    someone injured

7
Source Control Initial Containment
  • Essential first step in controlling an oil spill

8
Coordinated Response
  • Use the Incident Command System (ICS)

9
Reduce Impacts to Environmentally Sensitive Areas
  • What resources are at risk?
  • Where are they located?
  • Is it possible to install a response strategy
    that may reduce the impacts of the oil?
  • Can any of this be planned for ahead of an oil
    spill?
  • Taa daa.GRP

10
Event Happens
11
Sand bag dams on outfalls, culverts small
streams
12
Latah Creek
13
Sumas River
14
Friday Creek
15
Crab Creek
16
Spokane River
17
Snake River
18
Take advantage of existing structures
19
We want to avoid this
20
Minimize Impacts to This
21
GRP Technical Work Plan
22
GRP Technical Work Plan
  • Develop technical tool using GIS for inland
    spill response with
  • Updating capacity
  • Focus on spill response
  • Compatibility among state and local planning
    efforts
  • Develop site response strategies based on
  • Strategy site field reconnaissance
  • Hydrology/hydraulics analysis
  • Oil Spill Response methods

23
GRP Technical Work Plan
We Are Here
  • TASK
  • GIS Data Development
  • Strategy Development
  • GIS Automation
  • GRP Reporting
  • Stakeholder/Outreach
  • Phase 1
  • x
  • x

Phase 2 x x x x x
24
Schedule
  • Assemble data, work groups
  • Initial Strategy Site Selection
  • Field work
  • Programming/Reporting
  • Draft GRP Public Review
  • Final GRP
  • August
  • September 15
  • October 1
  • November-December
  • January, 2007
  • Spring 2007

25
Automated Map Sheets
Automated Spill Report
ARC GIS (SDE)
SQL Database
Strategy Site Issues Site Conditions Strategy
Selection Stream Conditions
River Spill Travel Time Calculations
Real-time River Conditions
Spill Location, Size and Type
Dynamic Real Time Information
Static Site Information
26
Automated Map Sheets
Automated Spill Report
ARC GIS (SDE)
SQL Database
Strategy Site Issues Site Conditions Strategy
Selection Stream Conditions
River Spill Travel Time Calculations
Real-time River Conditions
Spill Location, Size and Type
Dynamic Real Time Information
Static Site Information
27
Sky-16.49 275th Ave SE
Snohomish Geographic Response Plan Preliminary
Mock-up
Driving Directions1. From US-2/STEVENS PASS HWY
take the FERN BLUFF RD. exit2. Turn RIGHT onto
FERN BLUFF RD. (0.04 miles)3. Turn RIGHT onto
162ND ST SE/ANNE MANN RD. (0.13 miles)4. Turn
SLIGHT LEFT onto 275TH AVE SE. (0.11 miles)5.
End at 275th Ave Se Monroe, WA 98272 USTotal
Estimated Time 1 minuteTotal Distance 0.58
miles
Date Strategy Updated 6/20/2006 Date Strategy
Site Visited 6/19/2006
28
Sky-16.49 275th Ave SE
Snohomish Geographic Response Plan
Immediate Notifications For Hazardous Substance
Or Oil Spills Required By Law National Response
Center (800) 424-8802 Washington State Dept. of
Emergency Management (800) 258-5990 Other
Contacts here
29
Automated Map Sheets
Automated Spill Report
ARC GIS (SDE)
SQL Database
Strategy Site Spill Type Issues Site
Conditions Strategy Selection Stream Conditions
River Spill Travel Time Calculations
Real-time River Conditions
Spill Location, Size and Type
Dynamic Real Time Information
Static Site Information
30
Automated Map Sheets
Automated Spill Report
ARC GIS (SDE)
SQL Database
Strategy Site Issues Site Conditions Strategy
Selection Stream Conditions
River Spill Travel Time Calculations
Real-time River Conditions
Spill Location, Size and Type
Dynamic Real Time Information
Static Site Information
31
Strategy Sites
  • Identify and select WRIA 7 strategy sites for GRP
    characterization using one of more of the
    following..
  • GIS data - Resources At Risk (RAR)
  • Criteria and classification
  • Ranking
  • Common sense what works
  • Stakeholder knowledge
  • Ecology/technical team knowledge

32
Todays Objectives
  • Tour of watershed using GIS database
  • Do we have sufficient GIS information?
  • Are there specific concerns or other input?
  • Discuss strategy site selection criteria
    considerations

33
Questions/Discussion
  • Ecology Contact Info
  • PO Box 47600
  • 300 Desmond Dr.
  • Olympia, WA 98504
  • Rebecca Post REPO461_at_ECY.WA.GOV
  • 360-407-7114 (T)
  • Golder Contact Info
  • 18300 Union Hill Rd, Suite 200
  • Redmond, WA 98052
  • Bob Anderson Banderson_at_golder.com
  • Kevin DeRouen Kderouen_at_golder.com
  • 425-883-0777 (T)
  • 425-882-5498 (F)
Write a Comment
User Comments (0)
About PowerShow.com