City of Port Angeles, Washington Ediz Hook Boat Launch Facility (07-1376-D) - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

City of Port Angeles, Washington Ediz Hook Boat Launch Facility (07-1376-D)

Description:

City of Port Angeles, Washington Ediz Hook Boat Launch Facility 071376D – PowerPoint PPT presentation

Number of Views:210
Avg rating:3.0/5.0
Slides: 25
Provided by: Mbil1
Category:

less

Transcript and Presenter's Notes

Title: City of Port Angeles, Washington Ediz Hook Boat Launch Facility (07-1376-D)


1
City of Port Angeles, WashingtonEdiz Hook Boat
Launch Facility(07-1376-D)
  • Boating Facilities Program
  • Advisory Committee
  • Presentation

Thursday, September 27, 2007 _at_ 130 pm Presenter
William A. Sterling, P.E. Deputy Director for
Recreation
2
VICINITYMAP
  • Port Angeles /Ediz Hook Boat Launch

3
Service Area Map
  • Showing Launching Facilities _at_
  • John Wayne Marina
  • Sequim Bay State Park
  • Boat Haven (2 ramps)
  • Ediz Hook
  • Port Angeles /Ediz Hook Boat Launch

4
Restroom Facilities
Parking Area
U.S. Coast Guard Station
Commercial
Boat Ramp
Pilot Boats
With two docks in operation
Port Angeles/Ediz Hook Boat Launch
5
Shown with 2 Docks in Operation East Dock (left)
not in Operation
Port Angeles/Ediz Hook Boat Launch
6
Low Tide
High Tide
7
7/12/07 _at_ 801 am -2.7
Existing Concrete Ramp
Port Angeles/Ediz Hook Boat Launch
8
1. Need
  • Estimated 4,000 launches/year
  • City population 19,000
  • Immediate County population 35,000
  • Only 4 public boat launches in immediate area
  • Ediz Hook
  • Boat Haven
  • John Wayne Marina (20 miles)
  • Sequim Bay State Park (25 miles)
  • Present facility now reduced to one dock (limited
    access)

Port Angeles/Ediz Hook Boat Launch
9
Low Tide
High Tide
Port Angeles/Ediz Hook Boat Launch
10
(No Transcript)
11
Port Angeles/Ediz Hook Boat Launch
Project Map
12
2. Site Suitability
  • Located on inner harbor site
  • Existing facility on site already
  • Access to Strait of Juan de Fuca
  • City owns existing facility
  • Greatly benefits smaller boats on trailers
  • Higher hazard if facility is not useable (deeper
    water)

Port Angeles/Ediz Hook Boat Launch
13
3b. Project Design
  • Remove remaining 7 failing piles
  • Install 8 new 10 galvanized piles
  • Ramps/Floats not a part of this request

Port Angeles/Ediz Hook Boat Launch
14
Missing Floats - Pile
15
Development Cost Estimate Summary
Demolition (pile removal) 7 each 5,750.00
Mobilization (will review options of combining efforts with Boat Haven to reduce costs) 31,073.00
Pile Driving (8 each) 46,000.00
Galvanized Piling (8 each) 26,680.00
Pile Caps (8 each) 2,300.00
Tax _at_ 8.4 9,391.00
A E Cost 24,238.00
Total Estimated Project Cost 145,432.00
Port Angeles/Ediz Hook Boat Launch
16
4. Cost - Benefit
  • Costs of Non-Replacement
  • Reduced Public Access to Water
  • Less Recreation Time on Water
  • Congestion at Boat Haven Facility/Ediz Hook
    Facility
  • Safety concerns at Existing Facility
  • Benefits of Replacement
  • Increased Capacity
  • More Recreation Time on Water
  • Dispersed Traffic/Less Congestion
  • Increased Safety for Launching
  • Provides options for boaters
  • Partnership with State and City
  • Decrease in annual maintenance

Port Angeles/Ediz Hook Boat Launch
17
5. Boating Experience
  • Inner harbor (3.8 sq. miles)
  • Trailer sized boats (power and sail)
  • City owned since 1990
  • Double capacity if piles replaced
  • Quicker access/easier launching (solo)
  • Year-round access

18
6. Boats on Trailers
Trailer Parking Area
Port Angeles/Ediz Hook Boat Launch
19
7. Project Readiness
  • Design completed
  • Permits issued
  • City share of funding is in place
  • Early spring 2008 project

Port Angeles/Ediz Hook Boat Launch
20
Port Angeles/Ediz Hook Boat Launch
21
Status of Permits
Aquatic Land Use Authorization Approved
Dredge/Fill Permit Nationwide permit 3 Issued
Hydraulics Project Approval Issued
SEPA DNS Final
Shoreline Permit Exempt
Port Angeles/Ediz Hook Boat Launch
22
Summary
  • Replace remaining 7 Failing Pilings with 8 new
    galvanized piles
  • Estimated Project Cost 145,432
  • Grant Request 108,682
  • City Match _at_ 25.3 36,750
  • Estimated Launches/Year 4,000
  • Permits issued/design completed
  • Restores capacity (2 docks)
  • Project ready to go

Port Angeles/Ediz Hook Boat Launch
23
Chinook Salmon Caught off Ediz Hook
24
THANK YOU!!! ANY QUESTIONS?
Port Angeles/Ediz Hook Boat Launch
Write a Comment
User Comments (0)
About PowerShow.com