MINERvA Module Assembly Prototyping Plan - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

MINERvA Module Assembly Prototyping Plan

Description:

Hardwood dowel-rod. Would simplify an endcap as rectangle. Might need an additional supporting block to attach dowel. Timeline. May 9 - May 20 (2 weeks) ... – PowerPoint PPT presentation

Number of Views:9
Avg rating:3.0/5.0
Slides: 11
Provided by: publ156
Category:

less

Transcript and Presenter's Notes

Title: MINERvA Module Assembly Prototyping Plan


1
MINERvA Module Assembly Prototyping Plan
  • Jaewon Park
  • University of Rochester

MINERvA Collaboration Meeting, May 13-14, 2005
2
Detector Overview
Module Assembly Unit
1 Module
OD
x
u
OD
x
v
3
Mocking-up What for?
  • Develop assembly procedure, manipulation
  • Possibly provides some ideas about design issues
  • Spacer between OD planes
  • H-clip (jointing ID and OD)
  • PMT Box support
  • Also, Fiber routing scheme
  • fibers being bended
  • grouping to connector
  • Determines fiber lengths
  • Model with light material (plywood)
  • Cant consider mechanical rigidity, weight

4
Things to build
  • Active-target module
  • 1/3 full scale
  • 1/2 scale
  • ¼ scale
  • PMT box and support
  • 1 aluminum rack for PMT boxes
  • Many PMT boxes

5
Model Materials, Sizes
  • Model most parts with plywood or plexiglas and
    glue with liquid nails
  • Model fibers with fishing line

176 in.
Crane in machine shop
door
100 in.
  • ¼ scale (40 in. wide)
  • ½ scale ( 80 in. wide)
  • 1/3, full scale (132 in. wide)

6
Module Types
make this module
US-HCAL
US-ECAL
Active-target (Narrow)
Active-target (Wide)
DS-ECAL
DS-HCAL
OD
Scint.
Fe
Pb
7
Fiber routing and bending
Total 256 fibers for 1/3 module
OD
OD
192 fibers
u
x
u
64 fibers
x
u
8
PMT Box and Support
  • Model full size module for PMT box and support
  • Support - aluminum bar with bolt jointing
  • Fake PMT boxes PVC pipe, hardboard, liquid nails

9
PMT Box Model
Hardwood dowel-rod
12x 4dia. PVC Pipe
Would simplify an endcap as rectangle
Might need an additional supporting block to
attach dowel
10
Timeline
  • May 9 - May 20 (2 weeks)
  • Machine Shop closed due to Machine Shop moving
  • May 12
  • Some major materials (Plywood, etc) will be
    ordered
  • May 19
  • 4 hr. Safety course with dept. machinist (Dept.
    requirement)
  • May 23
  • Begin actual work
  • 2 persons rule in machine shop
  • Work mostly daytime
Write a Comment
User Comments (0)