Sound Water System Planning for the Growing City of Bend, Oregon - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

Sound Water System Planning for the Growing City of Bend, Oregon

Description:

Sound Water System Planning for the Growing City of Bend, Oregon – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 33
Provided by: Bet77
Category:

less

Transcript and Presenter's Notes

Title: Sound Water System Planning for the Growing City of Bend, Oregon


1
Sound Water System Planning for the Growing City
of Bend, Oregon
Presented by Kyle McTeague, P.E. Murray, Smith
Associates, Inc.
2
Where is Bend?
base map provided by Pittmon Maps
3
Basic Statistics
  • 2005 Total City Population 70,000
  • 2005 Water Service Area Population 53,000
  • Planning Period Year 2030
  • 2030 Water Service Area Population 103,000

4
Growth History
5
(No Transcript)
6
Planning for Growth
  • Maximum Day Demand per Capita 590 gpcd
  • Current Maximum Day Demand 27 mgd
  • 2030 Maximum Day Demand 72 mgd
  • 266 Increase
  • URAs/UGB Expansions

7
Typical Water System Interests/Concerns
  • Provide Guidance for the Sound Stewardship of
    the Water System
  • Plan for Growth
  • Update System Development Charges and Rates
  • Provide Adequate Fire Flows Throughout System

8
Key City of Bend Water System Interests/Concerns
  • Expand Supply in an Efficient Manner
  • Provide Better Balance to the Water System
  • Provide a High Value Capital Improvements
    Program
  • Minimize Disruption to City Center
  • Provide Flexibility in Improvement Program

9
Primary System Elements
  • Supply Surface Water and 23 Wells
  • Storage 14 Reservoirs
  • Distribution 300/- Miles of Pipeline
  • Pumping/Transmission

10
Key City of Bend Supply Related
Interests/Concerns
  • Provide Better Balance to the Water System
  • Provide a High Value Capital Improvements
    Program
  • Minimize Disruption to City Center
  • Provide Flexibility in Improvement Program

11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
Key City of Bend Supply Related Solutions
  • Provides Better balance to the Water System
  • Provides a High Value Capital Improvements
    Program
  • Minimizes Disruption to City Center
  • Flexibility in Improvement Program

16
Key City of Bend Storage Related
Interests/Concerns
  • Provide Better Balance to the Water System
  • Provide a High Value Capital Improvements
    Program
  • Minimize disruption to City Center
  • Provide Flexibility in Improvement Program

17
(No Transcript)
18
(No Transcript)
19
Key City of Bend Storage Related Solutions
  • Provides Better Balance to the Water System
  • Provides a High Value Capital Improvements
    Program
  • Minimizes Disruption to City Center
  • Allows Flexibility in Improvement Program

20
Hydraulic Profile System Balance
21
Storage Capacity Analysis
  • Operational
  • Fire Suppression
  • Emergency

22
Typical Ground Water Supply Storage
23
Alternate Aquifer/Tank Storage
24
Resultant Reduced Tank Storage
25
Tank/Aquifer Storage Ratios
26
Key City of Bend Distribution Related
Interests/Concerns
  • Provide Better Balance to the Water System
  • Provide a High Value Capital Improvements
    Program
  • Minimize Disruption to City Center
  • Improve Fire Flow Capacities Where Needed

27
(No Transcript)
28
(No Transcript)
29
Key City of Bend Distribution Related Solutions
  • Provides Better Balance to the Water System
  • Provides a High Value Capital Improvements
    Program
  • Minimizes Disruption to City Center
  • Improves Fire Flow Capacities Where Needed

30
Distribution System Hydraulic Computer Analysis
  • Verification Match Existing System
  • Calibration Output Match Actual Conditions
  • Operational Review Confirm Settings Parameters
  • Fire Flow Requirements Confirmed
  • System Deficiencies Identified

31
Distribution System Engineer Water System
Analysis
  • Improvements Established Based On
  • Sound Engineering Judgment
  • Thorough Understanding of Water System
  • Consideration for Specific City Interests
  • Cost Considerations
  • Corridors/Property/Other Utilities
  • Optimized Balance of All Interests

32
Summary
  • City of Bend Water Master Plan Update
  • Helps Guide the City to 2030
  • Allows for Flexibility in Growth Rate and
    Locations
  • Minimizes Disruption to City Center
  • Maps Out a Well Balanced and High Value CIP
  • Questions?