LaDon Swann MississippiAlabama Sea Grant Consortium Auburn University - PowerPoint PPT Presentation

1 / 48
About This Presentation
Title:

LaDon Swann MississippiAlabama Sea Grant Consortium Auburn University

Description:

Many problems associated with levee ponds can be traced back to ... Bicarbonate Drip. Rational. CO2 from respiration. nitrification is an acidifying process ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 49
Provided by: lad90
Category:

less

Transcript and Presenter's Notes

Title: LaDon Swann MississippiAlabama Sea Grant Consortium Auburn University


1
Production Methods
  • LaDon SwannMississippi-Alabama Sea Grant
    ConsortiumAuburn University

2
Production Methods
  • Cages and Pens
  • Recirculating systems
  • Ponds
  • Raceways

3
Levee Ponds
  • Levee ponds are the most common fish production
    method
  • Common food species
  • red drum
  • catfish
  • trout and salmon
  • hybrid striped bass
  • tilapia
  • cobia

4
Levee Ponds
  • Site selection
  • topography
  • pesticides
  • utilities
  • drainage
  • wetlands
  • clay content
  • Types
  • Construction
  • levee
  • depth
  • slope
  • water
  • drains
  • Production rates

5
Site Selection
  • Time spent analyzing a site is time well spent.
  • Many problems associated with levee ponds can be
    traced back to poor site selection.

6
Site Selection
  • Criteria
  • topography
  • gentle slope
  • pesticide residuals
  • test
  • utilities
  • essential

7
Site Selection
  • Criteria
  • drainage
  • locate for gravity drainage
  • wetlands
  • regulatory difficulties
  • clay
  • 10-20 is idea, but good ponds can be constructed
    with less or more.
  • depends soil composition

8
Types
  • Spawning
  • less than 1 acre
  • easy to drain/fill
  • Fingerling
  • 1-5 acres
  • easy to drain/refill
  • Finishing
  • 5 acres or larger
  • draining
  • continual -- no
  • batch -- yes

9
Spawning
10
Fingerling
11
Finishing
12
Construction
  • Ponds last decades when properly constructed.
  • 3-5 K per acre
  • Components
  • levee
  • depth
  • slope
  • water supply
  • drains

13
Levee
  • Core trench
  • dug to anchor levee to existing topography
  • core depth equal depth of pond
  • filled with high clay content soil
  • compacted

14
Levee
  • Remove soil from central part of pond to
    construct levees
  • Add 8-10 layers
  • Compact

15
Levee
  • 20 ft wide main
  • harvesting equipment
  • 16 ft wide side
  • feed trucks

16
Slope
  • Horizontal distance in feet for each foot of
    height or a2 b2 c2 or s Rise/Run
  • 31 minimum inside

17
Depth
  • Shallow end
  • 2.5-3.5 ft
  • prevents rooted plant growth
  • Deep end
  • 6-7 ft (drain)
  • prevents unnecessary draining to harvest

18
Freeboard
  • Freeboard
  • height of the levee from the water surface to the
    top of the levee
  • 2 ft recommended
  • prevents overflow
  • erosion control

19
Water Supply
  • Ponds should be able to fill in 7 days or less
  • Use gate or alfalfa valves to control flow

20
Drain
  • Ponds should able to completely drain in 2 days
    or less.
  • PVC pr galvanized
  • Anti-seep collar
  • prevents seepage around drain pipe
  • collar should be 3 times the diameter of the pipe

21
Drain
  • Swivel drain
  • Vertical standpipe

22
Production Rates
  • Variables
  • feed
  • aeration
  • harvest method
  • continual
  • batch
  • 1,000 to 10,000 lbs./acre

23
Raceways
  • Site selection
  • water supply
  • location
  • topography
  • Types
  • series
  • parallel
  • Construction
  • material
  • dimensions
  • earthen construction
  • concrete construction
  • Production rates

24
Site Selection
  • Water supply
  • use large quantities of water
  • gravity springs are most economical
  • Location
  • near water supply
  • Topography
  • 8-10 percent slope
  • 18-24 inch water drop

25
Types
  • Series
  • flow through multiple races
  • Parallel
  • flow through one race

26
Construction
  • Materials
  • any non-toxic material
  • must hold water

Concrete
Earthen
27
Dimensions
  • Ratio of 3031
  • aids in water flow
  • self-cleaning
  • easier harvest

For Example 120 ft x 12 ft x 4 ft
12 ft
120 ft
4 ft
28
Production Rates
  • Variables
  • feed
  • aeration
  • harvest method
  • continual
  • batch
  • 20,000 to 45,000 lbs./ft3/sec.
  • (449 gals/min)

29
Cages
  • Site selection
  • water sources
  • water quality
  • Types
  • round
  • rectangular
  • Construction
  • bag
  • frame
  • feeding ring
  • lid
  • floatation
  • Placement
  • Production rates

30
Site Selection
  • Types
  • Farm Ponds
  • Bays and Fiords
  • Open Ocean
  • Specifications
  • Freshwater
  • 1 acre minimum
  • 4-5 ft. average depth
  • Saltwater
  • 70-100 ft

31
Types
  • Types
  • Small cages
  • Large net pens
  • Size
  • is based on economics and management

32
Construction
  • Sizes
  • small cages less than 200 ft3.
  • large net pens for near and offshore production
  • Materials
  • non-toxic
  • durable
  • retains fish
  • allow floatation

33
(No Transcript)
34
Cage Placement
  • Specifications
  • open areas of water to allow good circulation
  • provide space between cages
  • number depends on size of pond (carrying capacity)

35
Production Rates
  • Variables
  • feed
  • aeration
  • harvest method
  • continual
  • batch
  • Carrying capacity
  • 10-20 lbs. per ft3
  • no more than 1,500-2,000 lbs./acre

36
Recirculating Systems
  • Site components
  • pump house
  • emergency generator
  • 3 phase electricity
  • bulk feed storage
  • oxygen supply
  • building
  • System components
  • oxygen
  • biological filter
  • buffering system
  • heaters/chillers
  • solids filter
  • lighting
  • tanks
  • Production rates

37
Site Components
  • Building
  • Water
  • Electricity
  • 3 phase
  • Other
  • bulk feed
  • oxygen tanks
  • emergency generator

38
Building
  • Pole barn
  • enclosed or semi-enclosed
  • access
  • foam insulation
  • moisture proof
  • floor drains

39
Electricity
  • 3 phase electricity
  • electricity is a major cost and 3 phase will
    reduce the expense
  • Emergency generator
  • in event of power outage there is a 30 minute
    window to restore power to system.

40
System Components
  • Primary
  • biofilter
  • solids filter
  • tanks
  • pump
  • buffering system
  • Secondary
  • oxygen
  • pumps
  • heaters/chillers
  • lighting

41
Biological Filter
  • Function
  • nitrification
  • oxidizes ammonia and nitrite to nitrate

42
Solids Filter
  • Types
  • sand filter
  • settling chambers
  • inclined tubes
  • screen filters
  • Function
  • settleable (feces and food)
  • also some suspended

43
Tanks
  • Criteria
  • non-toxic
  • durable
  • corrosion resistant
  • Materials
  • fiberglass
  • concrete
  • plastic
  • glass
  • others with liners

44
Pump
  • Types
  • impeller driven
  • airlift
  • Purpose
  • to return water through system
  • usually placed after biofilter

45
Oxygen
  • Sources
  • aerators
  • agitators
  • blowers
  • ventura pumps
  • oxygenation
  • packed towers
  • U-tubes
  • cones

Packed tower
46
Bicarbonate Drip
  • Rational
  • CO2 from respiration
  • nitrification is an acidifying process
  • Purpose
  • add alkalinity to water

47
Other Components
  • Lighting
  • low light levels reduce stress to fish
  • Heaters/chillers
  • depending on species

48
Production Rates
  • Variables
  • feed
  • aeration
  • harvest method
  • continual
  • batch
  • ¼ to 1 lb./gallon

FeedAerationContinual Harvesting
Write a Comment
User Comments (0)
About PowerShow.com