201 MHz NC RF Cavity R - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

201 MHz NC RF Cavity R

Description:

NCRF R&D of 201 MHz Cavity (D. Li, NuFact-2005, Frascati, Italy) ... We have successfully developed extruding. technique for port pulling over e-beam joints ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 18
Provided by: PCU165
Category:
Tags: cavity | extruding | mhz

less

Transcript and Presenter's Notes

Title: 201 MHz NC RF Cavity R


1
201 MHz NC RF Cavity RD for Muon Cooling
Channels
  • Derun Li
  • Center for Beam Physics
  • International Neutrino Factory Workshop
  • WG-3, Frascati, Italy
  • June 21-26, 2005

2
Outline
  • Introduction
  • Ionization cooling
  • Requirements of RF cavities for muon cooling
  • RF cavity RD activities
  • 805 MHz cavity
  • 201 MHz cavity
  • Status of the prototype cavity
  • Be window RD
  • RF Couplers
  • Summary

3
Introduction
  • Ionization cooling principle

LH Absorbers
RF Cavities
  • Strong magnetic field to confine muon beams
  • Lose energy in LH absorbers
  • High gradient RF cavities to compensate for
    lost longitudinal energy

4
RF Cavity for Muon Cooling
  • Requirements
  • Intense muon beams
  • Have short lifetime and large phase space
  • Interact weakly with matter
  • Confined in focusing channels
  • High gradients
  • 17 MV/m at 201 MHz and 34 MV/m at 805 MHz
  • Normal conducting
  • Rounded closed pillbox cavity
  • Large and thin Be foils (low-Z) to terminate RF
    fields
  • High cavity shunt impedance
  • Low peak surface field
  • High accelerating efficiency with independent
    phase control
  • Less RF power

5
NCRF Cavity RD Activities
  • Experimental studies using an 805 MHz pillbox
    cavity with demountable windows at MTA (Lab G),
    FNAL
  • Achievable accelerating gradient is a function
    of external B
  • Be windows withstand high field without surface
    damage
  • How to interpolate the results to 201 MHz
    cavities?
  • Does this apply to 201 MHz cavities?

6
201 MHz Prototype Cavity
  • Goal Design, build a 201-MHz cavity with large
    Be windows, and condition and operate it at 16
    MV/m in a few Tesla magnetic field
  • Cavity and its sub-components
  • Cavity body water cooling
  • lines
  • Four ports and flanges
  • RF loop couplers
  • Cavity support structure
  • Cavity tuners
  • Ceramic RF windows ( 4)
  • Curved Be windows
  • Possible LN temperature
  • operation

Cavity design concept
Layout of water cooling lines on cavity
7
The 201 MHz Cavity Parameters
  • The cavity design parameters
  • Frequency 201.25 MHz
  • ß 0.87
  • Shunt impedance (VT2/P) 22 M?/m
  • Quality factor (Q0) 53,000
  • Curved Be window with radius and thickness 21-cm
    and 0.38-mm
  • Nominal parameters for cooling channels in a
    neutrino factory
  • For up to 16 MV/m peak accelerating gradient
  • Peak input RF power 4.6 MW per cavity (assuming
    85 of Q0 and 3 times filling time)
  • Average power dissipation per cavity 8.4 kW
  • Average power dissipation per Be window 100
    watts

8
The Cavity Fabrication
Finished equator welding
E-Beam Welding of Stiffener Ring at J-Lab
9
The Cavity Sub-components
Loop coupler
Ceramic RF window
Finished cavity port
10
EP at J-Lab
After 1st EP run last week (June 2005)
U-Shape Electrode
11
Current Status Near Term Plans
  • Continue EP at J-Lab
  • High pressure water rinsing
  • Vacuum Assembly and base pressure measurement
  • Packing and Shipping
  • Couplers, RF probes, gauges and vacuum pump
    assembly at the MTA, FNAL
  • Baking at the MTA, FNAL
  • RF conditioning (Ti-N coated copper windows to
    start with) without magnetic field

12
Curved Be Windows for 201 MHz Cavity
  • Succeeded in two curved Be windows for the
    805-MHz cavity
  • Placed purchase order of three Be windows for
    201-MHz cavity
  • 0.38 mm thick, 420 mm diameter
  • at Brush-Wellman (100 watts per window with
    ?T 55 degrees at nominal Study-II parameters)
  • Window is formed by applying a die at elevated
    temperature
  • Copper frame is brazed to Be window
  • Be windows will be Ti-N coated
  • Present a perfect conducting BC for RF.
  • Min. scattering and mechanically strong


420 mm
420 mm diameter curved Be window for the 201 MHz
cavity formed at Brush-Wellman. The formed Be
foil is sandwiched (brazed) in two annular Cu
frames
  • The curved Be window status
  • warping (1st one)
  • cracking (2nd) on edge, but usable
  • Two good windows already
  • To be Ti-N coated

13
RF Coupler Design and Status
  • Loop couplers at critical coupling
  • Prototype coupling loop design uses standard
    off-the-shelf copper co-axial components
  • Coupling loop has integrated cooling lines
  • Two SNS style RF windows mfg. by Toshiba
  • received (no cost to us !)
  • Two couplers with RF windows are complete
  • High power tested up to 600 kW in TW mode and
    2.4 MW (peak) in SW mode
  • Ready to ship to MTA, FNAL
  • Bellows connection required on MICE cooling
    channel (Study-II) for thermal and dimensional
    reasons

Ceramic RF window

Loop coupler
14
Coupler Conditioning
  • The two Couplers
  • Conditioning started in the week of May 16, 2005
    at SNS
  • Good vacuum low 10-8 T
  • Achieved 600 kW in TW mode (matched load)
  • Achieved 10 kW average power ( 9 kW average for
    nominal NF parameters)
  • Achieved 2.4 MW peak power in SW mode (at
    variable short positions)
  • Ceramic windows work fine in nearly two weeks of
    the RF conditioning

15
Mucool Test Area (MTA)
805-MHz
201-MHz
Facility to test all components of cooling
channel, not ionization cooling
  • At high beam power
  • Designed to accommodate full Linac Beam
  • 1.6 X 1013 p/pulse _at_15 Hz
  • 2.4 X 1014 p/s
  • RF power from Linac 201 and 805 MHz test stands
  • Waveguides pipe power to MTA
  • Clean room ordered
  • On site assembly of windows
  • Currently plan to operate either RF or LH2/H2
    tests, but not both simultaneously.
  • 805 MHz experimental study
  • will resume soon
  • 201 MHz cavity expect to
  • arrive next month

16
Eight 201 MHz Cavities for MICE
Two SC coupling Coils
Power couplers
Eight 201 MHz cavities
The 201 MHz prototype cavity is the baseline
design for MICE
17
Summary
  • MTA is ready to accept high power RF test
    programs
  • 805 MHz experimental programs will resume soon at
    MTA, FNAL
  • 201 MHz prototype cavity progress well and expect
    to be shipped to MTA, FNAL for high power tests
    next month (July 2005)
  • Significant progress on fabrication of curved Be
    windows
  • RF couplers have been high power tested and ready
    for assembly at the MTA, FNAL
  • MUCOOL 201 MHz cavity is the baseline design for
    MICE
Write a Comment
User Comments (0)
About PowerShow.com