International Design Study of the Neutrino Factory - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

International Design Study of the Neutrino Factory

Description:

Built on previous work: Super beam: CERN MW w/s, studies in US and Japan. Beta beam: ... See M.Lindroos, WG3, Tuesday, 15:00. IDS initiative now drawing to an end ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 18
Provided by: Long45
Category:

less

Transcript and Presenter's Notes

Title: International Design Study of the Neutrino Factory


1
International Design Studyof the Neutrino Factory
2
The International Scoping Study
a step on the way!
  • One-year study NuFact05 NuFact06
  • Built on previous work
  • Super beam
  • CERN MW w/s, studies in US and Japan
  • Beta beam
  • EU Study supported by EU under FP6
  • Neutrino Factory
  • US Studies I, II, IIa
  • ECFA/CERN Study
  • NuFact-J Study
  • Emphasis
  • Incorporate progress made since previous studies
  • e.g. MERIT, MICE, MuCOOL, NSFFAG,
  • Recognition of importance of holistic
    consideration of source and detector
  • Recognition of importance of an international
    approach

3
ISS organisation
  • Parallel study of
  • Physics performance
  • Accelerator facility
  • Neutrino Detectors
  • International participation
  • Programme committee and working groups

4
ISS outcomes
  • Principal outcomes
  • Defined baselines for Neutrino Factory
    accelerator and detector systems
  • Established importance of
  • Low muon-detection threshold for ?e ? ??
    (golden) channel
  • New analysis of magnetised-iron calorimeter gives
    good performance
  • ?e ? ?? (silver) and ?? ? ?e (platinum)
    channels essential to search for non-S?M
    processes
  • e.g. non-unitarity of MNS matrix
  • Comparison of sensitivity of various options
  • Report in preparation

5
Comparison ?13
SPL Systematics 2 5
T2HK Systematics 2 5
WBB Systematics from proposal
Beta beam ? 100 500 kT H2O Ç (130 km) ?
350 500 kT H2O Ç (730 km)
Neutrino Factory Golden, 4000, Eµ 50
GeV Golden (4000 km), Golden (7500 km) Eµ 20
GeV
6
Comparison mass hierarchy
SPL Systematics 2 5
T2HK Systematics 2 5
WBB Systematics from proposal
Beta beam ? 100 500 kT H2O Ç (130 km) ?
350 500 kT H2O Ç (730 km)
Neutrino Factory Golden, 4000, Eµ 50
GeV Golden (4000 km), Golden (7500 km) Eµ 20
GeV
7
Comparison CP violation
SPL Systematics 2 5
T2HK Systematics 2 5
WBB Systematics from proposal
Beta beam ? 100 500 kT H2O Ç (130 km) ?
350 500 kT H2O Ç (730 km)
Neutrino Factory Golden, 4000, Eµ 50
GeV Golden (4000 km), Golden (7500 km) Eµ 20
GeV
8
The ISS baseline
  • 100 (50) kT magnetised iron detector
  • Two baselines
  • 3000 5000 km
  • 7000 8000 km
  • Store µ µ- simultaneously
  • 1021 muon decays/yr
  • Eµ 25 GeV

9
The International Design Study
initiative
  • NuFact06
  • Made the case for high-sensitivity
    neutrino-oscillation programme for second half of
    next decade and concluded

10
NuFact06 recommendation
  • Neutrino Factory IDS
  • Continue holistic approach of ISS
  • Goal deliver Neutrino Factory CDR by 2012

11
Strategic review conclusions
  • Reviews of particle-physics strategy in Europe
    and the US concluded that
  • Future neutrino programme be developed as an
    internationally coordinated programme
  • Goal to define the optimal programme around
    2012
  • NuFact community aspiration matches this

12
(No Transcript)
13
ISS/IDS transition as seen at NuFact06
  • Progress since NuFact06
  • IDS initiative (transition phase) established
  • EU FP7 DS (Euro?) submitted
  • Ranked 1, now negotiating contract
  • See M.Lindroos, WG3, Tuesday, 1500
  • IDS initiative now drawing to an end
  • Goal to launch IDS at this meeting NuFact07

14
IDS ad hoc Steering Group
  • Formed Oct/Nov 2006
  • Met nine times
  • http//www.hep.ph.ic.ac.uk/ids/organisation/meetin
    gs.html
  • Achievements
  • NF IDS WWW page and mailing lists
  • See http//www.hep.ph.ic.ac.uk/ids
  • Over-arching goals for NF IDS (next slide)
  • http//www.hep.ph.ic.ac.uk/ids/docs/IDS-ahSG-07-01
    .pdf
  • First plenary IDS meeting at CERN (29-31 March
    2007)
  • See http//www.hep.ph.ic.ac.uk/ids/communication/c
    ern-2007-03-29/index.html
  • IDSahSG endorsed at CERN meeting
  • Representation
  • K.Long (Co-ordinator), A.Blondel, A.Bross,
    P.Dornan, M.Dracos, R.Edgecock, P.Huber, H.Kirk.
    Y.Kuno, Y.Mori, M.Lindner, M.Lindroos, N.Mondal,
    Y.Nagashima, V.Palladino, S.Pascoli, P.Soler,
    M.Zisman

15
IDS goals
  • Goal of NF IDS
  • Neutrino Factory RDR (2012)
  • Engineering designs for most components
  • Neutrino Factory IDR (2010)
  • Marks transition from
  • Concept development/RD with engineering support
    to
  • Significant engineering effort with
    concept-development/RD programmes to mitigate
    risks

16
NuFact07 IDS-NF launched
Steering Group
A.Blondel, K.Long (chair), M.Zisman,
Y.Kuno, A.Donini, P.Huber, S.Pascoli,
W.Winter, S.Berg, M.Medahi, Y.Mori, C.Prior,
A.Bross, A.Cervera, N.Mondal, P.Soler
W/g leaders or nominee to serve on steering group
17
IDS-NF steering group activities
  • Second IDS-NF plenary meeting
  • 1617 January 2008, RAL
  • Aims
  • Establish the IDS-NF programme and set the goals
    for the study over the period January 2008 to
    NuFact08
  • At NuFact08 need to be ready with a longer term
    plan
Write a Comment
User Comments (0)
About PowerShow.com