SCM Metrics - PowerPoint PPT Presentation

Loading...

PPT – SCM Metrics PowerPoint presentation | free to download - id: 11043f-ZDc1Z



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

SCM Metrics

Description:

METRICS 'Without the Data.... You are just an Opinion' ... SCM Metrics. Release 3 Build 3. I&T SCCB. Overall Timeframe for Issues ... SCM Metrics. Audit Findings ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 15
Provided by: Lapt210
Learn more at: http://www.dtic.mil
Category:
Tags: scm | metrics

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: SCM Metrics


1
SCM Metrics
Draw the Process
2
SCM Metrics
3
SCM Metrics
Collect the Data
4
SCM Metrics
CM Audits
5
SCM Metrics
Provide the METRICS
Without the Data. You are just an Opinion
6
SCM Metrics
R3B3 Mean (as of 26 Feb 01) 14 Workdays
R3B2Mean 65 Workdays
  • Areas of Improvement
  • SCM Procedures re-written to clarify process.
  • SCM Process identified and defined.
  • SCM Communications with Engineering Community
    Increased.

Red Unacceptable Yellow Marginal
Green Goal Actual
Estimate/Goal
7
SCM Metrics
CM Performance Measurement Indicators CM Performance Measurement Indicators CM Performance Measurement Indicators
Category Jan 01 Feb 01
CM Planning Mgt 1.34 1.36
CM Identification .65 .44
CM Change Control .95 .70
CM Status Acct. 1.99 1.65
CM Audits 3.32 1.25
Analysis Rationale
CM Planning Management In February a significant effort was spent creating and improving CM Process Procedures (CRU-CM-008, CRU-CM-015, CRU-CM-022, CRU-CM-027, CRU-CM-032), creating the Registration Briefings for the CSCI/CSC re-groupings, and creating the Crusader Configuration Items (CI) Tree. CM Status Accounting In February provided increased data capabilities in the CMADS and CARDS Databases, and produced improved product structure for the Software Developmental Library (SDL). CM Audits In February conducted extensive Audits and Verification of CUI, AGP, and OSS data in CMADS.
8
SCM Metrics
Release 3 Build 3 IT SCCB
Number of Issues
(Issue Status)
9
SCM Metrics
Release 3 Build 3 IT SCCB
Number of Issues
(Issue Status by Severity)
10
SCM Metrics
Average Days To Closure
Overall Timeframe for Issues (Open to Closure
Status By Release Build)
11
SCM Metrics
Release 3 Build 3 IT SCCB
Average Days To Closure
Timeframe for Issues (By Priority Status)
12
R3B5 Baseline Progress
Blue SCM Baseline Completed. Green
Development Activities In-Progress
Integ. Test (Completion Date Nov 01)
Software Development (Planned Completion Date
Sept 01)
CSCI Imp.
CUT
DD
Detailed Design Walkthrough Activities 83
Complete
Code Unit Test Walkthrough Activities 58
Complete
CSCI Implementation Walkthrough Activities
33Complete
13
SCM Metrics
Audit Findings
Number of Occurances
(Problem Areas)
14
CONCLUSION
  • Effective Configuration Management is critical to
    the success of the Program.
  • SCM is critical to
  • Successful software development and the
    preservation of SW technical artifacts
    baselines.
  • Achieving SEI-CMM L3 and beyond.