Title: E. Wiezorrek, O.H. Bauer MPE Garching


1
E. Wiezorrek, O.H. BauerMPE Garching
EGSE/IEGSE and MIB
2
Starting Point Routine Phase
3
Major Goal Smooth Transition between Mission
Phases
4
EGSE Working Group
  • Started in Oktober 1999
  • Goal Common development of EGSE for ILT and IST
  • Up to now 45 telecons or meetings
  • Participants
  • HIFI, PACS, SPIRE
  • Di/TOS
  • Project
  • HSC
  • and
  • Alcatel
  • Astrium

5
EGSE/HCSS Set-up for ILT
6
EGSE for ILT
  • Common development
  • CDMS Simulator SPIRE
  • Test Equipment Interface concept HIFI
  • Router HIFI
  • SCOS 2000 support Di/TOS
  • MIB support Di/TOS, HSC
  • First complete version mid 2002
  • Test Control PACS
  • TOPE Di/TOS, PACS
  • Out of Limit / Telecommand History ESOC, SPIRE,
    HSC
  • Available now
  • On-board Software Management ESOC

7
IEGSE/CCS for IST
8
IEGSE Hardware
  • The IEGSE is a common purchase by all three
    Herschel Instruments based on ILT-EGSE concept
  • Hardware set-up can be reconfigured to replace
    any failed system
  • The IEGSE has been pre-configured and tested at
    MPE on 20/22 Sep 04 by three instrument teams and
    HSC
  • The IEGSE has been installed at Astrium,
    Ottobrunn, and acceptance tested together with
    CCS on 15/17 Nov 04
  • CCS/IEGSE configuration has been used for first
    WE tests of SPIRE and PACS (mid Dec 04)

9
  • EGSE Hardware Overview

10
  • IEGSE Overview

11
Open Points
  • Bug in TOPE system of CCS ? SPR raised
  • When a test procedure read a TM parameter not
    always the most recent value is read which
    seriously hampers CcsHandler
  • When PACS/DPU and CCS/CDMU front end are started
    at the same
  • time the first TC has to be sent twice ? NCR
    raised
  • MIB HPSDB bridge file conversion is not stable
    yet
  • MIB changes required due new naming conventions
    for HPSDB
  • Set-up of CCS seems to be complex
  • Access to remote ICC sites not yet possible
  • OBS upload not yet possible ESOC OBSM sytem
    will be used
  • Next EGSE WG meeting at Astrium, Ottobrunn, on
    26 Jan 05 to
  • discuss overall PLM EGSE situation
Write a Comment