Title: Blue Prism Technical Interview Questions and Answers | Hope Tutors
1Blue Prism Technical Interview Questions and
Answers
2Is coding needed for Blue Prism?
3- Blue Prisms digital personnel is built, which
combines both operations and technology thereby
sticking to an operating model that encompasses
all of the enterprise. - So generally the coding process is not necessary
and Blue Prism is capable of automating any
software.
4What are the thin and thick clients and the
differences between them?
5- Thin client is an application whose inherent
attributes are unobtainable when looked into with
the RPA tools. (Ex Citrix and other virtual
environments.) - Thick client is an application whose native
attributes are reachable and can be used when
searched with the RPA tools. (Ex Calculator and
Internet Explorer browser.)
6What about the security and the auditability of
Blue Prism?
7- Security and auditability are intrinsically built
into the very design of Blue Prism robotic
automation platform at multiple levels. The
runtime environment is fully segregated to edit
the process. - Allowance to create, edit and run the various
processes and business objects are particularly
mapped to each authorized customer.
8To run Blue Prisms automation platform, what
hardware infrastructure is used?
9Blue Prism is primarily developed to provide
flexibility and to meet the most sophisticated IT
life cycle for IT operational faithfulness,
protective nature and the ability to support.
10What is process studio and how does it affects
Blue Prism?
11- A blue prism Process is generally outlined as a
sketch plan that looks like a usual business flow
chart diagram. Processes are created in the Blue
Prism zone called Process Studio which resembles
the other process modeling applications and
utilizes the standard flow diagram symbols and
connotation.
12Define session variables.
13- Session Variables are discrete to the instance of
a process. If two instances of the similar
process perpetuate at the same time and ratio,
they both have the similar session variables and
the Session Variables values will be
non-identical and disparate. - From the control room we can gaze and alter the
session variables.
14What is a Visual Business Object?
15- Visual Business Object (VBO) represents the
adapter to the user-side interface of a distinct
application. To bring it to an end, every Visual
Business Object has three major components. - In one or more pages, each of which deploys all
or part of an operation that the VBO can operate
on.
16How should we select a connector in Blue Prism?
17- The connectors work is to tackle low-level
interaction with an applications user interface.
Blue Prism offers a several connector choices. - An HTML connector
- A Windows connector
- A Java connector
- With the Microsoft Foundation Class (MFC)
library, Visual Basic 6, PowerBuilder, and other
Windows-based user interface technologies.
18How to deploy the Blue Prism applications?
19- Just like many of manual processes, automating
process needs to be controlled and tamed. To
follow this Blue Prism provides two tools - Control Room
- System Manager
20- The purpose of control Room is to let the
business analysts to work with Blue Prism
processes and tools. - Starting and halting the instances of Blue Prism
processes. Its also feasible to do this from the
command line and with external software, Control
Room is not necessary.
21How a particular action is and published in
Bluecreated Prism?
22- As the moniker go, actions involve the
follow-through of a business object. So every
individual action consists of a set of stages
along with data modules holding information used
by that certain action. - Actions are published, which allows it be called
by methods and possibly other software. An action
can also abide hidden, and making it available
only to other actions in this business object.
23(No Transcript)