Draw the network and identify critical path - PowerPoint PPT Presentation

About This Presentation
Title:

Draw the network and identify critical path

Description:

Need Answer Sheet of this Question paper Contact us at answersheethelp@gmail.com M: 7019944355 – PowerPoint PPT presentation

Number of Views:14
Slides: 7
Provided by: marketinganswersheet
Tags:

less

Transcript and Presenter's Notes

Title: Draw the network and identify critical path


1
Project Managementinfo_at_answersheets.in91
95030-94040
2
  • Project Management
  •  
  • Q1.What quality control methods prevalent in
    project management? Explain why TQM is important
    in project management,
  •  
  • Q2.Explain the finalization of project
    implementation schedule.
  •  
  • Q3.Discuss the problems in organizing human
    resource in a project.
  •  
  • Q4.Define organizing systems. Discuss the
    various designs of systems.
  •  

3
  • Q5.What are the factors, which control the cost
    of a project? Discuss briefly on each. How does
    time over-run affect the project cost?
  •  
  • Q6.Bring out the difference between CPM (Critical
    Path Method) and PERT (Program Evaluation and
    Review Techniques) and their suitability of use.
    Explain critical path for the above with suitable
    examples.
  •  
  • Q7.What is resource leveling in relation to
    PERT/CPM? 1030 (b) List of activities for
    erecting a canteen in the factory is given below
    with other relevant details. Job A must precede
    all others while job E must follow all others.
    Apart from this, jobs can run concurrently also

4
  • (a)Draw the network and identify critical path
  •  
  • (b)Crash the network fully to find out minimum
    duration.
  •  
  • Q8.If indirect costs are Rs. 300/day determine
    the time-cost trade off for the project. The time
    and cost estimates of different activities of a
    project and their precedence relationship are '
    given below Overhead costs amount to Rs. 1,000
    per week. It is stipulated that the contractor
    will have to pay a penalty of Rs. 2,000 per week
    for completing the project beyond 16 weeks

5
  • (a)Show the critical path in the network Diagram.
  • (b)Find out the cost slope for every activity
    using normal and crash date for time and cost.
  • (c)Crash the project to 16 weeks, Estimate the
    total cost of crashing.
  •  

6