DEVRY ACCT 505 Week 1 Case Study - PowerPoint PPT Presentation

About This Presentation
Title:

DEVRY ACCT 505 Week 1 Case Study

Description:

DEVRY ACCT 505 Week 1 Case Study Check this A+ tutorial guideline at – PowerPoint PPT presentation

Number of Views:21

less

Transcript and Presenter's Notes

Title: DEVRY ACCT 505 Week 1 Case Study


1
DEVRY ACCT 505 Week 1 Case Study
  • Check this A tutorial guideline at
  •  
  •  
  • http//www.assignmentcloud.com/acct-505-devry/acct
    -505-week-1-case-study
  •  
  • For more classes visit
  •  
  • http//www.assignmentcloud.com
  • Top Switch Inc. designs and manufactures switches
    used in telecommunications. Serious flooding
    throughout the state of Tennessee affected Top
    Switchs facilities. Inventory was completely
    ruined, and the companys computer system,
    including all accounting records, was destroyed.

2
  • Before the unfortunate incident, recovery
    specialists cleaned the buildings. The company
    controller is very nervous and anxious to recover
    whatever records he can to support the insurance
    claim for the destroyed inventory. After
    consulting with the cost accountant, they decide
    to retrieve the previous years annual report for
    the beginning inventory numbers. In addition,
    they also agreed that they need first quarter
    cost data.
  • The cost accountant was working on the first
    quarter results before the storm hit, and to his
    surprise, the report was still in his desk
    drawer. After reviewing the data , the
  • information shows the following information
    Material purchases were 325,000 Direct Labor
    was 220,000. Further discussions between the
    controller and the cost accountant revealed that
    sales were 1,350,000 and the gross margin was
    30 of sales. The cost accountant also
    discovered, while sifting through the
    information, that cost of goods available for
    sale was 1,020,000 at cost. While assessing the
    damage, the controller determined that the prime
    costs were 545,000 up to the time of the damage
    and that manufacturing overhead is 65 of
    conversion cost. The cost accountant is not sure
    about all of this, but he decides to see what he
    can do with the information.

3
  • The beginning inventory numbers are as
    followsRaw Materials, 41,000Work in Process,
    56,000Finished Goods, 35,000Required
  • Determine the amount of cost in the Raw
    Materials, Work in Process, and Finished Goods
    Inventory as of the date of the storm. ( Hint
    You may wish to reconstruct the various schedules
    and statements that would have been affected by
    the companys accounts during
  • the period.)Grading Rubric for Case Study
    ICategoryPointsDescriptionDocumentation
    Formatting1022Worksheet will be done in
    Excel and will contain formulas to receive maximum

4
  • creditOrganization and Cohesiveness1533Calcul
    ations for all parts should be organized and
    correctly labeled.Content2045A quality case
    study will have all required work completed and
    will be correct.Total45100A quality project
    will meet or exceed all of the above
    requirements. 
Write a Comment
User Comments (0)
About PowerShow.com