A brief note on the correct application of Copy/Monitor tool that is contained in Revit - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

A brief note on the correct application of Copy/Monitor tool that is contained in Revit

Description:

Copy/Monitor tool which is incorporated in Revit is largely used by BIM modelers during design coordination wherein in all the important design stakeholders such as architects, structural engineers and MEP engineers integrate on a building project. – PowerPoint PPT presentation

Number of Views:13
Updated: 1 March 2015
Slides: 8
Provided by: jbhtesla

less

Transcript and Presenter's Notes

Title: A brief note on the correct application of Copy/Monitor tool that is contained in Revit


1
JBH-Tesla Design Group,Inc.
  • Call Us 914-944-3377
  • E-mail Us projects_at_jbhtesla.com

2
A brief note on the correct application of
Copy/Monitor tool that is contained in Revit
3
  • Copy/Monitor tool which is incorporated in Revit
    is largely used by BIM modelers during design
    coordination wherein in all the important design
    stakeholders such as architects, structural
    engineers and MEP engineers integrate on a
    building project.
  • In other words when interdisciplinary design
    teams (architectural, structural and MEP design
    teams) cooperate on a building project and share
    vital design information among each other, they
    optimize Copy/Monitor tool for monitoring design
    elements and for communication changes. They have
    to use Coordination Revit tool when they review
    warning about the changes made to monitored
    elements.

4
Correct application of Copy/Monitor tool in Revit
  • So far it is clear that Cop/Monitor tool is used
    for monitoring elements or imperative part of the
    design when interdisciplinary models are linked
    together.
  • It helps in coordinating the changes to different
    disciplines that have been made by BIM modelers
    in building design.
  • When modelers working on Revit link another Revit
    model in their project monitoring elements of
    both linked and host model becomes somewhat
    complicated and require the application of
    correct tools.

5
  • So for example architectural model is linked in a
    structural project then different tools are used
    for copying and monitoring the elements of
    structural model and architectural model.
  • These tools can be accessed by Revit users after
    clicking on the Copy/Monitor tool which
    ultimately leads to the appearance of a drop down
    menu which incorporates Current Project tool
    and Select Link tool.
  • That means when interdisciplinary models are
    linked in Revit then for copying and monitoring
    the elements of host project and linked project
    Revit users have to make use of different tools.

6
  • For copying and monitoring the elements of a host
    projects, Revit users have to click on the
    Copy/Monitor tool after which they have to use
    Current Project tool from the drop down menu.
  • That means for monitoring the elements of the
    host project they have to use Current Project
    tool.
  • On the other hand for copying and monitoring the
    elements of a linked project they can use Select
    Project tool from the drop down menu.
  • In this way design can be monitored effectively
    by Revit users during interdisciplinary design
    coordination.

7
Contact Us
  • JBH-Tesla Design Group, Inc.
  • 100 Executive Boulevard -Suite 204
  • Ossining, New York 10562
  • Phone  (914) 944 3377
  • projects_at_jbhtesla.com
Write a Comment
User Comments (0)
About PowerShow.com