Indsat Presenration - PowerPoint PPT Presentation

1 / 40
About This Presentation
Title:

Indsat Presenration

Description:

ACE LT-16 XL ( INDIA) X Axis. 320 mm. Z Axis. 350 mm. Max ... INDSAT CORPORATION has certified for Quality Management Systems by AQSR Inc. Data. ISO 9001:2000 ... – PowerPoint PPT presentation

Number of Views:146
Avg rating:3.0/5.0
Slides: 41
Provided by: nsara
Category:

less

Transcript and Presenter's Notes

Title: Indsat Presenration


1
INDSAT CORPORATION
WELCOME TO
INDSAT CORPORATION 165,DEVELOPED PLOT
ESTATE,PERUNGUDI,CHENNAI- INDIA- 600
096.Phone- 91-44-42152147/ 29780373 Fax
91-44-24961425 E-mail- indsatcorp_at_yahoo.co.in
2
OUR VISION - TO BE ONE OF THE LARGEST REPLACEMENT
SUPPLIERS OE SPPLIERS
INTRODUCTION ABOUT INDSAT CORPORATION
3
CONTENTS
  • COMPANY PROFILE
  • HISTORY OF COMPANY
  • ORGANIZATION STRUCTURE
  • INFRASTUCTURE
  • BUILDING
  • FOUNDRY SHOP
  • CNC SHOP
  • MACHINESHOP
  • SHOT BLASTING SHOP
  • UTILITIES
  • INSTRUMENTS
  • MANUFACTURING PRODUCTS
  • OUR CUSTOMERS
  • SALES
  • QUALITY MANAGEMENT SYSTEMS
  • MANAGEMENT POLICY
  • OPERATING SYSTEMS LEADERSHIP
  • QUALITY SYSTEMS ACCRIDIDATION

4
CONTENTS
  • CUSTOMER SATISFACTION ACTIVITIES
  • SUPPLIER MANAGEMENT SYSTEM
  • STORES MANAGEMENT SYSTEM
  • CONTROL OF PRODUCTION EQUIPMENT
  • PROCESS PERFORMANCE TRENDS

5
1.COMPANY PROFILE
COMPANY PROFILE
Company Name
Indsat Corporation
CEO
Mr.Anbu Selvan
Established on
Oct 1997
Location
Chennai Tamil Nadu -India
Casting Products
DIRECTEMPLOYEES
45 ( APR08)
PRODUCT
ALUMINIUM DIE CAST PRODUCTS
Machined Parts
6
...COMPANY PROFILE
COMPANY PROFILE
7
...COMPANY PROFILE
COMPANY PROFILE
Machines
Qty
Multi Head Drilling
2 Nos
Grinding
2 Nos
Welding
2 Nos
8
...COMPANY PROFILE
COMPANY PROFILE
9
...COMPANY PROFILE
COMPANY PROFILE
Spare Capacity as on Apr08
10
2.HISTORY OF COMPANY
MAIN HISTORY OF COMPANY
Company Formation - Oct.1997
Commercial production start at Foundry
- Jul.1998
ISO 90012000 certification - Aug.2001
Conventional Machine Shop Production Start -
Jan.2002
CNC Machine Shop Production Start - Apr.2005
ISO/TS 169492002 System Implementation -
Apr.2008
11
3.ORGANISATION CHART
ORGANIZATION CHART
CEO(K.S.Anbu Selvan)
MR (Mrs.Yamini )
ManagerMarketing
Manager Foundry
Manager Purchase Administration Accounts
Manager Machine Shop
CustomerRepresentative
Foundry Supervisors
Clerks
Foreman
Workmen(Contract Labour)
Production In charge(Conventional)
Production In charge (CNC Shop)
Quality In charge
CNC Operators
Operators
Quality Inspectors
12
4.INFRASTRUCTURE
4.A.BUILDINGS
MAIN BUILDING
FOUNDRY SHOP
13
INFRASTRUCTURE
4.B.FOUNDRY SHOP
TILTING FURNACE
OIL SUPPLY SYSTEM
14
INFRASTRUCTURE
4.B.FOUNDRY SHOP
TEMPERATURE CONTROLLER
CASTING DIES
15
INFRASTRUCTURE
4.C.CNC SHOP
CNC LATHE
CNC LATHE
16
INFRASTRUCTURE
4.D.MACHINE SHOP
17
INFRASTRUCTURE
4.E.SHOT BLASTING SHOP
SHOT BLASTING MACHINE
18
INFRASTRUCTURE
4.F.UTILITIES
COUPLED COMPRESSORS
GENSET
19
INFRASTRUCTURE
4.G.INSTRUMENTS
Checking Concentricity
Air Plug Gauge
20
INFRASTRUCTURE
4.H.PACKING
COMPONENT STEEL TRAY
PACKING
21
5.MANUFACTURING PRODUCTS
Product Application
Our Manufacturing Products are used in..
Automobiles
Electrical Transmission Systems
Railway
Construction
General Engineering
22
5.MANUFACTURING PRODUCTS
SAMPLE CASTINGS
De Bracket
De Bracket
Fuel Injection Pump Cover
Water Pump Body
23
5.MANUFACTURING PRODUCTS
CASTINGS
Fixing Brocket
C.E. Bracket
Water Pump Body
Fuel Injection Pump Cover
24
...MANUFACTURING PRODUCTS
CASTINGS
Fixing Bracket
Fixing Bracket
Fixing Bracket
Fixing Bracket
25
...MANUFACTURING PRODUCTS
CASTINGS
Fixing Bracket
Fixing Bracket
Fixing Bracket
Fitting NUT
26
...MANUFACTURING PRODUCTS
CASTINGS
Nut
PUMP
Casing
Casing
27
...MANUFACTURING PRODUCTS
CASTINGS
Mounting Bracket
Electric Connector
Ring Clamp
Electric Connector
28
6.OUR CUSTOMERS
OUR MAIN CUSTOMERS.
1. LUCAS-TVS
11. SICKEME CONNECTORS INDIA LTD
2. ALCEL GMBH GERMANY
3.FIE- DELPHI TVS
4. STERLING INDUSTRIES
5.ASHOK LEYLAND
6.WESTERN THOMSON
7. W.S.INDUSTRIES
8. COMPACT SYSTEMS - AUSTRALIA
9. ASCO INDIA PVT LTD
10. TATRA TRUCKS -HOSUR
29
7.SALES
SALES
Trend of Sales
30
8. QUALITY MANAGEMENT SYSTEMS
8.A. MANAGEMENT POLICY
Mission
VISION
To be one of the largest replacement suppliers
and original equipment suppliers to Automotive
Industries undertakings in India and plan to grow
with Global Vision
  • Our Mission would be to emerge as one of the
  • Most sought after
  • Customer Driven
  • Quality Products
  • Assisting our customers to Acquire and retain a
  • competitive edge

2008 POLICY
GOAL -2008
  • The Quality Policy of the INDSAT CORPORATION is
    deployed through the following Objectives
  • Achieving Zero Defect Supplies
  • Achieving on time delivery
  • Achieving 2 Cost Saving every year
  • Spending 20 man-days of training to employees per
    year
  • Customer Satisfaction through complying to the
    requirements of product and Continual Improvement
    of Quality Management System is the commitment of
    Indsat Corporation

31
... QUALITY MANAGEMENT SYSTEMS
8.B. OPERATING SYSTEMS LEADERSHIP
Objectives Mops
VISION
Policy Objective Decisions
Support action to Achieve Target
Support for Major Achievement
Action to Achieve Target
Management Review Meeting and Monthly review
meeting for reviewing the actual against Target
Performance Review Meeting
Feed backs with Suggestion
Confirm to the result of evaluation
Standardization
Improvement
32
QUALITY MANAGEMENT SYSTEMS
8.B. OPERATING SYSTEMS LEADERSHIP
Managers are committed for achieving the Vision
and Management Targets.
33
QUALITY MANAGEMENT SYSTEMS
8.C. QUALITY SYSTEMS
INDSAT CORPORATION has certified for Quality
Management Systems by AQSR Inc
34
9.CUSTOMER SATISFACTIONACTIVITIES
ACTIVITY OF CUSTOMER SATISFACTION
Customer Satisfaction
Main Activity
Result
? Delivery Rating
? Customer satisfaction
- On time Delivery - Meeting expected quality
- Process Improvements - Over all
performance
97
96
Customer Interaction Process
94
2005
Customer Satisfaction
2006
2007
? Quality Rating
? New Product
Marketing
100
100
New products are Developed as per - APQP -
ISAR
96
Engineering
2005-06
2004-05
2006-07
? Satisfaction Survey
Manufacture
98
99
? Customer Communication
95
- Phone ,Email , Fax
Delivery
2005-06
2004-05
2006-07
35
10.SUPPLIER MANAGEMENT SYSTEM
5.0 SUPPLIER MANAGEMENT SYSTEM
Supplier Selection criteria
  • QMS certification
  • Customer approved suppliers
  • Approved suppliers for Leading OEM
  • like Telco ,Maruthi, Bhel,Ford etc
  • Our Group companies
  • Based on our past Experience (Only supplier
  • who has registered before our QMS
    certification)
  • (Any one of the above)

Supplier Evaluation
  • Initial Supplier Evaluation
  • Acceptable Level Minimum 60

Supplier Re-Evaluation
  • Frequent Supplier Audit

Supplier Monitoring Improvement
  • Supplier Rating Systems
  • Supplier Meetings
  • Supplier Improvement (100 PPM activities)
  • Supplier Level up Plan

36
11.STORES MANAGEMENT SYSTEMS
6.0 STORES MANAGEMENT SYSTEM
IDENTIFICATION SYSTEMS OF STORES
MATERIAL RECEIPT SYSTEMS
Enter the supply details in Material Inward
Register
Receive Material With DC and Inspection / Test
Report
Verify the Quantity by Weighing /Counting
Store the material With Identification Tag
Color Code
MATERIALS ISSUING SYSTEM
Receive the Material Requisition slip
Issue the Material
Verify the Approval Status
Update the stock register
37
13.CONTROL OF PRODUCTION EQUIPMENT
CONTROL OF PRODUCTION EQUIPMENT
M/C Management
Tools Management
  • Preventive Maintenance
  • Break down Maintenance
  • Predictive Maintenance
  • Preventive Maintenance
  • Break down Maintenance

Analyzing Tool
Analyzing Tool
  • Die History Card
  • Equipment calibration Monitoring
  • Tool Life monitoring
  • and tool condition
  • review system

Spare Parts Management
Spare Parts Management
  • Critical Parts analysis
  • Minimum spare parts requirements
  • Maintained
  • Critical Parts analysis
  • Minimum spare parts requirements
  • Maintained

38
16.PROCESS PERFORMANCE TRENDS
PROCESS PERFORMANCE TRENDS
Customer PPM
Target 0 PPM
In House PPM
Target 350 PPM
Customer Complaint
Target Nil
Delivery Rating
Target 100
39
PROCESS PERFORMANCE TRENDS
PROCESS PERFORMANCE TRENDS
Productivity
Machine Breakdown
Target 5
Target 95
Target 12Hrs/Month
Training Hours
Machine Utilization
Target 50
40
THANK YOU
Write a Comment
User Comments (0)
About PowerShow.com