School Enrollment Plan 20052006 Submitted by: Dr. James H. Lytle, Superintendent March 15, 2005 - PowerPoint PPT Presentation

1 / 38
About This Presentation
Title:

School Enrollment Plan 20052006 Submitted by: Dr. James H. Lytle, Superintendent March 15, 2005

Description:

184 0 -Will combine with -Saint. Robbins Main and Joachim's. cease to ... Saint Joseph's 37 Sherman Avenue 250 Expires 6/30/05. Trenton, NJ. Potential Leases ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 39
Provided by: TBOE
Category:

less

Transcript and Presenter's Notes

Title: School Enrollment Plan 20052006 Submitted by: Dr. James H. Lytle, Superintendent March 15, 2005


1
School Enrollment Plan2005-2006Submitted by
Dr. James H. Lytle, SuperintendentMarch 15, 2005
2
Goals
  • Implement the high school renovations without
    student dislocation, program erosion or lowering
    student achievement.
  • Realign schools to K-8 configuration and obtain
    equity in class sizes, space, safety and student
    achievement.
  • Provide access to Trenton Public Schools for
    approximately 200-300 parochial school students.
  • Create a separate high school at the West State
    Street Campus.
  • This will promote
  • - College and career programs
  • - Department of Education Abbott Regulations
  • emphasizing smaller high schools.
  • - Improve safety and school environment.
  • - Promote student achievement.

3
Options
  • Option 1 - Student displacement 600
    Construction duration
  • 66-72 months.
  • Option 2 - Project A Student displacement
    1000 Construction
  • duration 30-34 months 376,000 sq. ft.
  • Project B Student displacement 1400
    Construction
  • duration 30-34 months 30 new classrooms
  • 565,000 sq. ft.
  • Option 3 - Student displacement 0 Construction
    duration
  • Buildings 32-35 months. Demolition and
    Playing
  • Fields 12-18 months Approximate Size
  • 500,000 SF

4
Appendix 1Option 1
5
Option 2
6
Option 3
7
Comparison
8
Appendix 2
  • CURRENT 2005-2006 2006-2007 2007-2008
    2008-2009
  • Rivera Mott
    Jefferson/King Parker(SM) Dunn Roebling K-8
  • Columbus Monument Hill
    Gregory Washington
  • Kilmer Grant/Holland Franklin
  • Robeson/H-W Cadwalader
  • Stokes
  • Robbins

9
Appendix 3CADWALADER SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 288 314 -Keep current Grade 5
  • for Septembers
  • Grade 6
  • -Keep current Grade 6
  • for Septembers
  • Grade 7
  • -Need 2 rooms
  • -1 Pre-K to Kilmer

10
COLUMBUS SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 229 229 -Move PK students to -It is
    proposed
  • Kilmer that the new
  • -Move K through 3 Columbus
  • to Jefferson building
  • -Grade 4 to 8 stays become a
  • -Take five (5) of magnet school
  • current Grade 7 in 2007-08
  • from Holland

11
FRANKLIN SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 451 450 -No change -Overflow to
  • annexs

12
GRANT SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 465 711 -Becomes a PK to -Add 150
  • 8 School students from
  • -Takes over Robbins Sch.
  • Granville Building -Make 50
  • as an annex N. Clinton into
  • -Take 150 students an annex for
  • from Robbins (K-3) Grant
  • because annex is -Roebling
  • closing. Building may
  • be solution

13
GREGORY SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 427 477 -Keep current Grade K-8
  • 5 for September
  • Grade 6
  • -3 rooms needed
  • -Two (2) Gr. 7
  • return from
  • Monument
  • -Move one (1)
  • Spec. Ed. Class
  • out

14
HARRISON SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 195 191 -Overflow to new -K-5
  • facility

15
HILL SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 540 598 -Keep current -Additional
  • Grade 5 for students from September
    Hedgepeth/
  • Grade 6 Williams may
  • be added for
  • Grades 7 8
  • -K-8

16
JEFFERSON SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 417 450 -Take some students -Needs
  • from Columbus additional room
  • Grade K through 3 for Grade 3
  • students
  • -Pre K-8 in
  • 2007

17
KILMER SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 411 483 -Add 2 Pre-K (1 from -Only 1 room
  • Columbus, 1 from available
  • Cadwalader?)
  • -Pick up current -K-8
  • Grade 6 from Stokes
  • -1 room needed

18
MONUMENT SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 386 400 -Keep current Grade 7 -K-8
  • for September
  • Grade 8

19
MOTT SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 397 434 -Keep current Grade 7 -K-8
  • for September
  • Grade 8 or send them
  • to Dunn

20
PARKER SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 240 250 -No Change -The Parker
  • building will
  • not be ready
  • for occupancy
  • until February,
  • 2006

21
PARKER ANNEX
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 207 200 -No Change -Move to
  • renovated
  • Parker School
  • in 2006

22
RIVERA SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 451 475 -Pick up 1 of the -K-8
  • current Grade 7
  • classes from Holland

23
ROBBINS SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 409 435 -Send 150 students -Consolidation
  • to Grant of school site
  • -Take all Robbins -Streamline
  • Annex students enrollment
  • back patterns
  • Pre-K only
  • -Send current and -Limited space
  • future Grade 6 to for pre-
  • Dunn kindergarten
  • classes

24
ROBBINS ANNEX
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 184 0 -Will combine with -Saint
  • Robbins Main and Joachims
  • cease to exist lease expires

25
ROBESON SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 427 0 -Combine with -K-8 merge
  • Hedgepeth and with
  • cease to exist Hedgepeth/ Williams

26
STOKES SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 412 408 -Send current
  • Grade 6 to Kilmer

27
WASHINGTON SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 365 354 -Eliminate Grade 6 -Overflow to
  • annexs
  • -Send current Grade 6 -Franklin/
  • to Dunn for September Harrison
  • Grade 7
  • -Room for 1 class

28
WILSON SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 406 424 -Send current Grade
  • 6 to Columbus/Dunn/
  • King for Grade 7

29
DUNN SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 756 850 -Take current and
  • future Grade 6 from
  • Washington and
  • Robbins

30
HEDGEPETH-WILLIAMS SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 636 916 -Merge with Robeson -Consolidate
  • to K-8

31
HOLLAND SCHOOL
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 321 0 -Sent five (5) Grade -Close Holland
  • 7 classes to Columbus, -Send students
  • two (2) to Grant, one to Grant
  • (1) to Rivera, two (2)
  • to Alternative Middle
  • School
  • -Send three (3) special
  • ed. classes to other
  • sites.

32
KING/TCHS KING
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 342 330/ -Keep their current
  • 190 Grade 8 for September
  • Grade 9
  • -Current Grade 9 will
  • move to TCHS
  • -The Supervision of the
  • campus will move to the
  • Principal of King Middle

33
TCHS-MAIN
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 1903 2000 -Repeaters to Sherman
  • Campus
  • -New 9th from Dunn and
  • H/W
  • -New 10th from King

34
TCHS/SHERMAN
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 168 220 -The Sherman Campus -Transition
  • will be supervised by Program to
  • the Daylight/Twilight Daylight/
  • Program. Twilight

35
TCHS-WEST
  • Enrollment Enrollment Changes Rationale
  • Current Projected
  • 871 900 -West Campus will -Awaiting
  • become a separate direction from
  • neighborhood high the Board
  • school
  • -Students from
  • Holland current
  • Grade 8, as well as
  • Kilmer, etc. will attend
  • this school

36
Enrollment Projectionsas of 10/2004
37
Currently Leased Parochial Schools2004-2005
  • SCHOOL LOCATION CAPACITY AVAILABILITY
  • Sacred Heart 327 S. Broad Street
    230 Expires 6/30/05
  • Trenton, NJ
  • Saint Joachims 25 Bayard Street
    200 Expires 6/30/05
  • Trenton, NJ
  • Saint Hedwigs 643 Indiana Avenue
    425 Expires 6/30/05
  • Trenton, NJ
  • Saint Marys 202 Grand Street 250 Expires
    7/31/05
  • Trenton, NJ
  • Saint Stanislaus 500 Smith Street
    250 Expires 7/31/05
  • Trenton, NJ
  • Blessed 720 Bellevue Avenue 300 Expires
    7/31/05
  • Sacrament Trenton, NJ
  • Saint Josephs 37 Sherman Avenue
    250 Expires 6/30/05
  • Trenton, NJ

38
Potential Leases
  • SCHOOL LOCATION CAPACITY
  • Holy Angels 1701 S. Broad Street 248
  • Trenton, NJ
  • Immaculate 520 Chestnut Avenue 228
  • Conception Trenton, NJ
  • Saint Anthonys 177 Leonard Avenue 261
  • Hamilton, NJ
  • Holy Cross 22 Grand Street 249
  • Trenton, NJ
Write a Comment
User Comments (0)
About PowerShow.com