Description:

Four Pilot Teams have formed, each focused on one of the ... Avocet. Model. Validator. Schlumberger. Eclipse. Reservoir. Simulator. Aspentech. HYSYS. Facility ... – PowerPoint PPT presentation

Number of Views:233
Avg rating:3.0/5.0
Slides: 10
Provided by: IBMU366
Category:

less

Transcript and Presenter's Notes

Title: PRODML Project Status Report WITSML SIG Review


1
PRODML Project Status ReportWITSML SIG Review
  • Lew Edison
  • May 12, 2006
  • Houston

2
PRODML Project Timeline UpdateMay 12, 2006 -
Status
Steering Committee Meetings
Months
2
4
6
8
10
12
  • Project planning
  • Team Kick-Off

Steering CommitteeMarch 20, 2006 Go For Pilots
May 12, 2006
  • Workshop preparation and scheduling
  • Standards investigation
  • Develop Scope

Content
  • Conduct workshops
  • Detailed Requirements
  • Macro Design
  • Design Communication Plan
  • Develop Test Bed Scenarios

Technology
  • Process mapping
  • Technology assessment
  • Detailed Requirements
  • Macro Design
  • Design POC
  • Build POC
  • Implementation guide outline
  • Process flow documentation
  • Plan Pilot

Start August 16, 2005
  • Pilot

End September 1, 2006
  • Project Management
  • Communication

Requirements
Build Communicate
Design-Develop-Test
Implementation
Phase 1 Scope and Define
3
www.PRODML.ORG
4
PRODML Current Status
  • Four Pilot Teams have formed, each focused on one
    of the following Major Operating Companies, each
    with from 3 to 5 Vendors
  • Shell
  • Chevron
  • Statoil
  • BP
  • Pilot Teams are implementing 4 workflows using
    the PRODML
  • Milestone Dates
  • 3/10/2006 - Deadline for Pilot Proposals
  • 3/20/2006 - Pilots Selected and Funded
  • 3/30/2006 - PRODML Pilot (v.81) Reference
    Architecture and XML Schema are Complete
  • 4/03/2006 - Pilot Project Development Kick Off
  • 5/10/2006 Publish V.81 RA, Schema, API
  • 8/15/2006 - Pilots Complete
  • 8/31/2006 V1.0 PRODML Standard Published
  • 8/31/2006 Transfer PRODML Deliverables to POSC
    for maintenance continued development.
  • 9/31/2006 - First PRODML compliant Production
    Optimization Applications Announced

Working
5
4 - Pilot Project Workflows
  • Plug and Play
  • Interface without the need of a central server
  • Universal data structure
  • Pilot 1 Model data management
  • Pilot 2 Model data management
  • Pilot 3 Steady-state gas lift optimization
  • Pilot 4 Dynamic field-wide optimization focused
    on momentum of water distribution used for
    flooding

6
Pilot No. 1 Model Management
TietoEnator PROSTY Production Database
Schlumberger DECIDE Data Validator
PETEX Prosper Well Model
Well Pressures Well Temperatures
Well Pressures Well Temperatures
Well Pressures Well Temperatures
Well Pressures Well Temperatures Derived Volumes
Derived Volumes Model Alerts
Field Systems with Smart Wells
Schlumberger Avocet Model Validator
Schlumberger Eclipse Reservoir Simulator
Aspentech IP21 Historian
Example XML Consumer
Derived Volumes Model Alerts
Aspentech HYSYS Facility Model
7
Pilot No. 2 Model Management
Model Alerts Data Alerts
Invensys InFusion Data Model Validator
Well Pressures Well Temperatures Metered Volumes
Invensys InFusion Notification
Derived Volumes
Well Pressures Well Temperatures
OSISoft PI Historian
PETEX Prosper Well Model
Field Systems
Well Pressures Well Temperatures
Weatherford WellFlo Well Model
Derived Volumes
8
Pilot No. 3 Gas Lift Optimization
Manual and Non-Historian Data
Sense Intellifield Portal
Optimizer Constraints Optimizer Targets
Optimizer Constraints Optimizer Targets Well
Pressures Well Temperatures
OSISoft ACE Data Distributor
Well Pressures Well Temperatures
Optimizer Constraints Optimizer Targets
Schlumberger GL Optimizer
OSISoft SiteCom Data Distributor
Optimizer Constraints Optimizer Targets Well
Pressures Well Temperatures
Well Pressures Well Temperatures
OSISoft PI Historian
Field Systems
Well Pressures Well Temperatures
Optimizer Recommendations
9
Pilot No. 4 Field Optimization
Invensys InSQL Historian
Tank Outlet Rate Take Inlet Rate Tank
Availability Tank Levels Tank Capacity
Notification Generic
Production (Allocation) Out of Scope
Disposal Well Rates
Network Models
TietoEnator Energy Components
SAP-PRA
Recommended Rates / Time Stamp Production,
Injections, Disposal Wells
Instruction Processor
Water Capacity Simulator Schlumberger RTPRO Opti
mizer
Set Points
PRODML Prod Injection Profile
Allocated Historical
Recommended Rates / Time Stamp Production,
Injections, Disposal Wells
Reporter PRODML
Landmark DSS Forecast
Well Tests
Decline Curves Production Injection
Availability Schedule Production Injectors
(Discover)
Historical Injection
Notification (Lowis)
Production Database Weatherford Lowis
Static Month Injections Rates Days On Well
Injection Target Well Injection Capacity
Well Models