Title: Export Import Bank of the United States 2005 Annual Conference Environmental Exports Panel
1 Export Import Bank of the United States 2005
Annual Conference Environmental Exports Panel
ARMENTROUT ROEBUCK MATHENY CONSULTING GROUP PC
2ARMENTROUT ROEBUCK MATHENY CONSULTING GROUP, PC
- International Engineering/ Architectural/
Construction Management firm - Located in Athens, Georgia
- Current projects in Africa, South America and the
Caribbean - Staff of 26
3ARMENTROUT ROEBUCK MATHENY CONSULTING GROUP
- Develops infrastructure projects for the public
and private sector - Provides design, financing acquisition
management, construction/project management
services - Typical projects water/wastewater treatment,
water distribution/wastewater collection,
industrial facilities, governmental and
commercial facilities, engineering/feasibility
studies.
4EXIM Bank Financed Projects in Grenada, West
Indies
5Grenada Water Pipeline Project
- Water pipeline project for Government of
Grenadas National Water Sewerage Authority
(NAWASA) - Project was developed over a 3-year period by
Armentrout Roebuck Matheny Consulting Group, P.C.
(ARMCG) - ARMCG provided all design/financing acquisition/
construction services - Project financing obtained through EXIM Banks
Environmental Exports Program
6Water Pipeline Project Information
- Pipeline was designed to convey potable water
from mountain water source to city of St.
Georges
Project water source in Concord
7Water Pipeline Project Information
- Pipeline route coincided with western coastal
highway. Due to space constraints pipe was laid
in roadbed - ARMCG installed approximately 26,000 linear feet
of US manufactured ductile iron pipeline
Pipeline trench narrow roadway
8Water Pipeline Project Information
Graphic depicting hydraulic model of Grenada
pipeline
- Pipeline route on western portion of island
9U.S. Manufactured Ductile Iron Pipe (financed by
EXIM Bank)
10Benefits of US Export Import Bank Financing to
ARMCG
- Provides ARMCG with complete package approach
- Accessible funding that can be obtained
relatively quickly - Environmental projects benefit from increased
local content coverage and longer terms
11Development of Grenada Waterline Project Financing
- Client needed 100 financing for project
- Initial discussions with EXIM Banks Business
Development Division - Provided detailed information on how to proceed
- Provided information needed for selection of
commercial bank in Atlanta area with experience
in EXIM funding
12Development of Grenada Waterline Project Financing
- Provided support throughout process
- Identified EXIM insurance program as best fit
for Grenada project - Continued contact during project
- Discussions with Grenada officials
- Educate government on export financing
- Negotiations on cost/scope of work
- Address concerns of government regarding terms of
loan vs. concessionary financing
13Export Project Challenges Encountered by ARMCG
- Balancing financing requirements vs. local
content desires and political issues - Local political pressure to employ local workers
and/or use local materials is at odds with
government desire for maximum financing - Environmental projects may require significant
local content - Macro political/economic changes in country
14Example Projects Projects in Venezuela
- ARMCG providing engineering evaluation and
conceptual design services for overall
water/wastewater systems on Margarita Island - Evaluation services are funded by the United
States Trade Development Agency (USTDA)
majority of implementation funding was envisioned
to be through EXIM at beginning of project - Implementation funding difficulties developed due
to Venezuela political/economic situation (EXIM
currently closed)
15Example Projects Projects in Venezuela
- Cargo handling equipment financing for private
company transaction was approved by EXIM - Currency controls were initiated by Chavez before
loan closing - Controls severely impacted borrowers ability to
repay loan in dollars transaction was
terminated
16Export Project Challenges Encountered by ARMCG
- Shipment, customs, local transport
- Difficulties between customs officials
government - Financing Requirements
- Export funding oriented more toward products and
not services adjustments are required
17Example of non-environmental project Roman
Catholic School in Grenada
- Financed through EXIM Bank and private export
funding sources - Designed Constructed by ARMCG
- Non-environmental project required more
supplemental financing to achieve 100 funding
18Roman Catholic School Project in Grenada
US manufactured precast concrete components were
used to maximize US content
School survived Hurricane Ivans 130 mph winds
with no structural damage (design wind speed 140
mph)
19Example of Services-Only Project Cement
Manufacturing Facility Engineering/Feasibility
Study in Nigeria
- ARMCG working in association with Renaissance
Management Group - EXIM financed project through private Nigerian
bank Intercontinental Bank, Plc - Study end-user is Benue State government in
Nigeria - Short term financing for services (First Phase)
- Intent for implementation (Second Phase) will be
to maximize EXIM financing for equipment and
other US content as complement to equity
investment
20Presentation Summary
- EXIM Bank financing is appropriate for a wide
range of projects/transactions - Environmental projects/transactions are given
preferential terms and conditions - EXIM Bank programs are accessible and beneficial
for small businesses and new exporters - ARMCG has received substantial benefits from
using EXIM Banks programs and considers EXIM an
essential resource for the companys
international business strategy