1
A Solution to Remote Detection of Illegal
Electricity Usage via Power Line Communications
2
CONTENT
  • Introduction to PLC
  • Idea about AMR
  • Methods of illegal usage of Electricity
  • The detection system
  • System REVIEW
  • References

3
INTRODUCTION
  • Power Line Communication (PLC) is the technique
    in
  • which the communication is takes place over the
    same line that deliver electricity.
  • In this technique, a high frequency carrier is
    injected onto the power line.
  • The data to be sent is modulated with the
    injected carrier.
  • It has a wide range of application
    possibilities. Automatic Meter Reading (AMR) is
    an important among all.

4
Automatic Meter Reading (AMR)
  • AMR a very useful application of PLC.
  • This provides remote recording of usage of
    electricity of an user.
  • The reading of the Meter is translated into
    digital form in order to send the metering data
    from the user to a Base station.

5
(No Transcript)
6
  • The Digital metering data is send to the Base
    station using PLC modems.
  • The Base station unit consists of
    Modems,Receivers, Data Concentrators,
    Controller,Host upload link, and Host Computer.

7
(No Transcript)
8
Methods of illegal usage of electricity
  • Using Mechanical Objects
  • Using a fixed Magnet
  • Using external phase before the meter
  • Switching the energy cable at meter connector
    box

9
The Detection Control System
10
The Detection Control System
  • In order to detect illegal usage of electricity,
    a PLC modem and an energy meter chip for every
    subscriber are added to an existing AMR system.
  • The detector PLC s and energy meters is placed
    at the connection point between distribution main
    lines and subscribers line.
  • The recorded data in kilowatt-hour meters for
    every subscriber are sent to host PLC modem via
    PLC modems, which is placed in subscribers
    locations.
  • On the other hand, energy meter chips reads the
    energy in kilowatt-hours and also send the data
    to host PLC unit

11
(No Transcript)
12
  • THANK YOU
  • ?