Title: SMS INFRASTRUCTURE LTD (Previously known as ShaktiKumar M. Sancheti Ltd.)
1SMS INFRASTRUCTURE LTD(Previously known as
ShaktiKumar M. Sancheti Ltd.)
- Regd Office
- 267, Ganesh Phadnavis Bhavan, Near Triangular
Park, Dharampeth, Nagpur 440010 (India)
Telephone 91-712-2525410Fax
91-712-2544039Email sanbros_ngp_at_sancharnet.in - website www.smsl.co.in
2About Us
- SMS Infrastructure Ltd is one of Indias leading
company in the core Infrastructure sector with
its foray into Highways, Dams, Tunnels, Power,
Mining, Urban Infrastructure, Irrigation, etc. It
has also forayed into the emerging sectors of
Highway Management, Toll ways, Rail linking
Projects, Construction of Hydropower Projects,
Hazardous Treatment, Buildings/ Housing Projects,
etc.. - SMSL has an unblemished track record of Technical
and Engineering capability. - An integrated project execution adherence to
time schedule thus establishing its significant
status in almost all sectors of its activities. - An unblemished track record of quality since last
43 years of its existence. - The company has been catering to a highly
impressive list of CLIENTS
3About Us
- CENTRAL INDIAS LARGEST INFRASTRUCTURE COMPANY
- CLOSELY HELD PROFESSIONALLY MANAGED COMPANY
- COMMITTED DEDICATED WORK FORCE OF 2,600
PERSONNEL - REVENUE FOR THE YEAR ENDED 31ST MARCH, 2005
- Rs. 184.75 CRORES.
- COMPANY FIGURES IN THE LIST OF FIRST 500 UNLISTED
COMPANIES OF INDIA, LIMCA BOOK OF RECORDS ETC. - SEVERAL NATIONAL AWARDS IN ITS FIELD OF WORKS
4The Team
- The Company is headed by first Generation
entrepreneur Shri Shaktikumar M Sancheti who is
in this field for more than 45 years. - Qualified and Professional Management.
- Corporate Governance parameters being adhered to.
- Employee Attrition rate of less than 1
- Social upliftment policies being adopted
- Joint Venture with various stalwarts in the
industry
5Sectors of Working
- Power
- Irrigation
- Highways
- Railways
- Environment
- Mining
- Urban Rural Development
- Public-Private Participation projects
6Power Sector
-
- It is proposed to add 14,393 MW capacity from
hydro in the total capacity addition of 41,110 MW
during the tenth plan period. - Source www.planningcommission.nic.in
7Power Sector (contd)
- The company has been executing various works for
Thermal Power Plants, Hydro, Oil Gas based
Power Plants. - The company is also actively advancing its
presence in transmission and Distribution sector. -
- The company is also in the business of
identification of areas where hydro power plants
can be set up.
8Power Sector (contd)
The various activities carried out by the
company in these areas are
- Generation
- Thermal Power Plants
- - Survey, Identification, Layout Land
Development of entire power plant - - Civil works facilitating the erection
commissioning of Heavy - Machinery, Coal Handling plant, Wagon Tripler,
Track Hopper - Conveyor foundation
- - Civil work for Boiler, Turbine, Bunker
foundations, Chimney etc. - - Civil works for R.W. C.W. Pump Houses
- - Construction Raising of Ash pond/Ash
Bund/Ash Dyke - - Civil Mechanical work for Ash Disposal,
Water Supply, etc. including - Pipeline, Structures etc.
- - Construction of ETP, WTP and recycling system,
Ozonisation etc. - - Construction of staff quarters other
amenities.
9Power Sector (contd)
- 2. Hydro Power Plant
- Construction of Inter adit Tunnel to pressure
shaft, Ventilation Tunnel, Tail rase channel,
Pressure shaft, Transformer hall, machine hall,
Lower adit Tunnel to pressure shaft, Underground
Power House, Supply and laying of Turbines,
Fabrication, and Erection of Towers with
Stringing of 220/400 KV Transmission Lines and
all kinds of Civil and Mechanical work for Hydro
Power Projects.
10Power Sector (contd)
- Transmission Distribution
- Transmission lines
- Turnkey works of Fabrication, Erection and
Construction of Towers with Stringing of 220/400
KV Transmission Lines and commissioning. - Substation
- Construction of sub station buildings, civil
works for foundations, supply and installation of
transformer, Circuit breaker, CT, PT, Isolator,
Jumper, Hardware, Gantry, Lightning arrester,
battery charger, remote control panel. - 3. Operation, Maintenance Running of High
capacity DG sets.
11Irrigation Sector
- During the 10th Plan period, the States have
projected creation of an additional irrigation
potential (major, medium and minor) of 16.743
m.ha. with an outlay of Rs. 84,734.64 crore. - Source www.planningcommission.nic.in
- The Indian Scheduled Commercial Banks are under
an obligation to lend at least 40 of their
aggregate loans to the priority sectors and
within the overall target for priority sector at
40,these banks have to observe a target of 18
for agriculture sub-sector. - Source Budget 2004-05
- The company sees immense potential in this field
once the interlinking of river starts. The
company has entered into joint venture for
execution of these types of projects outside the
country also. -
12Irrigation Sector (contd)
-
- - To its distinction, the company has
constructed Rs. - 100 crore Turnkey Masonry Dam.
- - The co. has executed several minor major
earthen - dams and spillways several lift
irrigation schemes. - - The company has constructed several hundred
- Kilometers of canals both lined unlined.
- - The company has executed largest number of
irrigation - tunnels in Central India used for diversion
of water.
13Irrigation Sector (contd)
- Dams Reservoirs Spillways
- The company has successful track record of
executing all types of dams ie Concrete, Masonry,
Earthen, Rockfill dam etc. along with the
spillway. - In this category the company executes following
work - Concrete/ Masonry Spillway including Inspection
Gallery, Overflow section, Non Overflow section,
Stilling basin, Concrete Apron, Cut Of Trench,
Buried Channel, Pier, Anchoring, Drilling
Grouting, Masonry, Colgrout Masonry, Concreting
including reinforcement, gauge filling etc.
14Irrigation Sector (contd)
- 2. Earthen Dams including Hearting, Casing,
Embankment, Excavation, Hard Rock Excavation,
Protection work, Inspection Roads, Overflow
section, etc. - 3. Turnkey execution of storage reservoir of
large magnitude, - 4. Approach Channel, Tail Channel, Inlet Channel
Power Outlet. - 5. All types of excavation Embankment, Hard
rock ex near habitation etc. - 6. The company has bagged several awards in the
field of Quality Safety in this Category.
15Irrigation Sector (contd)
- Tunnels
- The company is executing different size, shape
Long tunnels for facilitating supply of water in
Hilly areas. - The company is capable of executing following
works - - Drawing Design including planning geological
- survey including Strata Classification
- - Entry Exit Channel,
- - Portal development
- - Underground excavation with conventional
method - - Lining of tunnels,
16Irrigation Sector (contd)
- - Shotcrete (wet dry) using wire mesh Fiber
Reinforcement, - - Wedging,
- - Drilling Rock Bolting with Cement Capsule
resin injection, - - Cut Cover,Structural work including lagging,
- - Roof Protection,
- - Formation of Bunds to create stilling basin at
Off take - regulator.
17Irrigation Sector (contd)
-
- Lift Irrigation Scheme
- The company has successfully executed is
capable of executing following works - Civil Works for Pump House including Forebay,
Excavation, Embankment, Concreting, Drilling
Grouting, - Intake well, Jack Well,
- Fabrication, Erection of Large Small Dia
Pipeline, - Erection of Overhead Gantry, EOT Crane
- Switch Yard room Pump Foundation,
- Canals Over Head Reservoirs,
18Irrigation Sector (contd)
- Canals
- Construction of Canals including Hearting,
Casing, HDPE Lining, - Concrete lining (Mechanical Manual) including
sides Bottom, Pitching, Aqueducts, Structures,
Head Regulator, Cross Regulator, Distribution
System etc. - Fabrication, Erection Installation of Gates.
- Construction of piers, Fabrication, Erection of
Gantry structure, Radial Gates, Auto tilting
gates, EOT, Gate opening Valves, Embedment,
Guiding Channels etc.
19Transportation Sector
- Roads
- Bridges
- Railway Lines
- Tunnels
- Flyovers
20Road Sector
A Committee on Infrastructure headed by the
Honble Prime Minister has proposed a massive
infrastructure development programme for the next
7 years The programme envisages an investment
of Rs.1,72,000 crore on following developmental
projects (i) Completion of GQ and EW-NS
corridors (ii) 4-laning of 10,000 km under
NHDP Phase-III (iii) 2-laning with paved
shoulders of 20,000 km of National Highways
under NHDP Phase-IV (iv) Augmenting
highways in North East under Special Accelerated
Programme
21Road Sector (contd)
(v) 6-laning of selected stretches of National
Highways under NHDP Phase-V (vi)
Development of 1000 km of expressways under NHDP
Phase - VI (vii) Construction of ring roads,
flyovers and bypasses on selected
stretches under NHDP Phase-VII. Source
http//morth.nic.in (Ministry of Road Transport
Highway)
22Road Sector (contd)
- The company is capable of executing Road work of
National Highways and expressway of any length
including works of 2/4 Laning New Alignments, 4/6
Laning of existing highways,Construction of
bypasses, Service roads, Hill roads etc. - Detailing
- - Survey, drawing, design.with site
investigation, sub-soil exploration and
testing of the geo-material. - - preparation of detailed project report with
the estimation, - - Approval from Railways
- - Setting out.
- 2. Construction work
- - Formation work includes Earthwork in
excavation and embankment - - Subgrade with Murrum blanketing
- - Mining, cursing, supplying of metals.
23Road Sector (contd)
- Apart from this the company execute specialized
works in this area like - Soil stabilisation using Geosyntehic,
- Mechanical Stabilition
- Lime stabilisation
- Bitumen Stabilisation
- Cement treated granular subbase,
- Bituminous concrete using Lime,
- Crumbed rubber mix bituminous concrete,
- Modified bitumen concrete.
24Construction of Bridges
- The company is capable of executing such works
for 2/4 Lane new alignment, Construction of 4/6
Laning of existing highways, Construction of
bypasses, Service roads, Hill roads including
Construction of any size and weight of Major
river Bridges, flyovers, Road over bridges,Road
under bridges,Rail over bridges, Minor bridges,
C.D.works,Bailey bridges,steel bridges. -
- For execution of the above, the Company carries
out the following activities -
- Detailing
- - Survey, drawing, design.with site
investigation, sub-soil exploration - and testing of the geo-material.
- - Preparation of detailed project report with
the estimation, - - Approval from Department
- - Setting out.
25Construction of Bridges (Contd)
- Construction work
- - Formation work includes Earthwork in
excavation and embankment. - - The company is capable of executing the Major
river bridges with - shallow foundation, deep foundation like
Raft, cast-in situ Concrete - Driven Bored piles ,sheet piles,under
reamed piles, Well sinking - Box caisson,open caissons, Heavy well,
well sinking and coffer dam. - - The substructure including Construction of
Hallow piers, solid piers - and abutments using slip form shuttering
with continues pouring at - any height.
- - Pier caps with different shapes and size
26Construction of Bridges (Contd)
- Super structures including different types of
pre-cast, pre-stressed, pre-tensioned and
post-tensioned cast-in situ type Girders namely
box girder,I shape girder, Box diaphragm type
girder,Segmental girder, Solid Deck Slab, Voided
slab, RCC Crash barrier,railings and mastic
concrete. - Also the company specializes in launching of
girder of any size and length at any height.
27Railway Over Bridge/Under Bridge
The company is capable of executing the
following work in this category Detailing -
Survey, drawing, design.with site investigation,
sub-soil exploration and testing
of the geo-material. - preparation of detailed
project report with the estimation, - Approval
from Railways - setting out. Construction of
ROB/ RUB of any length and any size with shallow
and deep foundation like Raft, cast-in situ
Concrete Driven Bored piles ,sheet piles,under
reamed piles, Well sinking Box caisson,open
caissons, Heavy well, well sinking and coffer dam.
28Railway Line
- The total arrears of track renewal at the
beginning of the Tenth Plan 2002-07 and including
those arising during the Tenth Plan would be
34,990 km. - Indian Railways is taking up construction of new
lines under cost-sharing arrangement and through
the SPV route in association with the State
Governments. - Source www.planningcommission.nic.in
-
- As against 662 km. of new lines completed in the
Ninth Plan, a total of 1310 km of new lines are
expected to be completed during the Tenth Plan
period which will give connectivity to some
mineral rich areas, ports and strategic areas. - The thrust would be on completing the works that
provide connectivity to ports/industry and those
projects which enhance the capacity of saturated
sections and remove bottlenecks in the movement
of traffic. A total of 2365 km. of gauge
conversion is planned during the Tenth Plan
period as against 2103 km. converted to broad
gauge during the Ninth Plan period.
29Railway Line
- Annual Plan 2005-06
- Plan outlay Rs 15,349 cr, consisting of Rs
7230.81 cr from General Exchequer (including Rs
2699 cr from SRSF and Rs 710.81 from Central Road
Fund). Rs 4718.19 cr from internal resources Rs
3400 cr through market borrowings. - In addition, Railways allowed access to extra
budgetary resources to the extent of Rs. 3000 cr
for financially viable schemes on a projectised
basis. - Thrust on throughput enhancement works, safety
and development. - Additional funds to the tune of Rs. 1365 cr for
national projects in JK/NE Region and Rs. 358 cr
for RVNL works to be released during the course
of the year. - Appropriation to Development Fund raised
significantly for making available adequate funds
for throughput enhancement works including
traffic facility works. -
30Railway Line
- Projects
- Achievements of current year and targets for
next year as below -
- Likely in 2004-05 Target for 2005
-
- Total BG lines to be added 1400 kms 1692
kms -
- New Lines 205 kms 219 kms.
-
- Gauge Conversion 885 kms 935 kms.
-
- Doubling 307 kms 538 kms.
- Electrification 375 kms. 450 kms.
31Railway Line
The company is capable of constructing railway
siding work of any length including 1. Detailing
- Survey, drawing, design. - preparation of
detailed project report with the estimation, -
Approval from Railways - setting
out. 2. Construction work - Formation includes
Earthwork in excavation and embankment -
Subgrade with Murrum blanketing - Mining,
cursing, supplying and laying of Ballast, -
Supply and laying of RCC Sleepers, Rails,
turnouts,Pont and crossing, Track fittings
and Fastening, track welding.
32Railway Line (Contd)
-
- - Signaling and telecommunication work
- Preparation of drawing and design of overhead
- equipment and switching stations.
- Fabrication, supply and erection of Traction
mast/OHE, - guy rod.
- - Supply and erection of overhead equipment
- Supply and erection of contact wire, Catenary's
wire, - earth wire, copper cross feeder
- - Substation for transformers,
- - Railway station building and platforms,
- - Maintenance yard .
- - Loco shed, High mast , Overhead tanks,Pit line,
- - Level crossing
33Tunnels
-
- The company is capable of executing any type and
any size tunnels used for roadway,railways and
micro tunneling work. - The work includes the following
- - GPS survey,
- - Location of entry and exit point and
ventilation shaft - - Construction of Portals and Gabion structures
- - Cut cover
- - Earthwork in excavation with conventional
method of drilling and - blasting special technique inducting
Road header technology. - - Design of blasting pattern and selection of
blasting material. - - Drilling of Probe-holes
- - Design, fabrication and erection of steel
supports - - Design, Fabrication and fixing of rock bolts
including drilling and - fixing with resin and cement capsules.
34Tunnels (Contd)
- - Shotcreting (wet dry) with Robotic arm by
cement slurry using - wire mesh, Fiber Reinforcement.
- - Interconnections
- - Tunnel lining with pre-cast RCC Lagging
including - - bolder packing
- - Supply and installation commissioning of
Tunnel Ventilation and - Monitoring System,
- - Internal Electrical Lighting Works,
- - Integrated on-line control systems,
- - Intelligent Gas and Ambiance Monitoring
system. - - Fire fighting arrangements and pipeline
- - Dewatering
- - Construction of Rigid pavement
- - Railing, Service ducks
35Flyovers
The company is capable of executing the
following work in this category Detailing -
Survey, drawing, design.with site investigation,
sub-soil exploration and testing
of the geo-material. - preparation of detailed
project report with the estimation, - Approval
from Department - setting out. Construction
work - Formation includes Earthwork in
excavation and embankment -
Subgrade with Murrum blanketing
36Flyovers (contd)
Construction Flyover and viaducts of any length
and any size with shallow and deep foundation
like Raft, cast-in situ Concrete Driven Bored
piles ,sheet piles,under reamed piles, Well
sinking Box caisson,open caissons, Heavy well,
well sinking and coffer dam. The substructure
including Construction of Hallow piers, solid
piers and abutments using slip form shuttering
with continues pouring at any height, Reinforced
earth retaining structures with non woven
geosynthetic and steel fiber.
37Railway Over Bridge/Under Bridge
The company is capable of executing the
following work in this category Detailing -
Survey, drawing, design.with site investigation,
sub-soil exploration and testing
of the geo-material. - preparation of detailed
project report with the estimation, - Approval
from Railways - setting out. Construction of
ROB/ RUB of any length and any size with shallow
and deep foundation like Raft, cast-in situ
Concrete Driven Bored piles ,sheet piles,under
reamed piles, Well sinking Box caisson,open
caissons, Heavy well, well sinking and coffer dam.
38Railway Over Bridge/Under Bridge
- The substructure including Construction of
Hallow piers, solid piers and abutments using
slip form shuttering with continues pouring at
any height, Reinforced earth retaining structures
with non woven geosynthetic and steel fiber. -
- Super structures including different types of
pre-cast, pre-stressed, pre-tensioned and post
tensioned cast-in situ type Girders namely box
girder, I shape girder, Steel girder, Solid Deck
Slab, Voided slab, RCC Crash barrier, railings. -
- Supply and laying of RCC Sleepers, Rails,
turnouts, Point and crossing, Track fittings and
Fastening, track welding - Also the company have the specialty in launching
of girder of any size and length at any height.
39Mining Sector
- An outlay of Rs. 9458 crore has been allocated
for the Tenth Plan of which Rs 8187 crore is to
be financed through IEBR and remaining Rs 1271
crore will be the gross budgetary support. - TENTH PLAN STRATEGY
- Tenth Plan objective of faster development of an
internationally competitive mining sector must
revolve around cost-effective mineral exploration
and development with the state-of-the-art
exploration technologies through promoting
private investment in both mineral exploration
and creating new mining capacities. - The GSI and the State Directorates of Geology
and Mining will have to continue working for the
assessment and augmentation of mineral - resources, particularly for the generation of
basic geological data, understanding the process
of ore genesis, regional surveys, specialised and
focused geological studies, etc. including search
for minerals in the off-shore areas, continental
shelf and maritime - zone. At the same time, private sector
investment, including FDI, will have to be
encouraged for detailed exploration.
40Mining Sector
- Underground mining work for Coal, Manganese,
Bauxite - Open Cast mining work for Coal, Manganese,
Bauxite, Iron Ore - Turnkey construction of Long Drifts
- Construction Sinking of Deep Shafts Erection,
Fabrication Installation of Head gear - Equipping of Men Material Handling Shafts on
Turnkey Basis - Open cutting of Inclines Over Burden Removal of
Open cast Mines - Coal Transportation
41Environment Sector
- The Ministry of Environment and Forests has set
deadlines for cities to establish suitable waste
processing, disposal and landfill facilities.
Municipalities across the country are in the
process of privatizing different aspects of solid
waste management to reduce the cost incurred in
providing these services and to improve the
overall efficiency. Waste-to-energy projects have
been initiated with different arrangements for
setting up and operating these facilities
involving the private sector and local bodies. - Private sector participation (PSP) in solid waste
management offers several advantages, the first
of which is cost saving, closely related to
improvement in efficiency and effectiveness of
services. PSP also encourages new technologies
and reduces establishment costs. In India, the
cities of Navi Mumbai, Hyderabad, Surat and
Rajkot have experimented with PSP in various
aspects of SWM with encouraging results (TCGI and
PADCO, 2001).
42Environment Sector
- Common Effluent Treatment Plants (CETPs)
- Objectives
- The Ministry has undertaken a Centrally
Sponsored Scheme for enabling the small scale
industries (SSI) to set-up Common Effluent
Treatment Plants (CETP) in the country. The SSIs
are polluting the environment through their
effluents but some of them are unable to afford
installation of - pollution control equipment. In order to
encourage use of new technologies for CETPs for
existing SSI clusters of units a scheme for
financial assistance has been formulated. This
promotional scheme is being instituted and will
be implemented during the Tenth Five Year Plan. - Criteria for Consideration for Assistance
- i) CETPs in industrial estates or in a cluster
of Small Scale Industrial units - are encouraged.
- ii) Central Assistance will be available only
for clusters of SSIs. - iii) Projects for assistance will be prioritised
on the basis of - Toxicity of pollutants
- Pollution load being generated and to be treated
and - Number of units covered
43Environment Sector
iv) The CETPs are to be set up and managed by the
State Industrial Infrastructure
Corporation (by whatever name known) or through
an appropriate institution including a
cooperative body of the concerned units as
may be decided by the State Governments/SPCBs
concerned. v) The project should be
self-supporting for repayment of the loan and
meeting operation and maintenance costs. vi) The
project must formulate adequate institutional
arrangements for cost sharing, recovery of
dues and management and ensure observance of
prescribed standards. vii) The scheme must have
the technical recommendation of the State
Pollution Control Boards. viii)The CETP project
should have the conveyance system from the
individual units to the CETP.
44Environment Sector
- ix) Sludge characteristics (i.e. hazardous Vs.
non-hazardous) from the - primary and secondary treatment of the CETP
should be estimated. - Therefore, the CETP should have a sludge
management plan which - should be prepared based on the sludge
characterisation and be - documented in the feasibility report of the
CETP project. - x) Possibility of recycling/reusing the treated
effluent from the CETPs by the member units
should be explored and be documented in the
feasibility report of the CETP project. - xi) An environmental management and monitoring
plan/programme to be prepared for the CETP and be
documented in the feasibility report of the CETP
project. - xii) A legal agreement between the CETP Co. and
its member units to be executed be reflected in
the feasibility report of the CETP project. - xiii) The cost recovery formula developed for the
CETP project should be ratified by all members
and be documented in the feasibility report of
the CETP project.
45Environment Sector
- Modern technological development have multiplied
the hazards to which human beings are exposed. - The company is executing following types of
projects - Ash Pond
- Common Effluent Treatment Plant (CETP)
- Hazardous Waste Treatment Sewage Disposal
Facility (HWTSDF) - Bio Medical Waste
46Ash Ponds
- The company has successful track record of
executing such non-overflow dams called as
Earthen bunds or ash ponds. - In this category the company executes following
work - Non Overflow section, Cut Of Trench, Earthwork in
Hearting and Casing, - Rock toe,
- Filter, Slope protection
- Construction of Service Road
47Common Effluent Treatment Plant (CEPT)
- The company is capable of executing the
construction of CETP including - Design of conventional Biological Treatment
Facilities and Industrial waste Treatment
facilities. - Construction of
- - Bar Screens
- - Grit Chamber
- - Primary Sedimentation Tank
- - Secondary settling tank
- - Flocculator
- - Sludge drying bed
- - Filters
- - Supply and installation of pumps and Motors
- - Supply and laying of pipe lines
48Hazardous Waste Treatment Sewage Disposal
Facility (HWTSDF)
- The company is capable of executing the
Develop,Construction, operation and maintenance
of Hazardous Waste Treatment Sewage Disposal
Facility. The work undertaken is as the follows - - Establishment of the Hazardous Waste Treatment
Sewage - Disposal Facility
- - Design Construction of Land fill section
with Leachate control - system including the entry gate, time
office ware house, pre - treatment area, work shop, Laboratory
Provision of storm water - drains.
- - Creation and development of Green belt.
- - Supply and installation of Incinerator
plant for burning of Hazardous - Waste
- - Receiving and Transportation of hazardous
waste from Generators - facility to the HWTSDF
-
49Hazardous Waste Treatment Sewage Disposal
Facility (HWTSDF) (contd)
- - Carrying out segregation, Recovery, Treatment,
Storage - and Disposal including Land fill of hazardous
waste - residues.
- - Establishment and operation of a waste Heat
recovery - steam generation unit
- - Transportation of residue / rejects generated
to Land fill - area.
- - The whole system comprise of
- i) Collection of hazardous waste
- ii) Transportation of hazardous wastes
50Bio Medical Waste
- The company is capable of executing the Design,
Finance, Construction, Operation and Maintenance
of Biomedical Waste its Treatment, Storage and
Disposal facility plants. The work involves the
following - Construction of fencing and development of green
belt - Actualisation and installation of weighing
machine - Construction of building and workshops
- Construction of internal roads.
- Construction of disinfection room,
- Supply and commissioning of Autoclaving,
- Supply and commissioning of Shredding equipment.
- Supply and commissioning of Incinerator
- Construction of land fill section.
51Operation Maintenance of Toll Roads
- The company is capable of executing the work of
operation and maintenance of Toll Roads. The
detailed response to the technical requirement of
the project is as under - Road Maintenance - this includes emergency
routine disaster maintenance and inspection - Traffic Management incident management
enforcement of regulations together with the
relevant authorities hazard response
information gathering and dissemination road
patrols and surveillance - Safety accident prevention after care user
behavior education enforcement data collection
and analysis,
52Operation Maintenance of Toll Roads(contd)
- Facility management including periodic
inspection, routine maintenance, rehabilitation
and expansion planning - Road property management management of access,
encroachment and ribbon development - Toll fee collection provision of the
appropriate equipment and system revenue
collection, administration and auditing - General responsibilities including budgeting,
compliance with legal and accounting
requirements, and public relations - Planning of Operations and Maintenance Centre
including the basic planning, comment on the
details design, and design co-ordination. - Training of appointed official in various aspects
of OM management, administration and technical
proficiency.
53Joint Ventures / Technical Collaboration
- SMSL has signed MOUs, Entered into Joint Venture
/ Technical Collaboration in different sectors
with following National and International
Companies - Power
- 1) Altai Technology Corporation Ltd
Gidroenergostory TPM - Company has entered into Joint Venture Agreement
for preparing, pre-qualification and tender offer
for executing for Turn-key execution of Tipaimukh
Hydro Electric (Multipurpose) project ( 6 x 250
MW ), Manipur. Cost of the project is Rs. 1100
Crs. - CETHAR J.V.
- Company has entered into Joint Venture Agreement
with M/s. CETHAR VESSEL for preparing
pre-qualification for Roll of Contractor for the
Group Captive Power Project Tarapur, Ranjangoan,
Hinjewadi, Ambarnath-Badlapur floated by MIDC
Mumbai.
54Joint Ventures / Technical Collaboration(Contd)
- M/S. WAT-ERE-SOURCE TECHNOLOGIES PVT. LTD., PUNE
- - SMSL has entered into Joint Venture Agreement
with M/s. Wat-Ere-Source Technologies Pvt. Ltd.,
Pune for preparing pre-qualification and tender
offer for- - HYDRO ELECTRIC PROJECTS
- 1 PENCH KAMPTEE R.B.CTA. PARSHIWA NI, DIST.
- NAGPUR 2X0.7 MW TOTAL 1.4 MW, AND
- 2 PENCH KAMPTEE L.B.C. TA. PARSHIWA NI, DIST.
- NAGPUR 2X2.20 MW TOTAL 4.40 MW
- Floated by The Superintending Engineer and
Administrator, Command Area Development Authority
Ajni, Nagpur-440 003
55Joint Ventures / Technical Collaboration(Contd)
- Highways
- ASCON AS-KA J.V. -
- ASCON is construction arm of ETA Group, Dubai.
ETA Group is having presence in Core Sectors like
Multi Storied Buildings, Shopping Malls,
International Trading, Shipping, etc. having
group turnover of approx. US 550.00 Million. - ASKA Construction Company is mainly into
Infrastructure Projects viz. Construction of
Dams, Tunnels, Highways, Hi-Tech Buildings and
Hotel Construction having their registered
office at Turkey. - SMSL has tied-up with ASCON - AS-KA J.V. for
Hydro-Power Projects, Highway Construction,
Thermal Power Projects, Bridges, Tunnels, etc.
56Joint Ventures / Technical Collaboration(Contd)
- BJCL -
- Company has entered into Joint Venture Agreement
for preparing, pre-qualification and tender offer
for executing various National Highways projects.
- GDC J.V. -
- Company has entered into Joint Venture Agreement
with M/s. GANNON DUNKERLEY COMPANY LTD. for
preparing tender offer Four Laning
Strengthening of the existing Two Lane
Carriageway from Km.387.1 to Km.407.1 OF nh-1
Jalandhar to Amritsar Section floated by
National Highways Authority of India, New Delhi. - ETA. -
- Company has entered into Joint Venture Agreement
with M/s. ETA for preparing tender offer for BOT
Projects for the projects floated by National
Highways Authority of India, New Delhi.
57Joint Ventures / Technical Collaboration(Contd)
- Railways
- LINGKARAN SHENGHAI TUNNEL ENGINEERING CO. LTD
- - Company has entered into Joint Venture Agreement
with M/s. LINGKARAN. Malayasiya, and SHENGHAI
TUNNEL ENGINEERING CO. LTD Chinna for preparing
and pre-qualification and tender offer for
Proposal For Versoa Andheri Ghatkopar Mrts
Project floated by Mumbai Metropolitan Region
Development Authority MMRDA, Mumbai.
58Joint Ventures / Technical Collaboration(Contd)
- Environment
- WATERGRACE PRODUCTS.
- Company has entered into Joint Venture Agreement
for preparing, pre-qualification and tender offer
for executing various Bio-Medical Projects
floated by various Govt. agencies. JV has bagged
one similar nature of prestigious project for
Design, Finance, Construction, Operation, and
Maintenance of a Biomedical Waste Treatment
Storage, disposal facility (BMWTSDF), Mumbai on
BOOT basis, for 20 years, floated by Maharashtra
Pollution Control Board, Mumbai.
59Joint Ventures / Technical Collaboration(Contd)
- PARAMOUNT J.V. -
- Company has entered into Joint Venture
Agreement with PARAMOUNT LTD. J.V. for
preparing Design, Engineering, Procurement,
Fabrication and supply of Effluent Treatment
Plant ETP and Hazardous / Chemical Waste
Incineration System for Refinery Petrochemical
and other process industries, for - - Design, Finance, Construction, Operation and
Maintenance of Hazardous Waste Treatment, Storage
and Disposal Facility (HWTSDF) at Butibori,
Nagpur. - Design, Finance, Construction, Operation and
Maintenance of Hazardous Waste Treatment, Storage
and Disposal Facility (HWTSDF) at Ranjangaon,
Pune. - Floated by Maharashtra State Industrial
Development Corporation, Mumbai.
60Joint Ventures / Technical Collaboration(Contd)
- Mining
- Deutsche Bergbau-Technik GmbH -
- Company has entered into Joint Venture Agreement
with M/s. Deutsche Bergbau-Technik GmbH to bid
for Murpar Mine of Western Coal Fields Ltd. With
DBT as lead bidder and SMSL as a Partner for
providing services. - Bharat Gold Mines Limited A GOI Undertaking
- - The PSU is currently a BIFR referred Company.
- The project and consultancy group of BGML is
doing extremely well because of its experience
thorough knowledge of Underground Mining. - Apart from the captive requirement at BGML, it
has done Underground Mining Development work for
clients like Hindustan Copper Ltd., South Eastern
Coalfields Ltd., WCL., Hindustan Zinc Ltd.,
Manganese Ore (India) Ltd., The Singareni
Collieries Co. Ltd., etc. It is the only Company
in India which is doing Underground Shaft
Equipping Work and manufacturing cages, winders,
etc.
61Joint Ventures / Technical Collaboration(Contd)
- Urban Rural Development
- UNIPUMPS NIGERIA LTD. -
- Company has entered into Joint Venture
Agreement with M/s. UNIPUMPS NIGERIA LTD. J.V.
for preparing submitting EOI for the work of
Expression of Interest EOI from Entrepreneur/
Lead Patner of J.V. of National and International
repute for Transportation of Raw Water from Pench
Dam to Mahadula to be executed on Build, Own,
Operate and Transfer BOOT Basis, floated by
Municipal Corporation, Nagpur. - Market Mission I Pvt. Ltd. J.V. -
- Company has entered into Joint Venture
Agreement with M/s. Market Mission I Pvt. Ltd..
for preparing tender offer Construction,
Operation Maintenance Of Bus Q Shelters In
Ndmc Area On Bot Basis. Package 2 South Of
Rajpath floated by New Delhi Municipal
Corporation, New Delhi.
62Joint Ventures / Technical Collaboration(Contd)
- AJECT. -
- Company has entered into Joint Venture Agreement
with M/s. AJECT, Saudi Arbia for preparing tender
offer Construction of Micro Tunnel work at
various locations of in Mumbai City floated by
Brihanmumbai Mahanagarpalika, Mumbai.
63Joint Ventures / Technical Collaboration(Contd)
- Public Private Participation projects
- PROVIRON TECHNOLOGIES B.V. -
- Company has entered into Joint Venture Agreement
with M/s. PROVIRON TECHNOLOGIES B.V. Switzerland,
for preparing and pre-qualification and tender
offer for Construction of Multi-Level Automatic
Undergrounds Car Parking System at New Delhi,
floated by Municipal Corporation of Delhi. - IRD. -
- Company awarded the work of Supplying,
Operation, Maintenance and transfer of
Electronically Operated Toll Collection System at
Vidyasagar Setu, Kolkata, floated by Hooghly
River Bridge Commissioner, Kolkata. For
executing the work the company has entered into
Joint Venture Agreement with IRD. Project Cost
Rs.100.00 Crore.
64Joint Ventures / Technical Collaboration(Contd)
- ABDUL MONEM LTD. -
- Company has entered into Joint Venture Agreement
with M/s. ABDUL MONEM LTD. for preparing
pre-qualification and tender offer
Pre-qualification and Bid for OM Project of
Toll Road, Bangladesh floated by GM Tech, The
Azad Engineers, Dhaka. - SANGAM INDIA LTD . -
- Company has entered into Joint Venture Agreement
with SANGAM INDIA LTD., for preparing tender
offer Four Laning improvements of Mumbai-Pune
section of N.H.-4 (Km. 131/200 to Km.20/400) on
self-finance along with Toll Collection
operation and operation maintenance on
Mumbai-Pune section of N.H.-4 and Existing
Mumbai-Pune Expressway. floated by Maharashtra
State Road Development Corporation Ltd., Mumbai.
65Work Done in last 5 years
Road Sector
Turnover for 2000-01 Rs. 84.46 crores
Turnover for 2001-02 Rs. 62.23 crores
Mining
Railway
Power
Irrigation
Others
Turnover for 2003-04 Rs. 176.06 crores
- Turnover for 2002-03
- Rs. 105.02 crores
Turnover for 2004-05 Rs. 177.55 crores
66Work Done in last 3 years- 2000-01
Irrigation
Mining
Power
Railway
Road
Rural Infrastructure
67Work Done in last 3 years- 2001-02
Irrigation
Mining
Power
Railway
Road
Rural Infrastructure
68Work Done in last 5 years- Consolidated
Road Sector
Mining
Railway
Power
2
10
Irrigation
Others
6
17
64
1
69Work Done in last 5 years- Consolidated
70Lists of Works in hand
71Lists of Works in hand
72Lists of Works in hand
73Works in hand Sector Wise
74 Sectoral presentation of Work in Hand
WIP
75Works Expected
76Works Expected (contd)
77 Sectoral presentation of Work to be executed in
Future
2006-07
2007-08
2008-09
2010-11
2009-10
78Graphical presentation of Works Expected
9
2
7
Roads
4
Irrigation
Mining
Environmental
Power
78
79Works Intending to Bid
80Works Intending to Bid (contd)
81Works Intending to Bid (contd)
82Ongoing Public Private Participation projects
83Ongoing Public Private Participation projects
84Equity Participation of Works under Public
Private Participation (PPP)
85Equity Participation of Works under Public
Private Participation (contd)
86Equity Participation of Works under Public
Private Participation (contd)
87Projected Financials for next 3 years
88 SMSL-BANKING HISTORY
- Bankers have always been partners in progress
with SMSL. - SMSL Had been banking with Sangli Bank till 1985
. - With the legal mandate of Nationalized banks for
issuance of bank guarantee it started banking
with State Bank of Indore as the principal
bankers from 1985. - Over the years whenever the company needed
support State bank of Indore has always given the
same which has been equally responded by the
company in form of rock solid credentials.with
financial performance upto optimum level. - Today,with fund non fund based limits exceeding
450.00 Crores from the State bank of Indore and
consortium, the company is poised for even higher
growth plans. - Majority Banking of associates of SMSL has been
with State Bank Group. Details of the same are
not included here.
89Collaterals
- The company is aggressively pursuing its growth
plans backed by expertise of over four decades
and order book position exceeding Rs.1500.00
Crore. - These are times of change and challenge as well
for the promoters are required to deploy funds
for setting up of the projects only upon which
the later execution can take place due to which
the company cannot invest more in collaterals.. - The company has requested for replacement of some
of the collaterals with fresh ones. - The sale proceeds of replaced collaterals will be
invested in the form of equity by the promoters
in the ensuing projects in the year 2007-08. - The bank is requested to allow the request
aforesaid upon which the company can be better
placed to achieve the growth plans.
90Future Plans
- Raising of Funds
- The cost of funds for established listed
companys is very less. However if the PE and
financials of companies related to our field is
taken into account, the company commands a share
price of Rs.1500.00 per share on a conservative
basis. - To capitalize on the above strengths vis a vis
reduce the financial cost, the company is
considering an IPO or private placement of equity
at an appropriate time. - The company plans to raise Rs.60.00 Crore during
FY 2006-07 on the above lines for funding
expansion plans investment in BOT Projects..
91Future Plans (contd)
- BOT PROJECTS
- With the Govt.of India initiative to tolling of
all the national highways on BOT basis these
projects are supposed to gather enormous momentum
in the coming years. - The company has been a prominent player in this
arena on account of the following projects being
dealt through a separate Special Purpose Vehicle
(SPV) . - (a) Durg By pass
- (b)Houghly River Bridge Corporation (HRBC)
- (b) RCCL infrastructre Limited.
- Recently the company has obtained/acquired
the following BOT projects, - (a)Dharamtar Toll,Raighad
- (b)Common Effulent Treatment
Plant(CETP),Butibori - Apart from the above the company is executing
following projects -
92Equity Participation of Works under Public
Private Participation (PPP)
The company has already invested in BOT projects
as under (Rs.in Crores)
93Public-Private ParticipationNHDP Projections
94FUTURE PLANS OF SMSL
- Apart from this the company is eyeing following
new areas of work - 1.RAIL and ROAD Projects for port connectivity.
- 2.Tourism Infrastructure
- 3.Drinking Water Supply Schemes
- 4.Power Plants with alternate fuel,
non_conventional, etc.. - 5.Environment Projects.
- 6.Highway Management including weighment
- 7.Computerisation and Integration of Sales Tax at
Border Check Posts. - 8.Road Projects on Swiss Challenge Method
- 9.Defense and Security Related Projects.
-
95Thank You!