Planning and Environmental Guidance - PowerPoint PPT Presentation

Loading...

PPT – Planning and Environmental Guidance PowerPoint presentation | free to download - id: 3b0050-YTFjM



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Planning and Environmental Guidance

Description:

Planning and Environmental Guidance For Airport Property Mineral Extraction Recently Published Guidance Details outlined in FAA Eastern Region Airports Division ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 15
Provided by: faaGovair
Learn more at: http://www.faa.gov
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Planning and Environmental Guidance


1
Planning and Environmental Guidance
  • For Airport Property Mineral Extraction

2
(No Transcript)
3
(No Transcript)
4
Recently Published Guidance
  • Details outlined in FAA Eastern Region Airports
    Division Sponsor Guide (Updated 11/16/10)
  • Sponsor must remain in compliance with federal
    obligations and safety requirements
  • All revenue generated by mineral extraction must
    stay on and be used for airport purposes only

5
Required Sponsor Actions
  • FAA Environmental Determination
  • Construction Safety Phasing Plan (CSPP)
  • ALP Revision

6
Required Sponsor Submittals (Contd)
  • Copy of Drilling Permits
  • Additional Information as spelled out in the
    guidance

7
FAA Environmental Determination
  • Contact your Airports District Office (ADO)
    Environmental Protection Specialist (EPS) to
    Scope
  • Environmental Assessment Required for National
    Environmental Policy Act (NEPA) Compliance
  • FAA will make a Finding/Determination

8
Keys to Obtaining Timely Environmental
Determinations
  • Early Contact with ADO Project Manager and EPS
  • Early Coordination with Resource Permitting
    Agencies is Critical

9
The Environmental Assessment
  • Based on Preliminary System Layout and Design
  • Discusses Affected Environment, Required Permits
  • Commits to Avoidance, Minimization Mitigation
    (where necessary)

10
The Environmental Finding/ Determination Process
  • Determination Likely a Finding Of No Significant
    Impact (FONSI)
  • FONSI will require Supplemental Environmental
    Analysis (as necessary) to address
    Specifics/Actual Site Development
  • Supplemental Analysis must be Consistent with EA
  • Construction will not be Authorized without FAA
    Concurrence

11
Airport Layout Plan (ALP) Update
  • Airport Sponsors obligation (Grant Assurance
    29)
  • Show all permanent above-grade improvements
  • FAA Form 7460-1 to coordinate airspace review and
    determination
  • Pen Ink Change to ALP

12
Construction Safety Phasing Plan (CSPP)
  • Safety is critical!
  • CSPP addresses all aspects of construction
  • Duration and work schedules
  • Access routes for construction equipment
  • Height of equipment and lighting / flagging
    requirements

13
Safety Concerns
  • Headlines like Cause of Western PA Gas Well Fire
    Still Unknown and Three Burned at Marcellus
    Shale Drilling Site near Avella should make you
    think about what could happen at drilling sites
  • Besides the drilling site, pipelines will be
    connecting your wells and traversing your
    property

14
Questions