About This Presentation
Transcript and Presenter's Notes

Title: GE PowerPoint Template


1
GE Consumer Industrial
Utilities and Energy Efficiency The Fifth
Fuel November 28, 2006 
2
ecomagination
  • Innovative technologies to help customers meet
    pressing environmental challenges
  • Ambitious Company-wide 1-30-30 Goal- 1 absolute
    GHG reduction by year-end 2012- 30 GHG
    intensity (CO2/ rev) reduction by Y/E 2008
    - 30 Energy intensity (Btu / rev) reduction by
    Y/E 2012
  • Challenges for Consumer Industrial- 109 plants
    and warehouses worldwide- 30 of total GE GHG
    emissions- GE heritage operations some plants
    100 years old- Energy-intensive processes

3
Re-lamping Re-motoring Initiatives
GEs family of Ultra energy savings products
reduce energy costs up to 50
GE XD Ultra motor exceeds NEMA Premium
minimum guaranteed efficiency
4
Re-lamping Results
Before
  • Year-to-date
  • 44 Facilities Completed 32 in U.S., 2 CN, 10 MX
    and PR
  • 65MM kWh/yr reduction
  • 4.2MM reduction in energy costs
  • Significantly improved illumination quality

After
  • Projected Total Benefits
  • 88MM kWh/yr reduction 54 plants
  • 5.8MM/yr energy costs
  • 64MM MT CO2/yr equivalent to reforestation of
    19,000 acres of trees
  • Significant EPAct 2006 tax deductions

5
Re-motoring
  • 23 percent of all electricity consumed in the
    United States almost 70 percent of
    manufacturing sector electricity consumption
  • Average purchase price only 2 of lifetime
    costelectricity is 98
  • 1992 EPAct last mandated minimum
    energy-efficiency standardnew one slated for
    2009
  • Per U.S. DOE, better motor system management can
    reduce motor energy costs by 18 percent and
    increase productivity, reliability

Data source Motor Decisions Matters
http//www.motorsmatter.org/press/press_kit/energr
y_facts.html
6
Kentucky Glass Plant
Kentucky Glass Plant
  • 215,000 sq. ft Built in 1947
  • 13 acre site
  • 148 employees
  • Fastest ribbon machines in the World
  • 1.5 billion bulbs per year50 of GE incandescent
    glass bulbs
  • Motors info
  • 300
  • 1 200 HP
  • 50 Pre-EPAct
  • 0.04 /kWh
  • 6250 hrs/yr

7
Kentucky Glass Projected Results
  • Environmental benefits
  • 1.6 Million lbs of CO2 reduced equivalent
  • - reforestation 200 acres
  • - US households powered 107
  • Economic Payback
  • 200,000 acquisition costs
  • Energy reduction 1,163,000 kWh
  • 46,520/yr. Energy costs
  • Reliability savings

Challenges
  • Initial investment costsinstallation downtime
  • Determining existing motor efficiency
  • Local repair shop resistance