Title: http://nodal.ercot.com 1
1TPTF Update Trip Doggett
2Agenda
Item Description Purpose
1. Meeting Summary Summary of recent TPTF activities For review
2. Next Meetings Upcoming activities For review
3. Approval of Milestone Request TAC approval of Milestone Business Requirements Complete for CO Real-Time AS Settlements CO RUC Settlements CO DAM Make Whole Settlements For Vote
3Meeting Summary August 7
- Meetings August 7 8 and August 21, 22 23
- On August 7, we discussed
- Proposed changes to Principles of Consistency
Document that were proposed by joint ROS/TPTF
Task Force, including proposed definition for
Annual Planning Model. - Draft language to incorporate refined Annual
Planning Model definition in Section 3.10.2(1). - On August 7, after voting unanimously to waive
notice for the vote, TPTF approved the refined
Annual Planning Model definition in Section
3.10.2(1) by a unanimous voice vote. - On August 7, after voting unanimously to waive
notice for the vote, TPTF approved the changes to
the Principles of Consistency Document by a
unanimous voice vote. - Draft Nodal PRRs
- On August 7, TPTF approved a draft NPRR for
changes to Sections 1, 6, and 10 to address net
metering concerns in the nodal market. The draft
Nodal PRR was approved by a ballot vote of 100
in favor, with one abstention by CenterPoint
Energy. The Cooperative and Independent
Generator segments were not present. This draft
NPRR will be sent to PRS.
4Meeting Summary August 7 (continued)
- On August 7, we discussed
- Draft Nodal PRRs
- Discussed a proposed NPRR from the ERCOT
Modeling Group to clarify required tests of the
Network Model. - ERCOT agreed to meet with individuals having
concerns with the document, offline, and
circulate an updated version of the NPRR for
consideration at our next meeting. - ERCOT protocol clarifications
- Discussed the treatment of block Offers in the
Market Management System and ERCOT agreed to
discuss the possibility of Relaxed Mixed Integer
Programming with the vendor. - Reviewed the words in 4.4.2.2(3) and agreed the
words should be revised to say QSE trades should
be posted in the MIS Certified Area, not the MIS
Secure Area. ERCOT will prepare a draft NPRR to
correct. - Discussed whether ERCOT is expected to notify
QSEs if their Base Point is based on a mitigated
Offer. Agreed this is not a requirement.
5Meeting Summary August 7 (continued)
- On August 7, we discussed
- ERCOT protocol clarifications
- Discussed Combined Cycle power augmentation
methods in 6.5.5.2(9) and recommended ERCOT
discuss with Randy Jones before returning
decisions to TPTF - Discussed the use of Generic Cost of energy in
RUC, 5.5.2(4) versus the use of Energy Offer
Curves. ERCOT will bring a draft NPRR for TPTF
consideration. - ERCOT asked if an Energy Offer Curve should be
mandatory for RUC committed units. ERCOT will
study further before bringing a NPRR to TPTF - Discussed the use of telemetered ramp rate,
versus ramp rate provided through registration,
in SCED. ERCOT will research further and bring a
recommendation to TPTF. - Discussed whether a unit committed in DAM should
be required to show the unit ON in their COP
before RUC execution.
6Meeting Summary August 8
- On August 8, we discussed
- Draft Nodal PRR
- Discussed how to settle CRRs when the DAM fails
to execute. Provided direction to ERCOT to draft
a NPRR using no deration. - Discussed options for CRR block sizes.
- Reviewed draft NPRR for Section 16.8.1 to
prohibit Unbundled TSPs, DSPs, and ERCOT
employees from owning CRRs - On August 8, approved changes to Section 16.8.1
to prohibit Unbundled TSPs, DSPs, and ERCOT
employees from owning CRRs by a unanimous voice
vote. - Reviewed formatting changes proposed by ERCOT
Market Rules for Section 8.1.2.2.1
7Meeting Summary August 8 (continued)
- On August 8, we discussed
- Changes proposed by ERCOT Market Rules for
Section 8.1.2.2.1 - Commercial Operations Business Requirements
Schedule - Eligibility Scenarios for Make-Whole and RUC
- Training Update
- Initial Overview of Real-Time AS Commercial
Operations Business Requirements Document - Initial Overview of RUC Settlement Commercial
Operations Business Requirements Document - Draft Nodal PRRs
- Reviewed draft NPRR to address settlement issues
with net metering in the nodal market.
8Meeting Summary August 21
- On August 21, we discussed
- Net Metering
- Reviewed draft Net Metering NPRR with language
changes in Sections 1, 3, 6, and 10. - On August 21, TPTF approved draft Net Metering
Nodal PRR by a ballot vote of 100 in favor, with
abstentions by CenterPoint, Occidental, and
Exelon. All market segments were present. This
draft NPRR will be sent to PRS. - ERCOT discussed the association of EPS metering
points to an electrical bus and concluded no
additional protocol language was needed to allow
ERCOT to map these relationships. - EMS Business Requirements Review
- Initial review of State Estimator
- Initial review of Forced Outage Detection
- Initial review of Load Frequency Control
9Meeting Summary August 21 (continued)
- On August 21, we discussed
- ROS Update
- Update on ROS approval of ROS/TPTF Task Force
recommendations on Principles of Consistency
document - Approval of draft NPRR for Annual Planning Model
definition in Section 3.10.2. - On August 21, TPTF approved draft NPRR for
Annual Planning Model definition in Section
3.10.2 by a unanimous voice vote. This draft NPRR
will be sent to PRS. - Discussed ROS comments on Section 5.5.1(5). The
consensus of the group was to recommend using a
reference to the Operating Guides instead of
duplicating Operating Guide language in the
Protocols. - On August 21, TPTF approved comments on Section
5.5.1(5) by a ballot vote of 90 in favor, with
one negative vote by Garland and abstentions by
CenterPoint and TXU Energy. All market segments,
except Consumers, were present. These comments
will be sent to TAC.
10Meeting Summary August 22
- On August 22, we discussed
- MMS Project Issues Review
- Ancillary Service/Energy Modeling
- Block Offer Modeling and Pricing
- Submission of Bilateral Trades
- Overlapping Offers/Bids
- Hot/Intermediate/Cold Startup Offer
- Offer/Bid Validation Timeline
- Offer/Bid Expiry Time
- Market Information System
- MIS Update
- ERCOT Clarification to Section 12.3(d)
- Training Update
- Draft NPRR for CRR Settlement without DAM
11Meeting Summary August 22 (continued)
- On August 22, we discussed
- Commercial Systems Requirements Schedule
- Initial overview of Real-Time Energy Settlements
Business Requirements Document - Review of comments received on Commercial
Operations Real-Time AS Settlement Business
Requirements Document - On August 22, TPTF approved Real-Time AS
Settlement Business Requirements by a ballot vote
of 100 in favor, with abstentions by GEUS,
CenterPoint Energy, Calpine, City of Dallas,
Occidental, and Residential Consumers. All market
segments were present. - Review of comments received on Commercial
Operations RUC Settlement Business Requirements
Document - On August 22, TPTF approved RUC Settlement
Business Requirements by a ballot vote of 100 in
favor, with one abstention by CenterPoint Energy.
All market segments were present. - Review of comments received on Commercial
Operations DAM Make Whole Settlement Business
Requirements Document - On August 22, TPTF approved DAM Make Whole
Settlement Business Requirements by a ballot vote
of 100 in favor, with abstentions by CenterPoint
Energy, Occidental, and Residential Consumers.
All market segments, except cooperative, were
present.
12Meeting Summary August 22 (continued)
- On August 22, we discussed
- Draft NPRRs related to CRRS
- Draft NPRR to address hourly granularity of
bilateral trades - On August 22, TPTF approved a draft NPRR to limit
CRR trading, registered through ERCOTs CRR
system, to time-of-use blocks for any number of
days. The draft NPRR was approved by a ballot
vote of 100 in favor, with abstentions by City
of Garland and Calpine. All market segments,
except cooperative, were present. This draft NPRR
will be sent to PRS. - Draft NPRR to address ability to offer 24-hour
blocks - On August 22, TPTF approved draft NPRR to specify
that CRR awards and allocations of a one-month
strip in a 7x24 block will be split into
one-month strips of the three other blocks (5x16,
2x16, 7x8). Each of these three blocks may be
offered into subsequent CRR Auctions as separate
block offers but not as a single 7x24 block. The
draft NPRR was approved by a ballot vote of 83.3
in favor, with one negative vote by TXU Energy
and abstentions by NRG Texas, Calpine, City of
Dallas, Residential Consumers, Stream Energy,
StarTex Power, Strategic Energy, Accent Energy,
Cirro Group, and Reliant. All market segments
were present. This draft NPRR will be sent to PRS.
13Meeting Summary August 23
- On August 23, we discussed
- Nodal Program Update
- TXMAC Timeline
- On August 23, TPTF approved TXMAC Timeline as
being in compliance with the protocols by verbal
affirmation, with no abstentions. All market
segments were present. - Network Model Testing Clarification - Section
3.10.4 - On August 23, TPTF approved Network Model
Testing draft NPRR as modified by TPTF for
Sections 3.10.1 and 3.10.4 by a unanimous ballot
vote of 100 in favor with no abstentions. All
market segments were present. - Review PRS Remand of NPRR018, Separate LaaR and
Generator MCPCs for RRS, for completeness - Default QSE / LSE Scenarios and NPRR Draft for
Synchronization of PRR624
14Next Meetings
- Next meetings
- Tuesday, September 5 and Wednesday, September 6
- Monday, September 11 and Tuesday, September 12
- Wednesday, September 27 thru Friday, September
29 - On September 56, will be discussing Program
Timeline and Budget. - On September 1112, will be discussing
- Draft NPRR on CRR Settlement without DAM
- Draft NPRR for Synchronizing PRR624
(Clarification of MP Default Language) - Commercial Operations Business Requirements
- Initial Overview of RMR, Voltage Support, Black
Start, Emergency Operations Settlement Commercial
Operations Business Requirements Document - Review of comments received on Real-Time Energy
Settlements and DAM/RUC Eligibility Commercial
Operations Business Requirements Documents - EMS Business Requirements
- Initial Overview of second round of EMS Business
Requirements Documents - Review of comments received on Forced Outage
Detection, State Estimator, and Load Frequency
Control EMS Business Requirements Documents
15TAC Approval of Milestone
- On August 22, TPTF approved Real-Time AS
Settlement Business Requirements by a ballot vote
of 100 in favor, with abstentions by GEUS,
CenterPoint Energy, Calpine, City of Dallas,
Occidental, and Residential Consumers. All market
segments were present. - On August 22, TPTF approved RUC Settlement
Business Requirements by a ballot vote of 100 in
favor, with one abstention by CenterPoint Energy.
All market segments were present. - On August 22, TPTF approved DAM Make Whole
Settlement Business Requirements by a ballot vote
of 100 in favor, with abstentions by CenterPoint
Energy, Occidental, and Residential Consumers.
All market segments, except cooperative, were
present. - The Transition Plan says Any declaration of
the accomplishment of a major milestone (business
requirements, conceptual design, and successful
completion of Market Participant testing) or a
decision to proceed is contingent on the approval
of both ERCOT and TAC. - Request that TAC approve the milestones
- Approval of Real-Time AS Settlement Business
Requirements - Approval of RUC Settlement Business Requirements
- Approval of DAM Make Whole Settlement Business
Requirements
16Questions
?