Title: Cannon Mine Tailings Impoundment Wenatchee, WA


1
Cannon Mine Tailings Impoundment Wenatchee, WA
  • Jack A. Caldwell Robertson GeoConsultants
  • Ian Hutchison Strategic Engineering Science
  • Rick Frechette Knight Piesold
  • We were all with SRK for this project

2
Teton Dam Failure
  • On the Teton River, Southeast Idaho

3
More Teton
  • Failed 1976
  • Killed 11
  • Height 305 ft
  • Length 3,100 ft
  • Cost 48 million
  • Design Earth Dam

4
Causes of Failure
  • Foundation Seepage
  • Cracked Core
  • Internal Erosion
  • Piping

5
Looking Down to Wenatchee
Same Foundations Above the Town A Silica Quarry
6
JOINT VENTURE Asamera Minerals Breakwater
Resources
7
Cross Section
8
Surrounding Site Conditions
Basalt for Shell Loess for Core Quarry of Filters
9
Downstream Face of Embankment
10
The Grout Curtain
Cost 1 million Depth gt 200 ft Three Lines of
Grouting
11
What Was Actually There
Deep, Undetected Gully 16 million to clean and
clear
12
The Mill Site
13
Some Mine Stats
  • Produced
  • 1.25 million oz Gold
  • 2 million oz Silver
  • Employed 185
  • Underground Mine
  • Died During Mining 2

14
Tailings Deposition 1985 to 1994
15
Geotextile as Base for Cover
16
Cover Soil over Geotextile
17
Aerial View of the Impoundment
18
Site Revegetation in Progress
19
Revegetated Top Cover
20
At ClosureA Riding Stable Dry Gulch Preserve