Title: Introduction of AREVA group and Project Experience with Modernization of VVER Reactors
1Introduction of AREVA groupand Project
Experience with Modernization of VVER Reactors
2AREVA Steps towards a global leadership in the
energy industry
Within 5 years, AREVA has established itself in
the international energy market as a leader in
nuclear technology
April 2006
New name, clear structure
- To underline this develop-
- ment, the Board of Directors decided to structure
the AREVA group into -
- AREVA NP,
- AREVA NC and
- AREVA TD
3AREVA engineering and supplies
4Legal Structure of the AREVA group
2005 10,1 billion sales 58.760 employees
34
100
66
100
AREVA NC
AREVA NP
AREVA TD
Equity interests
ENERGY
AREVA NP is an AREVA and Siemens company.
5Organization of the group
TRANSMISSION DISTRIBUTION Division
FRONT END Division
BACK END Division
REACTORS SERVICES Division
- Plants
- Equipment
- Nuclear Services
- Nuclear Measurements
- Consulting Information Systems
- AREVA TA
- Mining
- Chemistry
- Enrichment
- Fuel
- Treatment
- Recycling
- Logistics
- Clean-up
- Engineering
- Products
- Services
- Systems
- Automation
AREVA NP
6AREVA around the globe
7Examples of AREVA NP activities in Central and
Eastern Europe
Areva NP modernizes VVER NPPs in order to
- Upgrade safety level to meet current
requirements - Improve operational features
- Enhance competitiveness
- Remove aging effects
- Extent plant license and lifetime
- Faciltate EU accession
8Examples of AREVA NP activities in Central and
Eastern Europe
AREVA NP references in VVER NPPs
- Modernization of Kozloduy 5 6
- Rest lifetime assessment and modernization of
Kozloduy 3 4 - Participation in new NPP Tianwan 1 2
- Reconstruction of Bohunice V1
- Completion and modernization of Mochovce 1 2
- IC replacement in Paks, Dukovany and Loviisa
- Various co-operation projects in Russian NPP
- (Kola, Kalinin, Balakovo, Novovoronezh)
- Various co-operation projects in Ukrainian NPP
- (South Ukraine, Zaporozhye, Rovno, Khmelnitsky,
Chernobyl) - in co-operation with Atomstroyexport
9Examples of AREVA NP activities in Central and
Eastern Europe
Kozloduy 5 6 (VVER1000) Modernization Project
Long term core cooling improvement Emergency
power supply and electrical systems
improvement Containment integrity Instrumentation
and control Radiation monitoring system
Diagnostic and computerised information systems
Replacement and modernisation of information
systems Internal and external hazards Safety
analyses and operation documents Mechanical
analyses
10Examples of AREVA NP activities in Central and
Eastern Europe
- Bohunice V1 (VVER 440/230) - Targets of
Modernization
- Reduction of core damage frequency
- Increased reliability of reactor trip system,
ECCS safety features and confinement spray system - Reduced probability of double ended guillotine
break of 500 mm RCS lines - Improvement ECCS against extended LOCA spectrum,
based on new DBA - New digital safety IC
- Seismic reinforcement up to scale 8
- Update of safety documentation / emergency
operating procedures
11Examples of AREVA NP activities in Central and
Eastern Europe
Completion Modernization of Mochovce 1 2
Final Statement by Riskaudit (2000) Mochovce
Nuclear Power Plant is the first soviet designed
nuclear power plant completed in an East European
country that achieved a safety level comparable
with western standards.
12Examples of AREVA NP activities in Central and
Eastern Europe
IC modernization What are the specific
arguments?
- To keep up with rapid development of
technologies - Original systems become outdated
- Increasing cost to guarantee for spare parts and
adequate service - Modern digital technology has key advantages
- It reduces time and cost for diagnostics and
tests - It offers more flexibility for plants operation
- It contributes to cost optimization
- Long term supply for modern systems assured
13Examples of AREVA NP activities in Central and
Eastern Europe
- Bohunice V 1 - Modernisation of IC
- Reactor shut down system
- Control of emergency and residual heat removal
(ESFAS) - In-core measurement
- Neutron ex-core measurement
- Emergency instrumentation
- New design for main and emergency control
room - Radiation control
- Diagnostic systems
Unit 2 completed 1999 Unit 1 completed 2000
14Examples of AREVA NP activities in Central and
Eastern Europe
IC Replacement in NPP Paks (VVER 440/213)
- Replacement of IC by Teleperm XS
- Reactor shut down system, ESFAS
- Neutron flux measurement
- Testing system for IC-Tests HW and SW
- Environment for further improvement
- Project Status
- Unit 1 since 1999 in operation with TXS
- Unit 2 since 2000
- Unit 3 since 2001
- Unit 4 implementation in April/May 2002
15Examples of AREVA NP activities in Central and
Eastern Europe
- After 2 decades of operation, modernization is
required to maintain competitiveness, to adopt to
newest standards and to assure further safe
operation - Operational and safety improvement is the basis
to obtain public acceptance and to reach common
ecological and economical targets - VVER in Central and Eastern Europe which have
passed through comprehensive modernization
programs achieved above targets - The key for success is the international
co-operation of strong and experienced partners
16Examples of AREVA NP activities in Central and
Eastern Europe
- After successful completion of several mutual
projects AREVA aims to cooperate as a partner
of Atomstroyexport in the Belene NPP - AREVA offered supplies are mainly related to
safety measures, IC, electrical systems,
heating, ventilation and air conditioning - Currently, AREVA cooperates with Atomstroyexport
in the new VVER of Tianwan 12 with a comparable
scope of supplies - AREVAs participation in Belene will facilitate
public and political (EU) acceptance and support
to reach Bulgarias ecological and economical
targets