Transcript and Presenter's Notes

Title: DO Timeline


1
DO Timeline
2000
2001


J
F M A M J J A S
O N D J F M
D
ICD
CFT install/hookup
SMT install/ hookup
Roll in
Remove shield wall
FPS
1/2 VLPCs installed
All VLPCs installed
Beam-ready
Lum (L0)
Platform moves
Install silicon front-end
Install final CFT electronics
1st CFT crate operational
Hookup ECS
Run II begins Mar 1, 2001
Install/checkout CAL BLS
Waveguide production
ECN cosmics
CC cosmics
Forward m MDT pixel planes install/survey (AB)
End toroids installed
Forward m MDT pixel planes install/survey (C)
Assemble/install/ align EMC
Cosmic Ray Commissioning
Phase II Fiber tracker, trigger,
preshowers, VLPCs, CTT, forward muon
Phase III Full Cosmic Ray Run
(add TRIG, SMT, CAL)
Phase I Central muon, DAQ, RECO,
trigger, silicon front-end
2
D0 Commissioning Timeline Commissioning/Integratio
n Goals
2000
2001


J
F M A M J J A S
O N D J F M
D
Forward muon C-layer MDTs/pixels
installed/commissioned
Half of CFT, CPS hooked up, checked out
Silicon front-end installed/commissioned
Roll in
Beam-ready
Forward muon AB layer MDTs/pixels
installed/commissioned
DAQ/online system running in user mode
Run II begins Mar 1, 2001
SMT, CAL fully added to commissioning chain,
exercise full triggering with all major systems
Integration Goal 1 dual muon crates,
initial muon triggering/filtering, ship data to
farm, run reconstruction, online event display
Integration Goal 2 Initial triggering on L1
CFT/CPS, begin linking tracks in CFT/CPS/CMuon,
begin Level 2 trigger integration
Integration Goal 4 Full detector in
steady-state Cosmic Ray Commissioning
Integration Goal 3 Add Central
Calorimeter to commissioning stream, most major
systems being commissioned
Begin full central muon system, integrate Level 2
muon trigger at DAB test stand
3
Current Detector ConfigurationDecember, 1999
  • South calorimeter on sidewalk
  • Run 1 Central Tracking removed
  • End toroids on sidewalk, Run 1 detectors (PDTs)
    removed
  • Central iron in open position to allow access
  • Solenoid, Central Preshower installed in central
    bore
  • Shield wall up
  • Hi-Bay clear for staging, other work in Assembly
    Hall

4
Current Detector ConfigurationDecember, 1999
  • End irons prepared for mounting A- and B-layer
    detectors (MDTs, pixels) on faces
  • Most of Central Muon PDTs, A-f, cosmic cap
    installed
  • Commissioning Level 1 trigger, muon system,
    online, silicon front-end, solenoid

5
Current Detector ConfigurationPhase I
  • A-layer MDTs, Pixels being mounted, surveyed onto
    faces of end irons
  • C-layer truss and shielding has arrived in
    Hi-Bay, being dressed
  • Remainder of detector remains open for access

6
Current Detector Configuration
  • Commissioning continues, using Central Muon as
    prototype system
  • Multi-crate readout of full central muon system
  • Event monitoring, crate control, steady DAQ
    running, filtering
  • Exercise reconstruction, online event display (on
    cosmic ray muons)

7
Forward Muon B-Layer InstallationMay-June, 2000
  • A-layer planes installed
  • B-layer MDTs, Pixels being mounted, surveyed onto
    faces of end irons
  • C-layer trusses and shielding continue to be
    dressed in Hi-Bay

8
Forward Muon B-Layer InstallationMay-June, 2000
  • End irons moved toward center of Assembly Pit to
    allow access for B-layer installation/surveying
  • Commissioning continues

9
Install Fiber Tracker in SolenoidJune, 2000
  • Fiber Tracker being installed in central bore
  • A- and B-layer detectors installed on end irons
  • B-layers Pixels open to allow access for
    hookup/commissioning
  • Commission Fiber Tracker (and Silicon) as they
    arrive

10
Install Fiber Tracker in SolenoidMay, 2000
  • Fiber Tracker Cart/I-Beam system lowered into
    gap between South End Calorimeter and Central
    Calorimeter
  • Rolled into solenoid bore along I-Beam

Cart System
Fiber Tracker
11
Move Platform West, Pick Up End IronsNovember
3-15, 2000
  • Silicon and Fiber Tracker both installed
  • South End Calorimeter back in place on platform
  • Platform moves west to pick up two end irons, now
    loaded with A- and B-layer detectors
  • C-layer MDTs and Pixels installed and surveyed
    onto trusses in Hi-Bay, ready to move down to
    sidewalk

12
Move Platform West, Pick Up End IronsNovember
3-15, 2000
  • Detector buttoned up during move central iron,
    calorimeters closed
  • A- and B-layer detector planes shut
  • No commissioning during this period (detector
    disconnected from services)
  • Movable Counting House moves with detector during
    pick up

13
Platform Returns to East Position Beginning
Phase II
  • Detector returns to east position with end irons
    installed
  • Central irons, calorimeters in open position
  • Ready for trusses to be brought down to sidewalk
  • Commissioning resumes
  • gradual integration of all detectors for Cosmic
    Ray Commissioning Silicon, Fiber Tracker,
    Calorimeters, Central and Forward Muons, Trigger

14
North EMC Truss Moves to North SidewalkNovember
20-28, 1999
  • North C-layer truss, with MDTs and Pixels
    mounted, moves to north sidewalk
  • End irons, calorimeters closed to allow clearance
    to shield wall
  • Central irons open
  • EMCs, shielding re-assembled on sidewalk to
    prepare for rolling in

15
EMCs Installed in Collision Hall December 11,
2000 - January 11, 2001
  • Shield wall is broken down, moved to now free
    space in Hi-Bay
  • North and South C-layer trusses/shields, having
    been assembled on sidewalk, rolled into Collision
    Hall - surveyed into place
  • Detector will be rolled into place to meet trusses

16
EMCs Installed in Collision Hall
  • Full Cosmic Ray Commissioning of all systems
    continues during most of this period
  • End irons, calorimeters can be opened for access

17
Detector Rolled in and Hooked UpFebruary 6, 2001
  • Full detector rolled in to final closed position
    hooked up, ready for beam
  • Shield wall back up
  • Movable Counting House travels with detector,
    cable bridge down
  • Commissioning with cosmic rays will continue
    until beam is delivered (March 1, 2001)

18
Access to Detector in Collision Hall
Closed Position - Data-Taking
Open Position - Detector Access
North B-layer pixels open
North end iron closed
South calorimeter open
South end iron open
Shielding retracted
19
Detector Rolled In, Hooked UpPhase III
  • Detector installed in compact space
  • Access to internal tracking detectors, end muon
    detector planes must be carefully coordinated

20
South EMC Truss Moves to South SidewalkNovember
29- December 5, 1999
  • South C-layer truss moves to south sidewalk
  • EMCs, shielding re-assembled on sidewalk to
    prepare for rolling in

21
South EMC Truss Moves to South SidewalkNovember
29- December 5, 1999
  • South C-layer truss moves to south sidewalk in
    two pieces, reassembled
  • Preparing to take down shield wall for roll in

22
The DØ Upgrade Tracking System
Charged Particle Momentum Resolution ?pT/pT 5
_at_ pT 10 GeV/c
23
Management of D0 detector upgrade for Run II
24