NPOESS P3I - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

NPOESS P3I

Description:

The Doppler Lidar Simulation Model (DLSM) Simpson Weather Associates .042 .042 ... What are the scanner power requirements? Peak and average draw? ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 10
Provided by: davee2
Category:
Tags: npoess | p3i | draw | how | simpsons | the | to

less

Transcript and Presenter's Notes

Title: NPOESS P3I


1
NPOESS P3IFollow-on Threshold Operational
Mission
  • Point Design Performance Plots
  • Using
  • The Doppler Lidar Simulation Model (DLSM)

Simpson Weather Associates
2
Direct Detection Subsystem
3
Coherent Detection Subsystem
4
Reference Performance Profile
5
833 km Demo Mission
Direct Molecular (Background Aerosol)
Direct Molecular (Enhanced Aerosol)
Coherent (Background Aerosol)
Coherent (Enhanced Aerosol)
At a planned 10 duty cycle, the orbit average
for the Direct Molecular system is estimated to
be 250 watts
Note
6
400 km Threshold Mission (30 degree nadir)
Direct Molecular (Background Aerosol)
Direct Molecular (Enhanced Aerosol)
Coherent (Enhanced Aerosol)
Coherent (Background Aerosol)
Note
At a planned 10 duty cycle, the orbit average
for the Direct Molecular system is estimated to
be 250 watts
7
400 km Threshold Mission (45 degree nadir)
8
Space Wind Measurement Requirements - 1

meet or exceed
TBD
9
Issues for ISAL/IMDC
  • What subsystems can be shared?
  • What is the standby power requirement for the DD
    system?
  • What are the scanner power requirements? Peak and
    average draw?
Write a Comment
User Comments (0)
About PowerShow.com