Description:

CN Tower. CN Tower. Rock foundation, hollow concrete shaft to 1100', 7 story ... Tower was opened to the public in June of 1976. Main Tower Features ... – PowerPoint PPT presentation

Number of Views:2129
Avg rating:3.0/5.0
Slides: 26
Provided by: bensch5
Category:
Tags: cn | tower

less

Transcript and Presenter's Notes

Title: CN Tower


1
CN Tower
2
CN Tower
  • Rock foundation, hollow concrete shaft to 1100',
    7 story steel and concrete "Skypod", 330' of
    hollow concrete shaft supporting the "Space
    Deck", 340' steel antenna mast.
  • 1815'-5'' above the foundation,
  • tallest freestanding structure.
  • 57 million dollars
  • three-and-a-half years to build.
  • It weighs the equivalent of about 23,200 large
    elephants (130,000 tons), and contains 53,000
    cubic yards of concrete and 5000 tons of
    reinforcing steel.
  • Tower was opened to the public in June of 1976.

3
Main Tower Features
4
Wind Tunnel Testing to Determine Loads
5
FoundationBoring Log
6
Foundation Considerations
7
Foundation Post-Tensioning
8
Start of Excavation
9
Excavation Near Complete
10
Steel and Post-Tensioning Ducts in Place
11
Foundation Essentially Complete
12
Slip-Forming -- Conceptually
13
The Slip-Form
14
The Tower Starts
15
And rises
16
And rises..
17
Post-Tensioning Strands
18
Location of Strands
19
A Post-Tensioning Strand
20
Skypod
21
Construction of Skypod
22
SpaceDeck
23
Helicopter used in final phase
24
Removing crane
25
Placing antennae