Space Network Access System SNAS Operational Readiness Review ORR

Description:

NASA/GSFC Code 452. September 4, 2008. Space Network Access System (SNAS) ... WSC AT participants: JSC ISS & Shuttle, NOMs, Development Team (performance) ... – PowerPoint PPT presentation

Number of Views:227
Avg rating:3.0/5.0
Slides: 76
Provided by: Hone163
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Space Network Access System SNAS Operational Readiness Review ORR


1
Space Network Access System (SNAS) Operational
Readiness Review (ORR)
  • September 4, 2008
  • NASA Code 452
  • Space Network (SN) Project

2
ORR Agenda
  • Welcome/Introduction Rose Pajerski
  • Operational Hardware Tom Holub
  • Acceptance Testing Merri Benjamin
  • WSC IT Security Evaluation Rich Pearce
  • SNAS Training Dave Warren
  • Software Sustaining Plan Chii-der Luo
  • WSC Operations Maintenance Marty Antholzner
  • Post ORR activities Rose Pajerski

3
Purpose of Review
  • The objectives of the review are to provide a
    comprehensive briefing to
  • Review SNAS requirements and results of
    acceptance testing activities
  • Present transition plans and activities
  • Brief on the system, personnel and documentation
    readiness for transition
  • Demonstrate the systems readiness to support
    NCCDS operations at WSC
  • Readiness criteria
  • All applicable functional, unit, subsystem
    testing, etc. has been successfully completed.
  • All RFAs / issues from previous reviews have been
    satisfied according to plan.
  • All known significant system discrepancies have
    been identified and dispositioned
  • Interfaces under configuration management
  • Operations personnel identified, trained and
    ready
  • Upon completion of the review, the SNAS team
    seeks approval to proceed with transition to
    operations for NCCDS interface

4
ORR Objectives
  • ORR Presentation will address each item below
  • All validation testing is complete
  • Test failures and anomalies from validation
    testing have been resolved
  • All operational and enabling products necessary
    for normal and contingency operations have been
    tested and in place
  • Operations handbook has been approved
  • Training has been provided to users and operators
  • Operational contingency planning has been
    accomplished, and all personnel have been trained

5
Welcome / Introduction
  • Rose Pajerski

6
Review Board
  • Joe Stevens, (chair), NASA GSFC Code 730
  • Joe Aquino, NASA JSC ISS/SST
  • Markland Benson, NASA WSC Code 583
  • Dave Campbell, NASA GSFC Code 584, HST
  • Curtis Emerson, NASA GSFC Code 530
  • Lynn Myers, NASA GSFC Code 450

6
7
Prior Milestones
  • SNAS Release 1 Milestones
  • System Requirements Review 7/08/03
  • Delta-System Requirements Design Review 4/28/05
  • Preliminary Design Review 9/12/05
  • Critical Design Review 5/04/06
  • Implementation 6/5/06 - 7/20/07
  • Integration/System Testing 8/07 - 5/08
  • Beta Testing 8/07 - 8/08
  • Server Shipment to WSC 5/06-12/08
  • System Installation and Checkout 5/14-30/08
  • Test Readiness Review 6/6/08
  • NCCDS Acceptance Testing 6/23-8/29/08
  • Customer Training 7/08-8/08
  • WSC Operations Training 8/26/08
  • Performance test 8/28/08

7
8
Moving Forward Schedule
  • Scheduled
  • Completion
  • Operational Readiness Review today
  • Operational Availability (NCCDS) 9/23/08
  • SNAS/DAS Acceptance Testing Complete Oct08
  • Delta-ORR for SNAS/DAS Oct08
  • Customer Training (CIM 9, WSC, customer sites)
    Nov08
  • Operational Availability (DAS) TBS
  • DAS Customers Transition to SNAS (as a group)
    TBS
  • End SWSI and UPS fixes/releases TBS

8
9
Customer Community Milestones
  • Group Customer Interface Meetings
  • April 2005 (pre-SRR) through July 2008 (AT)
  • Beta Testing
  • Participants NOMs, WSC, HST, JSC, TRMM, SPM,
    SPTR
  • Release 1 4/07 8/08
  • Acceptance Testing
  • MOC operational data sets HST, JSC, TRMM,
    Landsat, SWIFT
  • MOC operational scenarios JSC, SPM, SWIFT
  • WSC AT participants JSC ISS Shuttle, NOMs,
    Development Team (performance)

9
10
Project Documentation
  • System Requirements Doc. (DCN 002) CCB approved
    (4/30/08)
  • Operations Concept Doc. (DCN 002) CCB approved
    (11/15/06)
  • ICD between DAS/SNAS CCB approved (5/03/06)
  • ICD between EPS/SNAS CCB approved (11/15/06)
  • ICD between SN/CSM (DCN 002) CCB approved
    (10/29/07)
  • Security Documentation 452 Approved (10/29/07)
  • System Test Document Final, 5/16/08
  • Acceptance Test Plan Final, 6/04/08
  • MOC Client Users Guides Draft to CCB
  • OM Client Users Guides Draft to CCB
  • Server Operators Guide Draft to CCB

10
11
Operational Server Hardware
  • Tom Holub

12
Hardware Status
  • SNAS Server System
  • Two racks
  • 2 Open Servers
  • 2 Closed Servers
  • 2 Closed Data Servers
  • Closed RAID Array
  • UPS
  • NISN-managed switches
  • Installed with EC-TO 060-1
  • SNAS Server System connections
  • Open and Closed IONet complete except for
    Out-of-Band Connectivity
  • Sparing plan
  • One APS UPS battery
  • One HP system disk
  • One EMC Clariion NAS disk
  • Maintenance Plan for servers

13
Hardware Status (contd)
14
SNAS (AT) Architecture
15
Acceptance Testing
  • Merri Benjamin

16
Acceptance Test Overview (1 of 3)
  • Testing Overview Scope
  • Both MOC and OM Client functionality
  • SNAS/NCCDS interface (ANCC)
  • SNAS/DAS interface (HMD DAS)
  • Limited EPS/SNAS interface testing
  • Used PC Client platform directory as pseudo-EPS
  • JSC EPS end-to-end with Beta System
  • Server operations (e.g., High Availability (HA),
    logging)
  • Exercised operational procedures (e.g., database
    recovery, SW delivery, etc.)
  • Test Cases executed and procedures exercised to
    verify system functional and performance
    requirements

17
Acceptance Test Overview (2 of 3)
  • Testing Environment
  • SNAS Servers connected to IONet with data passed
    to and from the ANCC and HMD DAS
  • Clients connected to Open and Closed IONET
  • Clients hosted on Windows PC platforms only
  • Tested in OPS mode only (OPS database instance)
  • Test Support
  • WSC Testers - TOA, OPS, and SE Departments
  • WSC SA/Oracle DBA, NCCDS and DAS - Software
    Department
  • JSC representatives (Jeremy Gibson and Mike
    Duffy)
  • Traveled to WSC
  • Tested recurrent scheduling, orbital input
    processing, and EPS functions
  • Performed Schedule Planning and Schedule
    execution for ISS, STS, and ATV (functional and
    performance testing)

18
Acceptance Test Overview (3 of 3)
  • Status Meetings
  • Held AT status meetings Mondays and Thursdays
  • Meeting agenda outstanding test issues, IDR
    review and work-off plan
  • Test CM
  • Discrepancies maintained and tracked in CDS
    Remedy -IDR database
  • Five patches delivered
  • Fixes tested and regression tests
  • Results presented Release Candidate 5 baseline
  • Acceptance Test Report will be delivered
    10/03/08

19
Acceptance Test Results
  • MOC Client Functionality
  • OM Client Functionality
  • Server/System Testing
  • IT Security Controls

20
Acceptance Test Results - MOC Client (1 of 6)
  • 5 Test Cases - general functions for configuring
    User/Client environment
  • Login, setting session preference, workspace
    set-up, etc.
  • Results 5 passed
  • 8 Test Cases - general functions for configuring
    Mission
  • MOC roles/accounts, EPS set-up, Service Codes,
    Orbital data, etc.
  • Results 8 passed
  • 6 Test Cases import data for both DAS and NCCDS
    customers
  • State vectors, TCW, TSW, and PSAT/UAV files
  • Results 4 passed and 2 partial success
  • State vector transmits to ANCC successful state
    vector transmits to HMD DAS failed

21
Acceptance Test Results - MOC Client (2 of 6)
  • 9 Test Cases NCCDS scheduling
  • SAR, SDR, RR, WLR, Recurrent Scheduling, TUT,
    etc.
  • Results 9 passed with following notes
  • EPS-AUTONCC had Client platform as the EPS node
  • Replace Requests - functions when submitted
    through Schedule Request window, only (not Active
    Schedule window)
  • JSC performed schedule planning for ISS, STS,
    and ATV
  • 9 Test Cases DAS scheduling (not tested with
    Candidate 5)
  • TVR, RAR, RAMR, RADR, PBKR, etc
  • Results 8 partial success and 1 Blocked with
    following notes
  • Bulk schedule files to DAS - not operationally
    used - no bulk file available
  • EPS-AUTODAS - limited to bulk state vectors
  • Performed WSC TOA DAS Regression Test each
    time HMD DAS was available (WSC DAS OPS with
    SNAS)

22
Acceptance Test Results - MOC Client (3 of 6)
  • 6 Test Cases Scheduling Tools (both NCCDS and
    DAS)
  • Active Schedule Summary, Request Schedule
    Summary, TSW shift, etc.
  • Results 6 passed
  • 2 Test Cases Real-time monitoring
  • UPDs, Switch User
  • Results 2 passed
  • 3 Test Cases Reports and Queries
  • Confirmed events report, Rejected/Decline report,
    User environment displays, etc.
  • Results 3 passed

23
Acceptance Test Results - MOC Client (4 of 6)
  • MOC Client Summary
  • Remaining Open IDRS
  • SNAS/NCCDS - 3 Low Priority
  • IDR 26506 (Low) - TSW deletes when overlap data
    range
  • IDR 26507 (Low) - TSW Msg ID validation
  • IDR 26451 (Low) - Replace Request submitted
    through Active Schedule

24
Acceptance Test Results - MOC Client (5 of 6)
  • Remaining Open IDRS (contd)
  • SNAS/DAS - 2 High Priority and 4 Low Priority
    (Candidate 5 fixes not tested)
  • IDR 26288 (High) - State Vector transmits to DAS
  • IDR 26415 (High) - Modify on-going event
  • IDR 26496 (Low) - Data Format Protocol not saved
    in SSC
  • IDR 26422 (Low) - unable to modify DAS service
    end time using RMAR
  • IDR 26423 (Low) - RAMR reference request ID
    window does not include ANY
  • IDR 26424 (Low) - TDRS ANY cannot be deleted
    via RADR
  • General - 1 Low Priority
  • IDR 26308 (Low) - Dialog boxes do not always
    close as expected

25
Acceptance Test Results - MOC Client (6 of 6)
  • Recommended additions to wish list for
    consideration for future releases
  • Add a combined Scheduler/Controller role
  • Add in GUI the listing of SSC/Service type naming
    convention
  • Add capability to add SSC by copying existing SSC
  • Add capability to delete TSW by TSW Set ID and
    TDRS ID
  • Add capability to filter Active Schedule and
    Schedule Request windows by date range
  • Change vector import and transmit windows to
    default to NCC
  • Add reload button for TSW Summary

26
Acceptance Test Results
  • MOC Client Functionality
  • OM Client Functionality
  • Server/System Testing
  • IT Security Controls

27
Acceptance Test Results - OM Client (1 of 2)
  • 3 Test Cases General Client/Session
    Configuration
  • Login, View status
  • Results 3 passed
  • 9 Test Cases - Mission and User Configurations
  • SSC update, SUPIDEN, TDRS, establish connections,
    etc.
  • Results 9 passed
  • 2 Test Cases - System Monitoring
  • Results 2 passed

28
Acceptance Test Results OM Client (2 of 2)
  • OM Client Summary
  • Remaining Open IDRS none
  • Alert window will be delivered in next release
  • Recommended additions to wish list for
    consideration for future releases
  • Add capability to add SSC by copying existing SSC
  • Add role/access privileges allows for system
    monitoring without DBA account
  • OM approval window
  • Mark the changes being requested from the MOC
    Client
  • Allow for dialog for approval (not just rejected
    requests)

29
Acceptance Test Results
  • MOC Client Functionality
  • OM Client Functionality
  • Server/System Testing
  • IT Security Controls

30
Acceptance Test Results - Server/System (1 of 8)
  • Test overview
  • High Availability application and configuration
  • System/Application Logging
  • SNAS/SN Interface
  • End-to-end testing EPSClient- Server-ANCC/HMD
    DAS
  • EPS to Client same platform
  • Limited HMD DAS availability
  • System Performance and Loading Test

31
Acceptance Test Results - Server/System (2 of 8)
  • High Availability (HA) Testing
  • Linux HA product
  • Runs on all three clusters (Open Servers, Closed
    Servers, and Data Servers)
  • Provides for prime and backup to meet high
    availability/performance requirements
  • Each cluster has two nodes with resources
    (applications) distributed
  • Supports two modes of operations OPS and EIF
  • Tested basic operations of application with
    command statements and with GUI
  • Start, Stop, Banish, Allow, etc.
  • Resource failure operations
  • Component (node) failure operations (server
    powered-off)
  • Results Partial Success
  • Some unexpected bouncing of resources between
    nodes
  • Following failure, state returns to last state
    not standby
  • Failure counts not incrementing

32
Acceptance Test Results - Server/System (3 of 8)
  • System/Application Logging
  • Applications Logs
  • SAM, SvE, DSDM, SNIF, and SDIF
  • Logs required to contain
  • Source
  • Severity code
  • Timestamp field
  • Explanation code
  • Results Pass
  • SNAS/SN Interface
  • SNAS/SN TCP/IP protocol
  • Results Pass

33
Acceptance Test Results - Server/System (4 of 8)
  • End-to-end System Testing
  • EPS - Client - Server - ANCC/HMD DAS
  • Interfaces verified during Performance Test
  • Part of Candidate 5 regression testing
  • Results Partial Success
  • Limited EPS to Client testing - EPS simulation
    not a function of ANCC (JSC verified in Beta
    environment)
  • Limited time available for SNAS/HMD DAS testing -
    no regression testing for Candidate 5

34
Acceptance Test Results - Server/System (5 of 8)
  • Performance/Loading Test
  • Test Overview
  • Tested only SNAS/ANCC HMD DAS not available
  • Ten Testers AT Testers, TOA, GCP NOM, SNAS
    Developers
  • Each logged into 5 MOC Client sessions 50
    concurrent Client sessions
  • Two OM Client Sessions
  • Test duration about 3 hours
  • Functions/Activities performed
  • Import bulk SARs
  • Import bulk IIRVs
  • Import/Transmit TSWs
  • Import TCW/generate TSWs
  • Import PSAT/UAV
  • Perform Recurrent Scheduling
  • Utilize EPS node operations
  • Perform GCMRs
  • Request reports and database queries

35
Acceptance Test Results - Server/System (6 of 8)
  • Performance/Loading Test (contd)
  • Data Collected
  • Server Performance Logs
  • Eldorado OPS Data Server (241/1720-241/2350)
  • Roadrunner OPS Open Server (241/0000-242/0000)
  • Fury Ops Closed Server- (241/0000-242/0000)
  • Client Alert Logs / Testers notes
  • Results Passed
  • No node/resource failures noted
  • Over 900 requests/interactions with ANCC at one
    time (200 normal ops)
  • Some delay noted at Client for window refresh
    (e.g. Active Summary)
  • Alert logs indicate no latency in server
    processing
  • Interactions between SvE and SNIF lt 2 seconds
  • Interactions between SvE and DSDM lt 5 seconds
  • Available MEM at pre-test 30. 50 simultaneous
    Client sessions, added 2. Assuming 250
    simultaneous Client session, add 10, then
    available MEM gt 60.

36
Acceptance Test Results - Server/System (7 of 8)
  • Performance/Loading Test (contd)
  • Server Performance Log Data

37
Acceptance Test Results - Server/System (8 of 8)
  • Server/System Summary
  • Remaining Open IDRS all related to HA
  • IDR 26487 - Unexpected resources moving between
    nodes
  • IDR 26489 - Explore modification to
    configuration to return node to standby state
    vice last state
  • IDR 26488 - Failed counts not incrementing
  • Possible documented Linux HA BUG

38
Acceptance Test Results
  • MOC Client Functionality
  • OM Client Functionality
  • Server/System Testing
  • IT Security Controls

39
Acceptance Test Results Security Controls
  • 100 Security Controls recommended
  • 66 Implementation Acceptable
  • 4 Certification and Accreditation
  • 7 Not Applicable to SNAS
  • 9 Documentation needed
  • 13 Further verification required
  • 1 Waiver request planned

40
Acceptance Test Results - Summary
  • 66/67 Test Cases executed
  • 1 Blocked - Bulk schedules to DAS
  • 54 Passes
  • 12 Partial Successes
  • IDRs remaining Open - 13
  • 3 - related to SNAS/NCCDS - (TSW, RR)
  • 6 - related to SNAS/DAS
  • 1 - general Client operations - dialog box not
    closing
  • 3 - related to HA
  • IDRs Closed - 34

41
WSC IT Security Evaluation
  • Rich Pearce

42
WSC IT Security Evaluation (1 of 6)
  • IT Security Acceptance Testing is centered on
    availability of approve documentation, the draft
    IT Security Plan, and implementation of
    system-specific security controls (WSC-wide and
    NASA common controls not considered for testing).
  • Required NASA Approved documentation
  • Final Risk Assessment, IT Security Plan,
    Contingency Plan
  • Account Management
  • Server accounts
  • Client accounts
  • System/Audit Logging Review
  • Disaster Recovery
  • Software
  • Oracle database

43
WSC IT Security Evaluation (2 of 6)
  • Approved IT Security Documentation
  • Still incomplete
  • Draft documents only
  • Final Risk Assessment needed based on actual
    implementation
  • Recommended changes to IT Security Plan still
    awaited
  • Contingency Plan can piggy back on Appendix C of
    WSC-PLN-0088 (WSC MEI IT Security Plan) Need
    for separate plan up to NASA.
  • No final security verification matrix or test
    plan
  • WSC IT Security assessment - Partially complete

44
WSC IT Security Evaluation (3 of 6)
  • Account Management
  • Server Account Management
  • Server accounts created and managed based on
    approved account request (Form WSC-0325)
  • WSC SA responsible for creating and configuring
    accounts based on the approved form
  • Server accounts will be restricted to System
    Admins (SA), Database Admins (DBAs), ADPE Techs
    and IT Security
  • MOC and OM Client Account Management
  • No provision for account requests. MOC User
    Guide requires list of users and data required
  • Completed/signed SNAS Rules of Behavior will be
    required of all users
  • Local OM Client accounts (for WSC OM personnel
    only) will follow MOC requirements
  • OPS DBA is responsible for MOC and OM Client
    account management through OM tools and
    procedures
  • WSC IT Security assessment - PASS
  • Local procedure needed for Server account
    management or change to existing LOP, as necessary

45
WSC IT Security Evaluation (4 of 6)
  • System/Audit Logging and Review
  • Audit logging still not configured for security
    requirements
  • Server application log containing audit data
    (violates separation of duties requirements)
  • Designated Audit log empty
  • No tools for syslog or audit data review
    (dependence on System Messages)
  • Unable to test alerting for audit process failure
    (could not stop audit process)
  • WSC IT Security assessment - Fail
  • Need to finalize syslog and audit data locations
    and ensure only IT Security/Root-level access
  • Need tools for audit data extraction and
    syslog/audit log backup to removable media

46
WSC IT Security Evaluation (5 of 6)
  • Disaster Recovery
  • No procedure/plan for system/database backups
    including off-site storage
  • SNAS software disaster recovery procedure
  • WSC LOP Volume IV - Book 2, LOP 32 Software
    Configuration Management Disaster Control
    provides for SW recovery
  • Five software patches (Client/Server/DB) have
    been delivered during AT - GSFC remote access for
    software delivery exercised
  • Oracle database recovery
  • EIF instance auto backup is functioning
  • Open IDR 26368 repeat for OPS instance
  • EIF shutdown and database recovery successfully
    exercised
  • Open IDR 26433 repeat for Ops instance
  • Procedure to be documented
  • Procedure exercised on OPS instance
  • WSC IT Security assessment Partially complete
  • Document procedures for database and system
    backup Close IDRs 26368 and 26433

47
WSC IT Security Evaluation (6 of 6)
  • IT Security Summary/Action Plan
  • Much remains for developer and WSC
  • Correction of issues presented especially
    regarding auditing
  • Create tools/procedures to assist in System
    Admin/IT Security work
  • Finalize required documents
  • Final system check, including updated full system
    vulnerability scan by WSC
  • Those controls in Security Plan that cannot be
    met/risk accepted need a POAM for correction.
  • Overall Readiness Assessment Not Ready
  • Primarily due to audit issues
  • Need for finalized documentation
  • Need for system/database backup procedures

48
SNAS Training
  • David Warren

49
Customer MOC Client
  • Held Customer Interface Meeting 8 on July 30th
    with training for
  • Installation of Client and Certificates
  • Client property configuration
  • File System Setup for External Processing System
  • Mission Manager responsibilities
  • Spacecraft characteristics and default scheduling
    parameters
  • Mission account setup and role assignments
  • Generating NCC State Vector and Schedule Requests
  • Overview of Reporting and Graphical Timeline
  • Mission representatives in attendance
  • HSF, HST, SPTR-2, NPOESS, SWIFT, IBEX, GLORY,
    GALEX, GPM, TRMM, and WSC and JSC engineering
  • Several Network Operation Managers supporting
    multiple missions
  • Next session to cover DAS scheduling, Graphical
    Timeline usage, and External Processing System in
    September
  • Tech Ops received MOC Client training at GCP
  • JSC Schedulers HSF NOMs participated in WSC
    training

50
WSC OM
  • Held session on August 26th with training for
  • Server Architecture and Components
  • Server Configuration and Operation
  • High Availability
  • OM Client
  • 2nd Session week of 9/15/2008 to cover
  • Database Design and Management
  • Digital Certificate Management
  • System Administration Procedures
  • Problem Reporting and Tracking
  • Troubleshooting Procedures
  • WSC representatives in attendance
  • Sys Admin, Oracle DB Admin, OM DB Admin, TOA,
    Ops Trainer
  • WSC Oracle DBA received Oracle Backup/Recovery
    Training

51
Software Sustaining Plan
  • Chii-der Luo

52
Software Sustaining Plan
  • Discrepancy Reporting Process
  • Comprehensive Discrepancy System (CDS) Network DB
    will be used to report problems occurring in the
    Operational Network including SNAS
  • Bugzilla will be used for reporting development
    and Beta (IT) discrepancies, or Wishlist
    functionality for future releases
  • A SNAS System Engineering Review Board (SERB)
    will be chartered to collect discrepancy and
    enhancement requests and work with SN lead to
    work them into a delivery schedule
  • Follow the SERB process currently used by SWSI
  • Participants from WSC Operations and SN User
    Community

53
Software Sustaining Plan (contd)
  • Development for future functionality and
    maintenance release
  • plan to support development of current release
    fixes
  • Configuration Management / Delivery Process
  • SNAS CM Plan to be followed throughout SNAS life
    cycle
  • Developers provide tested code to CM lead, who
    pulls from CM tool (CVS) and integrates on Beta
    system, then moves to Operations
  • System and Database backups performed
  • Media delivered to WSC CM for data archive
  • Maintain documents on SNAS website

54
WSC Operations and Maintenance
  • Marty Antholzner
  • Melissa Jones

54
55
WSC SNAS Staffing Plan
  • Key WSC personnel to support the sustainment
    of SNAS O M

55
56
Methodology of Review
  • Conducted a review of the major SN Core elements
    to ensure SNAS is providing all required items to
    support transition to customer testing
  • Utilized a status matrix with drill down
    capability to review each area
  • Conducted weekly meetings to work issues and
    provide status
  • Quickly brought issues to managements attention
    for action
  • Provided weekly status to local WSC NASA
    management
  • Objective was to get the red out

56
57
WSC Operations ORR Red Out Chart
57
58
WSC Open Items
58
59
WSC Open Items (contd)
59
60
WSC Open Items (contd)
60
61
Operations Summary
  • WSC recommends that SNAS be declared operational
    upon the completion of the previously briefed
    open items
  • Keys items include
  • IT security audit logging (3.5),
  • EC completion (1.1 and 3.7),
  • Training (3.9) and
  • Procedures (3.1, 3.2 and 3.3)
  • Working to close all open items by 09/19/08
  • DAS customer usage is tied to successful
    completion of Acceptance Testing (yet to be
    scheduled)
  • At WSC OM determination (based on item closure),
    SNAS would be available for MOCC usage and NASA
    would begin asking customers to switch from
    SWSI/UPS to SNAS
  • WSC OPS DBA functions for Customer support would
    begin at that time
  • WSC TOCC Operations may utilize OM Client to
    monitor system
  • HMD ADPE Techs would begin 24X7 monitoring of
    Server System

61
62
Post ORR Activities Rose Pajerski
62
63
ORR Objectives
  • Items addressed in ORR Presentation
  • All validation testing is complete
  • SNAS/DAS testing to resume when HMD DAS is
    available
  • Test failures and anomalies from validation
    testing have been resolved
  • Action Plan to resolve IT Security issues
  • All operational and enabling products necessary
    for normal and contingency operations have been
    tested and in place
  • Hardware under WSC CM
  • Operations handbook has been approved
  • WSC LOPs in-work
  • Server Operators Guide/Client Users Guide
  • Training has been provided to users and operators
  • Training sessions have begun/training material
    complete
  • Operational contingency planning has been
    accomplished, and all personnel have been trained
  • Database Recovery partially exercised
    procedure to be documented

64
Forward Schedule - Release 1
  • Scheduled
  • Completion
  • Operational Readiness Review today
  • Operational Availability (NCCDS) 9/23/08
  • SNAS/DAS Acceptance Testing Complete Oct08
  • Delta-ORR for SNAS/DAS Oct08
  • Customer Training (CIM 9, WSC, customer sites)
    Nov08
  • Operational Availability (DAS) TBS
  • DAS Customers Transition to SNAS (as a group)
    TBS
  • End SWSI and UPS fixes/releases TBS

64
65
Post-Release 1 Schedule
  • Release 2
  • Implementation ongoing
  • Beta Testing 9/08 - 11/08
  • Acceptance Testing 10/08
  • Operational Availability 12/08
  • Release 3 1/09 - 9/09

65
66
Post-ORR Activities
  • Respond to RFAs
  • Previous from earlier reviews (all closed but 1
    security-related pending action)
  • New from todays review
  • Finalize WSC SNAS OPS, EIF configurations
  • Finalize Release 1 documentation
  • MOC and OM Users Guides
  • Server Operators Guide
  • WSC Operations Procedures
  • Support Customers with their Transition to SNAS
  • Schedule Customer Interface Meetings
  • Work with Network Operations Managers
  • Host Customers at WSC
  • Visit Customer Sites

66
67
In Closing
  • Closing remarks from review board
  • Thank you for your attendance
  • RFAs
  • Due date Monday (9/8)
  • Submit to Shina Sangani-Dave (Code 452, PAAC II)
  • Email shina.sangani-dave-1_at_nasa.gov

67
68
Backup Slides
68
69
Organization
NASA
Contractor
69
70
Acronyms
  • ANCC Auxiliary Network Control Center
  • ADPE Automated Data Processing Equipment
  • AT Acceptance Testing
  • CIM Customer Interface Meeting
  • CCB Configuration Control Board
  • CSM Customer for Service Management
  • DAS Demand Access System
  • DBA Data Base Administrator
  • EC Engineering Change
  • EPS External Processing System
  • GALEX Galaxy Evolution Explorer
  • Glory Solar Irradiance Gap Filler
  • GPM Global Precipitation Mission
  • GSFC Goddard Space Flight Center
  • HA High Availability
  • HMD Hardware Maintenance Depot
  • HSF Human Space Fight
  • HST Hubble Space Telescope
  • HTSI Honeywell Technical Solutions Inc
  • NCCDS Network Control Center
  • Data System
  • NOM Network Operations Manager
  • NPOESS National Polar-orbiting Operational
    Environmental Satellite System
  • NENS Near Earth Network Services
  • OM Operations and Maintenance
  • PE Prototype Event
  • PVM Performance Verification Matrix
  • RFA Request For Action
  • RTVM Requirements Traceability and Verification
    Matrix
  • SA System Administrator
  • SERB System Engineering Review Board
  • SIC Spacecraft Identification Code
  • SN Space Network
  • SNAS Space Network Access System
  • SPM Special Projects Missions
  • SPTR South Pole TDRS Relay
  • SRR System Requirements Review
  • SSC Service Specification Code

70
71
SNAS Security Controls Assessment (1 of 5)
71
72
SNAS Security Controls Assessment (2 of 5)