Recent IAEA Activities Related to OnLine Monitoring of NPP I - PowerPoint PPT Presentation

1 / 54
About This Presentation
Title:

Recent IAEA Activities Related to OnLine Monitoring of NPP I

Description:

Mr. T. Taniguchi. Department of. Safeguards. Mr. P.Goldschmidt. Department of Administration ... T. Mazour. Project management & strategic planning. Manpower ... – PowerPoint PPT presentation

Number of Views:130
Avg rating:3.0/5.0
Slides: 55
Provided by: glockler
Category:

less

Transcript and Presenter's Notes

Title: Recent IAEA Activities Related to OnLine Monitoring of NPP I


1
Recent IAEA Activities Related to
On-LineMonitoring of NPP IC Systems
  • IAEA Technical Meeting on
  • On-Line Condition Monitoring of Equipment and
    Processes in
  • Nuclear Power Plants Using Advanced Diagnostic
    Systems
  • Knoxville, Tennessee, USA
  • June 27-30, 2005

2
Introduction
  • Oszvald Glöckler
  • Nuclear Power Engineering Section
  • Division of Nuclear Power
  • Nuclear Energy Department
  • International Atomic Energy Agency
  • Scientific Secretary for the Technical Working
    Group on Nuclear Power Plant Control and
    Instrumentation
  • (TWG-NPPCI)

3
Location of the IAEA
4
(No Transcript)
5
(No Transcript)
6
Departmental Structure of the IAEA
Director General Mr. El Baradei
Department of Nuclear Energy Mr. A. Yuri Sokolov
Department of Technical Co-operation Ms. Ana
Maria Cetto
Department of Nuclear Safety Mr. T. Taniguchi
( RB 18M/ EB 2M)
( RB 89M/ EB 4M)
( TCF 73M/ EB 6M)
Department of Administration Mr. D. Waller
Department of Nuclear ScienceApp Mr. W. Burkart
Department of Safeguards Mr. P.Goldschmidt
( RB 20M/ EB 4M)
( RB 70M/ EB 18 M)
( RB 15M)
7
(No Transcript)
8
(No Transcript)
9
Structure of Nuclear Energy Department
Director General
DIRECTOR GENERAL
Department of Management
Department of Nuclear Energy
DEPARTMENT OF NUCLEAR ENERGY
Department of Nuclear Safety and Security
Planning and Economic Studies Section
INIS Section
Department of Technical Cooperation
IAEA Library
Department of Nuclear Science and Application
Department of Safeguards
Division of Nuclear Fuel Cycle and Waste
Technology
Division of Nuclear Power
DIVISION OF NUCLEAR POWER
Nuclear Fuel Cycle and Materials Section
Waste Technology Section
Nuclear Power Technology Development Section
Nuclear Power Engineering Section
Nuclear Power Engineering Section
10
NUCLEAR POWER ENGINEERING SECTIONORGANIZATIONAL
CHART (2005)
P Staff Country Profile Argentina (1)Canada
(1) China (1) Czech Republic (11 /cost
free) Hungary (1) Korea (11 /cost free) Romania
(1) Russia (1) Sweden (1) USA (2)
P Staff P 5 4 P 5 1 (TA) P 4 4 P 3 2 P2
1 Cost free 2 G staff G 6 1 G 5 1 G 4 4
Section Head C. Russell Clark
Data Clerk/Secretary June Y.K. Mueller-Yu
Secretaries O. Arkhipova R. George L. Makil R.
Wehofsitz
( 60 Programmatic Tasks / 19 TC Projects)
Support DB user M. Raatz IT Support for NENPA.
Pyrakhin
A1 Engineering and Management Support for
Competitive Nuclear Power ( 35 Programmatic
Tasks / 11 TC Projects)
A2 Improving Human Performance, Quality
Technical Infrastructure ( 25 Programmatic
Tasks / 8 TC Projects)
  • M. Condu
  • Economics of NPPs
  • Management of pre-project activities
  • Reliability studies PLIM/ PLEX decommissioning

A2.01 (4 Programmatic) Strengthening and
harmonization of NPP quality assurance/quality
management principles
  • P. VinczeK. Dahlgren-Persson
  • Quality management
  • Nuclear safety standards on QA and future
    Harmonization
  • Management of NPP performance

A1.0.1 (11 Programmatic / 3 TC) Continuous
process improvement of NPP operating performance
  • O. Glockler
  • Specific aspects of NPP IC
  • IC modernization projects
  • On-line condition monitoring

Process Owner P. Vincze
Process Owner M. Condu
  • N. Pieroni (TA)F. Hezoucky (Cost-free)
  • Integrated planning of nuclear power programme.
  • Management of pre-project activities
  • K.S. Kang
  • Integrated Plant Life Management
  • Aging management programme
  • Reactor Press vessel integrity

A2.02 (12 Programmatic / 5 TC) Strengthening
national and regional nuclear power
infrastructures
A1.02 (13 Programmatic / 8 TC) Integrated NPP
life cycle management including decommissioning
  • H. Cheng
  • Engineering support to NPP operation
  • Primary circuit integrity
  • NDT Maintenance
  • NENP TC Coordinator

Process Owner K.S. Kang
  • T. Mazour
  • Project management strategic planning
  • Manpower development
  • Human performance

Process Owner N. Pieroni
A2.03 (9 Programmatic / 3 TC) Strengthening NPP
system to Achieve Maintain High Standard of
Personnel Performance
A1.03 (11 Programmatic) Databases to support
NPP performance and life cycle management
  • J. Mandula
  • Country nuclear power profiles
  • PRIS database and services to MS
  • Outage management and economic analyses
  • Kazennov
  • NPP training and qualification
  • Configuration management
  • Simulator Engineering

Process Owner J. Mandula
  • S.K. Cho (Cost Free)
  • Assist in
  • Country nuclear power profiles
  • Intl. Economic Performance Database

Process Owner T. Mazour
Human Performance Improvement , Quality Assurance
and Strengthening Technical Infrastructure
TC Support
NPP Performance Optimization and Life Cycle
Management
NENP/TC Liaison Officer, H. Cheng
11
Place of NPP Instrumentation and Control (IC)in
the IAEA Programs
  • Programmatic Elements of Subprogramme 1.A.1
  • Nuclear Power Plant Operating Performance and
    Life Cycle Management
  • Engineering and Management Support for
    Competitive Nuclear Power
  • Recurrent Project 1.A.1.01 Continuous Process
    Optimization and Management
  • Recurrent Project 1.A.1.02 Integrated NPP Life
    Cycle Management
  • Recurrent Project 1.A.1.03 Databases to Support
    NPP Performance and Life Cycle Management and
    Improving Human Performance, Quality and
    Technical Infrastructure

12
IAEA NPP IC Activities Project 1.A.1.01.
  • Forms of Activities
  • Consultancy Meetings
  • Technical Meetings
  • Specialist Meetings
  • Advisory Group Meetings
  • Training Courses and Workshops
  • Expert Missions
  • Database Development
  • Coordinated Research Projects
  • National and Regional Technical Cooperation
    Programs

13
IAEA IC-related Meetings in 2004
  • Consultancy Meeting on TECDOC On-line Monitoring
    of Sensor Performance in Nuclear Power Plants,
    Vienna, Austria, March 15-19, 2004 5
    participants from 5 countries
  • Specialist Meeting on Increasing Instrument
    Calibration Interval Through On-line Calibration
    Technology, Halden, Norway, September 27-29,
    2004 84 participants from 21 countries,
    presenting 37 papers
  • Advisory Group Meeting on TECDOC On-line
    Monitoring of Sensor Performance in Nuclear Power
    Plants, Halden, Norway, September 30 - October
    1, 2004 16 participants from 7 countries

14
TECDOCs published in 2004
  • TECDOC - 1389 Managing Modernization of NPP IC
    Systems
  • TECDOC - 1402 Management of life cycle and
    ageing at NPPs Improved IC maintenance

15
IAEA IC-related Consultancy Meetings in 2005
  • Consultancy Meeting to finalize TECDOC On-line
    Monitoring of Sensor Performance in NPPs and
    initiating a TECDOC on On-line Condition
    Monitoring of Equipment and Processes in NPPs
    Using Advanced Diagnostic Systems, Vienna, March
    14-18.
  • Consultancy Meeting to develop an International
    Database on IC upgrading and modernization
    projects in NPPs, Vienna, April 4-6.
  • Consultancy meeting to initiate a TECDOC on
    Implementing and Licensing Digital IC Systems
    and Equipment in NPPs, VTT, Espoo, Finland,
    August 29-31.
  • Consultancy Meeting to initiate a TECDOC on Role
    of IC Systems in Power Up-rating Projects in
    NPPs, Paks NPP, Balatonfüred, Hungary, September
    5-8.

16
Additional IC-Related Consultancy Meetings
planned for 2005
  • Consultancy Meeting to evaluate the working
    version of the International Database on IC
    Upgrading and Modernization Projects in NPPs,
    Vienna, December.
  • Consultancy meeting to initiate a TECDOC on
    "Impact of Restarting Delayed Nuclear Power Plant
    Projects on IC Systems, Vienna, November.

17
Consultancy Meetings 2005On-line Monitoring
  • TECDOC titled On-line Monitoring for Nuclear
    Power Plants. Part 1 - Instrument Channel
    Performance Monitoring to be published in June
    2005
  • Main Benefits of On-line Calibration Monitoring
  • Reduce radiation exposure through elimination of
    unnecessary calibrations
  • Reduce the possibility of instrument damage
    during calibration
  • Reduce the time required and the associated costs
    of important sensor calibration activities during
    plant outages
  • Assessments of the calibration status of
    important sensors are continuously available

18
Consultancy Meetings 2005On-line Monitoring
  • Indirect Benefits of On-line Monitoring
  • Identification of abnormal plant conditions
    through monitoring sensor interrelationships
  • Condition assessment of plant components and
    early warning of sensor or component degradation
    or failure
  • Compression of the information from a multitude
    of sensors which may need to be reviewed to only
    those that are currently being identified by the
    on-line monitoring system as needing attention
  • Faster actions in response to abnormal conditions
    identified due to the above compression of
    information
  • Continuous, real-time performance monitoring of
    plant sensors, components, and systems
  • Validated signals for other computerized tools

19
Consultancy Meetings 2005International Database
on IC Modernization Projects
  • Engineering and project management issues are
    included
  • Database and the related questionnaire will be
    Web-based
  • The Agency is providing an organizational basis
    for experts willing to share their experience in
    NPP IC modernization projects
  • The database will be a valuable source of
    information that can be utilized in the planning
    of future IC modernization projects

20
Consultancy Meetings 2005International Database
on IC Modernization Projects
  • Content of IC Modernization Database
  • Project Objectives
  • Affected Systems/Components
  • Project Description
  • Project Lead Organization
  • Design Phase
  • Testing and Acceptance
  • Training Personnel
  • System Installation
  • Final Documentation
  • OPEX - Event Reports
  • Maintenance Management
  • Indicators of Success
  • Lessons Learned

21
IAEA IC Technical Meetings in 2005
  • Technical Meeting 20th Meeting of the Technical
    Working Group on Nuclear Power Plant Control and
    Instrumentation (TWG-NPPCI), Vienna, May 23-25.
  • Technical Meeting On-line Condition Monitoring
    of Equipment and Processes in NPPs Using Advanced
    Diagnostic Systems hosted by AMS in Knoxville,
    Tennessee, USA, June 27-30.
  • Specialist Meeting Impact of Modern Technology
    on IC in NPPs hosted by EdF in Chatou, France,
    September 13-16.
  • Specialist Meeting Implementing and Licensing
    Digital IC Systems and Equipment in NPPs hosted
    by VTT in Espoo, Finland, November 22-24.

22
IAEA Technical Meeting
  • On-line Condition Monitoring of Equipment and
    Processes in Nuclear Power Plants Using Advanced
    Diagnostic Systems
  •  
  • 27 to 30 June 2005
  • Knoxville, Tennessee
  • USA
  • Announcement

23
IAEA Specialist Meeting
  • Impact of Modern Technology on IC in NPPs
  •  
  • 13 to 16 September 2005
  • Chatou, France
  • Announcement

24
IAEA Specialist Meeting
  • Implementing and Licensing Digital IC Systems
    and Equipment in Nuclear Power Plants
  •  
  • 22 to 26 November 2005
  • Espoo, Finland
  • Announcement

25
(No Transcript)
26
IAEA IC Technical Co-operation Activities in 2005
  • ARG/4/089 Developing prototype IC systems of
    the CAREM reactor's protection system Expert
    Mission, Bariloche, February 21-23
  • IRA/4/035 Commissioning and Site Acceptance
    Tests of IC Systems at the Bushehr NPP, Workshop
    in Tehran, October
  • HUN/4/014 License Renewal of the Paks NPP,
    expert missions, workshops
  • VIE/0/010 Technical Support for Training in
    Nuclear Engineering at Hanoi University of
    Technology, Expert Mission, November
  • RER/4/027 Regional Technical Meeting on IC
    Modernization and Power Up-Rating Projects in
    NPPs, June 13-15, Ljubljana, Slovenia.
  • RER/4/027 Regional Technical Course on
    Optimization of maintenance for NPP (maintenance
    rule, RCM, condition monitoring, risk informed
    approach, outage indicators), Karlsruhe, Germany
    October 24-28.
  • RAS/9/025 Regional Technical Course on Advanced
    IC Systems in NPPs, Republic of Korea in
    November.

27
IAEA IC activities planned for 2006-2007
  • On-line Condition Monitoring of Equipments and
    Processes in NPPs Using Advanced Diagnostic
    Systems (Technical Meeting in 2006)
  • Lessons Learned from Large Modernization Projects
    in IC Systems of NPPs (Specialists Meeting in
    2006)
  • Developing Guidelines for Avoiding Common Cause
    Failures in Digital IC Systems (Consultancy
    Meeting in 2006, Technical Meeting in 2007)
  • Developing Guidelines for Implementing and
    Licensing Digital IC Systems in NPPs
    (Consultancy Meeting in 2006, Technical Meeting
    in 2007)
  • Integration of Analogue and Digital IC Systems
    in Hybrid Main Control Rooms (Consultancy Meeting
    in 2006, Specialists Meeting in 2007)
  • Assessing the Dynamic Response and Effectiveness
    of Reactor Trip Protection Systems and Their
    Instrumentation (Consultancy Meetings in 2006 and
    2007)
  • Bi-annual meeting of the Technical Working Group
    of NPP CI in Vienna (May 2007)

28
IC Activities recommended by TWG in 2003,but
remained un-funded in 2006-2007
  • Cyber Security in IC Applications isolation of
    reactor protection systems security aspect of
    maintenance and modification of IC systems
  • Increasing Power Output by improving flow
    measurement accuracy, flux distribution
    estimation, and utilizing design margins, system
    robustness
  • Avoiding programming errors introduced during
    modifications and maintenance of digital IC
    systems

29
IC tasks directly related to cost effectiveness
  • On-line Monitoring of Sensor Performance and
    Equipment Condition
  • Performing maintenance/calibration only if
    conditions warranted it (as opposed to fixed
    schedule-based maintenance)
  • Reducing the need for maintenance/calibration can
    reduce outage time and radiation exposure of
    maintenance personnel
  • Improving IC Performance in NPP Power Up-rating
    Projects
  • Better instrument accuracy can reduce
    conservative estimates of safety margins, leading
    to potential power up-rate
  • Improving the Implementation and Testing of New
    Digital IC Systems in NPPs
  • IC systems properly implemented and tested with
    high reliability can reduce downtime caused by
    possible failures and defects in digital systems

30
Liaison with other organizations
  • International IC Meetings
  • 4th International Topical Meeting Nuclear Plant
    Instrumentation, Control and Human-Machine
    Interface Technologies (NPICHMIT) Conference,
    Columbus, Ohio, USA, September 19-24, 2004
  • International Electrotechnical Commission IEC /TC
    45 Nuclear Instrumentation Plenary Meeting,
    Buson, Republic of Korea, April 11-14, 2005

31
Technical Working Group on Nuclear Power Plant
Control and Instrumentation (TWG-NPPCI)
  • 20th IAEA TWG Meeting on May 23-25, 2005
  • 29 Member States and 3 International
    Organizations (243 represented)
  • 38 participants 27 members 11 observers
  • 21 new meeting participants
  • Research Institute 18
  • NPP 5
  • Regulator 5
  • Private Company 5
  • Government 4
  • University 1
  • IAEA 6

32
Purpose of the TWG Meeting
  • To discuss current issues of instrumentation and
    control in NPPs, and to address new emerging
    technical challenges
  • To evaluate on-going IAEA IC programmes
    (2004-2005)
  • To solicit hosts and participants for 2006-2007
    meetings
  • To present National Reports and to discuss needs
    of Member States
  • To make recommendations for future IAEA IC
    programmes (next budget cycle 2008-2009)
  • To establish and improve communication channels
    among national representatives

33
  • Participants
  • and
  • Recommendations
  • Technical Working Group Meeting on Nuclear Power
    Plant Control and Instrumentation (TWG-NPPCI)

34
IAEA Publications
  • Safety Standard Series
  • Safety Series
  • Safety Report Series
  • Technical Report Series
  • Technical Document (TECDOC)
  • Accident Response

35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
Technical Publications
  • Technical Report Series (TRS)
  • Technical Document (TECDOC)
  • Accident Response

39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
(No Transcript)
52
(No Transcript)
53
(No Transcript)
54
  • Thank you
  • O.Glockler_at_iaea.org
Write a Comment
User Comments (0)
About PowerShow.com