NFPA 70E Update for ASTM F18 - PowerPoint PPT Presentation

About This Presentation
Title:

NFPA 70E Update for ASTM F18

Description:

The initial paper ballot and the re-circulation ballot were completed in March ... prevent new material from being introduced proposed definitions must be included ... – PowerPoint PPT presentation

Number of Views:415
Avg rating:3.0/5.0
Slides: 11
Provided by: sap78
Category:
Tags: 70e | astm | nfpa | f18 | reintroduced | update

less

Transcript and Presenter's Notes

Title: NFPA 70E Update for ASTM F18


1
NFPA 70E Update for ASTM F18
  • ASTM F18 Representatives for the NFPA 70E TC
  • Allen Bingham, Primary Member
  • Tom Rege, Alternate Member
  • Tom Neal, 2nd Alternate/Proxie
  • Marcia Eblen, 3rd Alternate/Proxie

2
SC2 Report on NFPA 70E ROP Meeting
  • NFPA 70E Technical Committee completed their ROP
    meeting (Report on Proposals) January 16-20, 2007
    in Hilton Head, SC
  • NFPA 70E TC needed to address 579 proposals for
    revisions to the 70E standard
  • Approx. 260 proposals were addressed by five Task
    Groupsthe TG proposed actions for these were
    accepted w/o TC review
  • The remaining 320 proposals were addressed by
    the full 70E TC

3
NFPA 70E ROP Meeting, cont.
  • NFPA 70E committee actions on 579 proposals
  • 177 Accepted
  • 146 Accepted in Principal
  • 15 Accepted in Part
  • 35 Accepted in Principal and Part
  • 206 Rejected

4
NFPA 70E ROP Meeting, cont.
  • NFPA 70E Technical Committee Voting Process
  • At the ROP meeting, a simple majority was needed
    to approve a proposed Committee Action.
  • On the paper ballot, a two thirds majority is
    needed to approve a proposed Committee Action
  • The initial paper ballot and the re-circulation
    ballot were completed in March
  • The Technical Coordinating Committee has or will
    do a review of the ballot results

5
NFPA 70E ROP Meeting, cont.
  • Most contentious proposals related to Scope
    section 90.1(B) regarding the exclusion of
    installations for ships/watercraft, mining,
    railways, communications and utilities.
  • Voting at the meeting on proposals 7, 9, 10, 12,
    13 and 14 was fairly close, i.e. 11 to 7 and 10
    to 7 for eliminating all these exclusions.
  • They were approved with a simple majority at the
    ROP meeting, sustained in initial ballot but the
    utility exclusion was retained in the
    re-circulation ballot.

6
NFPA 70E ROP Meeting, cont.
  • The NFPA 70E Chair formed the Word and Phrase
    Task Group to address the need for consistency in
    the use of the terms live parts and exposed
    live parts and working on or near

7
NFPA 70E ROP Meeting, cont.
  • The Task Group is charged with the following
    instructions
  • Consider all affirmative and negative ballot
    comments in this ROP stage associated with
    proposal sequence number 70E-244 (log 457g) and
    others as they relate to the work of this task
    group.
  • The task group is charged to review how the above
    mentioned terms are used in defining requirements
    in all proposals and in the entirety of NFPA 70E
    Chapters 1, 2, 3, and the proposed Chapter 5.
    Since Chapter 4 is extracted from the NEC, the
    words and phrases can be assumed to be used a
    intended by the NEC.
  • The task group shall consider using the above
    mentioned terms as used in previous editions of
    NFPA 70E.
  • The task group shall consider modifications to
    the above mentioned terms to resolve this issue.
  • The task group shall consider generating one or
    more new terms to provide clarity to these
    concepts. Note that this method will require the
    term be defined. In order to prevent new material
    from being introduced proposed definitions must
    be included in an affirmative or negative ballot
    in the ROP.
  • The task group is charged to resolve this issue.
    Attempt to use existing terms or think outside
    of the box and develop a solution.
  • The task group shall submit comments with
    recommendations to solve the problem prior to the
    comment closing date.
  • If necessary, committee proposals may be
    developed by the task group.

8
NFPA 70E ROP Meeting, cont.
  • Occurrences of on or near in Chapter 1 and
    their probable meaning per the context

Limited Approach Boundary Flash Protection Boundary Limited Approach Flash Protection Boundaries Electrical Hazards Ambiguous
100 Electrically Safe Work Condition 130.7(C)(10) 110.8 110.1 120.2(D)(2)
110.8(A)(1)   110.8(A) 110.6(C)  
130.1(A)(3)   130.1 110.7(B)  
130.4   130.1 FPN No. 2 110.7(E)  
    130.5 110.7(F)  
      110.8(B)  
      120.2  
      130  
9
NFPA 70E ROP Meeting, cont.
  • Next Steps for NFPA 70E Revision Cycle
  • Results of the TC paper ballotApril, 2007
  • ROP document posted for public comment by June
    22, 2007
  • Public comments close August 31, 2007
  • ROC Report on Comments TC meeting October 1-4,
    2007
  • NFPA 70E ROC posted by February 22, 2008
  • 2009 Edition of NFPA 70E published by October 1,
    2008.

10
  • Next Steps for ASTM F18.93 NFPA 70E Task Group
  • Review ROP document posted for public comment by
    June 22, 2007
  • Develop F18 Public comments for submission by
    August 31, 2007
Write a Comment
User Comments (0)
About PowerShow.com