1
IMS Interoperability EvaluationTime Schedule
IMS Plugtest, Turino, Italy, October 8th 2007
2
Agenda Event Preparation (week 40)
  • Telecom Italia opens facilities to participants
  • Installation of IMS equipment
  • Mobile user equipment equipment is checked in TIM
    network
  • Each IMS network vendor has to demonstrate that
  • Own IMS can connect to all participating IMS
    networks
  • Common soft client works with own IMS (simple
    home network call between two soft client
    instances)
  • Own Mobile Terminals and clients have to used
  • ETSI event preparation
  • Scheduling of test team pairs for each test
    session
  • Creation of test report template and collection
    mechanism
  • Defining priorities and sequence for test
    execution
  • Defining terminals and clients used in the
    bilateral sessions

3
Agenda IMS IOP Event (week 41)
  • First half day event introduction, welcome, IMS
    network vendor introductions
  • Then 8 test session with wrap-up/debriefing
  • In each session one or test team pairs execute in
    parallel
  • Each session includes establishment of main test
    configuration, IMS NNI IOP test case execution,
    debugging, collection of test results
  • Wrap up session for presentation and discussion
    of test results
  • Final afternoon for presentation and discussion
    of results from all test sessions
  • Social event?

4
Detailed IMS Interoperability EvaluationTime
Schedule for week 41
5
Room arrangements
  • General public area - Auditorium
  • Public test session rooms
  • For test teams of IMS network vendors
    participating in test sessions
  • Test teams will need to rotate through rooms
    through the event
  • Location for all equipment needed for test
    execution
  • (Mobile) UEs, ASs, analyzers needed for Mw/Gm/ISC
    monitoring
  • Open to any IMS network vendor and operator
  • Private IMS equipment vendor rooms
  • Access only to personnel from one specific IMS
    network vendor
  • For debugging network elements, monitoring
    internal IMS interfaces and configuration of IMS
    network elements
  • Meeting rooms for test team discussions or
    preparation of tests
  • Can be reserved on demand
  • Telecom Italia lab
  • Local IMS network installations and TIM radio
    access network

6
Remote connection
  • Remote connection means that either an entire IMS
    network or components of it are located at a
    remote location
  • IMS P/I/S-CSCF HSS DNS
  • Also support personnel may be located at remote
    site
  • All equipment needed for execution IMS NNI IOP
    test cases and technical expertise must be
    located in Turin
  • User equipment, application servers, analysis
    tools
  • Technical experts
  • Connection of external IMS interfaces with other
    IMS, UE, and AS via VPN connection
  • VPN information of remote site must be made
    available latest by end of August to Telecom
    Italia