Team Wrecked Week 13 Deliverables: Prototype Review

Description:

Team Wrecked. Week 13 Deliverables: Prototype Review. Sponsor. Current Design ... Received bearings, plastic covering for ramp, upper arm, and cocking arm. ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 10
Provided by: garye2
Category:

less

Transcript and Presenter's Notes

Title: Team Wrecked Week 13 Deliverables: Prototype Review


1
Team WreckedWeek 13 Deliverables Prototype
Review
Sponsor
2
Current Design
3
Current State of Build
  • Received bearings, plastic covering for ramp,
    upper arm, and cocking arm.
  • Assembled the base with the supports and laid out
    shaft locations.
  • Motor is being modified to work with our design.

4
Current State of Build
5
Current State of Build
6
Current State of Build
7
Protoype Compromises
  • Motor location was changed because of its size.
  • Funnel will be cut into slightly to make room for
    motor.
  • Netting will compensate for missing funnel area.

8
Prototype Plans
  • Finish modifying the motor.
  • Weld gears to shafts.
  • Mount motor and shafts to the base.
  • Attach chain.
  • Install spring.
  • Cut and mount bucket lid.
  • Form and install funnel.

9
Questions?