1CLINTON PULBIC SCHOOL CPS
Balancing the SY 2009 - 2010 School Budget
2The Budget Process
- Compilation of Wish Lists based upon BOE
adopted goals and objectives - making our budgets
does not come top-down it comes staff to
principal to superintendent - Meetings to determine needs v. wants - aligning
each expenditure with a goal or mission of the
school - Living in the realities of the current economic
climate - Preparation of many drafts - each modification
requires a series of changes to our detailed
budget - Numerous meetings with community to review
necessary cuts to bring the budget into balance
and compliance - Review of budget via community forums and
feedback sessions - Staff input and assessment to assist us in
keeping teachers involved and aware - they are in
the classroom where it all happens!
3Whats New In The New Budget
- Addition of a full-time LMC (Library/Media
Center) Aide to allow for staff member to assume
key aspects of the Enrichment position - Addition of .5 Resource Room teacher as per
student IEPs - New Social Studies Texts grades 5-8 (must be
addressed) - Funds for sorely needed curricular
review/alignment projects (almost all curriculum
guides not aligned to the 2004 NJ CCCS. Should
be done on a five year cycle - Funds for continued staff development in literacy
in accordance with our aggressive three-year plan - Increased funds for LMC Materials only an extra
5,500 - we need your help on this one! - Slight increase in the area of building
maintenance only touches the surface of all that
truly needs to be done
4What Did We Want Need But Could Not Have
- Full-time enrichment teacher to replace a
retiring superstar - Additional .5 guidance counselor for primary-age
children - Funds for major expansion of Library/Media Center
collection - Funds for massive building maintenance needs to
be proactive - Funds to increase services to at-risk students
- Technology infrastructure and hardware growth on
a one-year pause.
5What Had To Be Cut From The Budget
- Retention of a full-time enrichment teacher
- One section of next years grade 2
- One section of another elementary - next years
grade 3 or grade 4 - based upon enrollment _TBD
in June - Special area teachers time adjustment - no
instructional impact for related arts periods - .1 Reduction of the Strings Program (1/2 day of
teacher) - F/T Administrative Assistant scaled back to P/T
- Initial reduction of Supervision for Special
Education Department - Reduction of Academic Assistance Club
- Reduction of a two other clubs (cooking crafts)
- BOE paid 5 per student for field trips, no longer
6Have You Been Able to Restore Anything Yet?
- YES, we have tried! After each BOE meeting, we
have gone over it from scratch and looked to
address the overarching concerns - Elimination of photocopying Dear Parents allowed
for the restoration of two clubs Debate
Volleyball - We reassigned funds to hire a full-time LMC Aide
to allow the LMC Specialist to continue the
Enrichment position - Still have zero activity fee for sports and clubs
- Always looking for ways to enrich the learning
culture of CPS
7You Must Have Some Padding, Right?
- NO, this is a bare bones budget!
- Many districts take the approach of padding the
budget in case it fails. Given the depth of
cuts, it would be irresponsible unconscionable
to knowingly have extra money when you are
talking about the depth of our cuts. We also
feel that such a practice is not in keeping with
the values of this school community.
8However
- In past few weeks, we (the Administrative Team
the BOE) have been the beneficiaries of an
unprecedented level of feedback and productive
input from all facets of the CPS community.
Based upon all that we have learned, and we have
truly listened to each and every concern - We represent the community in service to the
students, thus YOU have helped us to define CPSs
priorities
9Thus, We Propose the Following Ideas
- Eliminate the current model of Special Education
Supervision and replace with an in-house model
(some from current staff) with the same benefits
(Saves an additional 10,000) - Reduce all administrative salaries from the
budgeted amount of 4.35 to a flat 3 (Saves
5,000) - Formally explore the benefits and realities of
implementing a Wrap-Around Kindergarten Program
(provides a community service and dollars could
be used for program restoration). - Consider increasing ChildCare time offerings to
meet the needs of the CPS community (i.e.,
summer)
10Take that 17,000
- Create an instructional aide position dedicated
to assisting the class during the teacher of core
content for whichever grade level (next years
3rd or 4th) has the larger class size. - Restore the former academic assistance
- Add a component of Enrichment to the Summer
School Program
11What Happens if the Budget Fails on April 21st?
- The budget is then turned over to the Clinton
Town Council - They have the legal right to reduce the budget by
any amount in any way they see fit. This is no
reflection of our TCs commitment to CPS, we have
wonderful folks there, but this is about the
process set forth by the State.
12What Would You Cut?
- It would depend upon the size of the cut.
However, the following is a possible list of
draconian options - Reduction of a another grade level homeroom
section. - Reduction of sports, clubs, activities and
special events. - Reduction of specials including vocal music,
instrumental music, and/or art. - Reduction of the entire enrichment position.
- Reduction in supplies, teaching materials, staff
development, and/or textbooks.
13Myths Misunderstandings
- MYTH If a grade level is reduced by a section
that section will never be restored - FACT No, each year, we assess class size on its
own merits, it is one year at-a-time.
14Myths Misunderstandings
- MYTH You already know which grade level you are
going to reduce. - FACT No one has made a decision about which
grade level, we plan to make that decision in
June when we have information which is closest to
what the actual enrollment and needs will be.
15What Can I Do Next?
- Stay involved and informed
- Help us to petition the State for aid which is
more in alignment with our needs - Ask questions of us, give us the chance to answer
you - Continue to establish key communicators to keep
the flow of accurate information alive - Check our website everyday
- Please go out VOTE on April 21st. While no
budget is perfect, this is a budget which we feel
is fiscally conservative, responsible, accurate
of our BOE goals, and one that lessens the impact
as much as possible. We have tried to reflect
our goals, your beliefs, and the needs of a great
bunch of kids in this budget!
16CLINTON PUBLIC SCHOOL CPS
- Balancing the SY 2009 - 2010
- School Budget
172009-2010 Budget Summary
- The range of increases in the past 4 years is
4.1 to 6.4. - State Aid has grown by only 25,000 since 2004.
18Revenue Realities of 2009/2010
- 38 of revenue supporting our general expense
budget is decreasing by 2.5 or 69,830. - 62 of revenue comes from local taxes, increasing
by 187,813 (4.6), or 3.72 when including the
debt fund. - 1.7 State maximum increase, or 117,983 on
6,945,238. Our range of increases in the last 5
years has been 4.1-6.4.
19 Loss of Revenue
- Tuition from sources other than Glen
Gardner has actually increased by over 100,000
in the past two years, offsetting the Glen
Gardner tuition losses
from declining enrollment.
20Salary Benefits
- 84 of our budget is Salary and Benefits.
- 4.18 Average Salary increase - 215,000 cost.
- 15 or 163,000 budgeted for Employee Benefits.
- We are waiting on actual renewal of health plan,
and will compare alternate vendors including
State Plan. Our rate increases in the past three
years have been 3, 0, and 6. We have not been
over 10 since 2003. -
-
21Other Cost Increases
- 44,000 - Year 2 of a 36 month Technology Lease -
Increased for full year payment. Included
network infrastructure, computers, and copiers. - 9,000 - Facility Costs maintained at a 1.7
increase, and include necessary and responsible
preventative maintenance and Consortiums for
energy purchasing. - 20,500 - Library Media Aid for enrichment plan.
-
22Classroom Initiatives
- 10,000 Increased for Social Studies Adoption
for grades 5-8. - 13,000 - Literacy initiatives to be prioritized
by teacher committee. - 13,803 - Professional Development fully funded
by NCLB. - 6,000 - Local Budget includes Rutgers Literacy.
- 15,000 Increased Curriculum Writing
23Cost Reductions in 2009/2010
- 280,000 - Salary and Benefit.
- 85,000 - Tuition placements out of district.
- 15,000 - Transportation
- 15,000 - OT/PT funded by IDEA Grant
- 3,000 Field Trips Fees
- 398,000 - Total Major Reductions
24School Tax Impact
- Taxes are increasing by 139 on a 373,163
average assessed home in Clinton. - Formula Assessment/100 x Tax Rate
- Example 373,163/100 x 1.1099 4,142
- Tax rate is increasing from 1.0727 to 1.1099 or
3.72 cents. No major change in assessments. - We would need to cut our budget 85,000 to affect
the tax rate by one cent- Town collects ½ of
08/09 and ½ of 09/10 tax levy in 2009.
25Facility Budget
- Routine Maintenance plans for Roof and HVAC
Systems. - Required repairs on boilers, roof soffit, and
HVAC dampers. - Capital Reserve Deposit (40-50 of actual need)
toward replacement of 2nd Floor Roof- funded by
surplus. - Energy Projects identified in Energy Audit are
under review along with current debt refinance
and recent legislation to minimize future tax
impact.
26Progress for our Roof
- 1996 Main Rubber Roof had a major warranty
overhaul this fall Facility Manager convinced
Manufacturer of premature failure. Estimated
good for another 7 years in line with debt
maturity, and deferring the 500,000 cost to
replace when it can be accomplished without
increased debt taxes. - 2nd Floor Roof was repaired in the fall, with no
leaks to date. Good for another year, but needs
replacement. State Facility Grant awarded - 40
reimbursement from State upon completion. - West side of Gym Roof recently replaced by
insurance claim for wind damage.
27Delayed Facility Projects
- Resurfacing of gym floor and Stage
- Classroom Tile in rooms 33 and 36
- Kitchen Oven Hood
- 2nd Floor Classroom Doors
- Gym Hot Water Heater
- New Windows for 2nd Floor
- Classroom Speakers and Clocks
- 2 Water Fountains
- Resealing of Parking Lot
-