BULGARIA PRODUCTIVITY - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

BULGARIA PRODUCTIVITY

Description:

SALES / TECHNICAL / PLANNING / CONTROL / QUALITY / LOGISTICS ... Example: Folder for front placket reduces work content by 6 standard minutes ... – PowerPoint PPT presentation

Number of Views:168
Avg rating:3.0/5.0
Slides: 23
Provided by: pcol8
Category:

less

Transcript and Presenter's Notes

Title: BULGARIA PRODUCTIVITY


1
BULGARIA PRODUCTIVITY
  • PDA INTERNATIONAL

2
BULGARIA PRODUCTIVITY
  • PDA INTERNATIONAL
  • PHIL DOWNING - GROUP MANAGING
  • DIRECTOR
  • UK CONSULTANCY 1982
  • 4,000 EU SUPPORTED PROJECTS
  • BULGARIA MANUFACTURING 1995 CLOTHING /
    ENGINEERING

3
BULGARIA PRODUCTIVITY
  • PDA
  • SALES / TECHNICAL / PLANNING / CONTROL / QUALITY
    / LOGISTICS
  • Currently working with over 40 BG companies
    manufacturing for UK customers

4
BULGARIA PRODUCTIVITY
  • CONCERNS
  • GLOBAL INFLATION
  • RISING COSTS
  • LOW EFFICIENCY (30)
  • STAFF WAGE RISES
  • SKILLED OPERATOR MIGRATION
  • CUSTOMERS MOVING FURTHER EAST

5
BULGARIA PRODUCTIVITY
  • PRODUCTIVITY
  • HISTORY OF PRODUCTIVITY
  • 19TH CENTURY INDUSTRIAL
    REVOLUTION
  • TAYLOR 1920s WORKING PRACTICES
  • USA 1940s TOTAL QUALITY
    MANAGEMENT
  • 1950s WORK STUDY Method
    Study / Time Study
  • WILSON 1969 PRODUCTIVITY DEALS
    WITH UK UNIONS
  • 70s / 80s / 90s MARKET GROWTH
  • EU FUNDED CONSULTANCY ASSISTANCE SMEs
  • MANUFACTURING ADVISORY SERVICE
  • 2000 LEAN

6
BULGARIA PRODUCTIVITY
  • BULGARIA CURRENT MANUFACTURING SITUATION
  • LOW EFFICIENCY Estimated 25 to 45 (UK 70)
  • RISING COSTS
  • MIGRATION OF STAFF
  • ACCURATE COSTING
  • PRODUCTION PLANNING
  • MATERIALS SUPPLY
  • PRODUCTION CONTROL
  • OPERATOR MOTIVATION / PERFORMANCE
  • MANAGEMENT SKILLS / TECHNIQUES
  • GOOD QUALITY CULTURE
  • MIDDLE FAR EAST THREAT
  • EU FUNDING CONFUSIONS

7
BULGARIA PRODUCTIVITY
  • REFERENCE PERIOD MEASURES
  • OUTPUT
  • INPUT
  • EFFICIENCY
  • PROFIT PERFORMANCE
  • COSTS

8
BULGARIA PRODUCTIVITY
  • STANDARD COSTING
  • A system based on standards which are used
    to
  • Determine sales cost of products
  • Plan production
  • Monitor production
  • Measure variances / take action
  • Standard / Actual / Variance / Action

9
BULGARIA PRODUCTIVITY
  • COMPUTATION OF PRODUCT STANDARD COST
  • Direct Materials usage, cost, contingency,
    product cost
  • Standard Hour work content of Product
  • Direct Wages / Cost per standard hour / Product
    cost
  • Total Direct Cost (Materials Wages)
  • Overheads / fixed Costs
  • Total factory / Works Cost
  • Net Profit
  • Gross Profit / Contribution
  • Selling Price to Customer
  • Contribution per Standard Hour

10
BULGARIA PRODUCTIVITY
  • PRODUCTION PLANNING
  • LINE CAPACITY PER WEEK
  • PRODUCT WORK CONTENT
  • DELIVERY DATE TARGET
  • MATERIALS AVAILABILITY

11
BULGARIA PRODUCTIVITY
  • PRODUCTION CONTROL
  • To promote action on variances from planning
    targets
  • LINE CAPACITY
  • LINE EFFICIENCY
  • CLEAN ORDER / MATERIALS
  • QUALITY
  • OTHER

12
BULGARIA PRODUCTIVITY
  • OPERATOR FINANCIAL INCENTIVE
  • Vital for company success
  • Individual Daily or weekly
  • Team Daily or weekly
  • Group Weekly
  • Factory Weekly or monthly
  • IMPORTANT TO MEASURE CONTROL

13
BULGARIA PRODUCTIVITY
  • FACTORY LAYOUT
  • Minimum waste LEAN on movement of materials in
    progress.
  • Ideal factory layout for FLOW PROCESS CONTROL
  • VISUAL
  • CLEAN TIDY

14
BULGARIA PRODUCTIVITY
  • METHODS AND WORK AIDS
  • Investigate each product for method improvements
    that reduce the work content and or increases
    quality standard
  • Example Folder for front placket reduces work
    content by 6 standard minutes
  • Machinery / Equipment costs, savings and payback
    by reduction

15
BULGARIA PRODUCTIVITY
  • LINE SET UP AND BALANCING
  • DEFINITION
  • LINE SET UP is the theoretical plan of a
    certain style to provide maximum efficiency
    whilst achieving promised delivery dates.

16
BULGARIA PRODUCTIVITY
  • INFORMATION REQUIRED
  • OPERATION BREAKDOWN Description of
    operation, method etc
  • SMs PER OPERATION Cycle time based on
    method equipment
  • TOTAL STANDARD MINUTES For Capacity Planning,
    costing etc
  • MACHINE / EQUIPMENT Basis for standard
    minutes
  • Eg Integrated sewing unit 3.00
    SMs
  • Plain lockstitch
    5.50 SMs
  • PLAN QUANTITY PER WEEK Customer requirement or
    capacity

17
BULGARIA PRODUCTIVITY
18
BULGARIA PRODUCTIVITY
19
BULGARIA PRODUCTIVITY
20
BULGARIA PRODUCTIVITY
  • SUMMARY
  • REFERENCE PERIOD / HISTORY
  • STANDARD COSTING
  • PRODUCTION PLANNING
  • PRODUCTION CONTROL
  • FACTORY LAYOUT
  • METHODS
  • FINANCIAL INCENTIVE SCHEME
  • LINE SET UP
  • QUALITY CONTROL
  • MANAGEMENT CONTROL
  • TRAINING
  • CONTINUOUS IMPROVEMENT

21
BULGARIA PRODUCTIVITY
  • PLAN
  • SHOWCASE PROJECT
  • EXAMPLE TO OTHER COMPANIES
  • PROOF OF WHAT CAN BE DONE

22
BULGARIA PRODUCTIVITY
  • QUESTIONS
  • ELECTRONIC COPY OF SLIDES
  • THANK YOU FOR YOUR TIME
Write a Comment
User Comments (0)
About PowerShow.com